Permit: TC-COM-0623-01460
Permit Details
Apply Date:
06/08/2023
Applicant:
Robert Joyce
Description:
Construction of new walls for a dispensary fit-out
Permit Reviews
Permit Number - TC-COM-0623-01460
Permit Status: Complete
Permit Description: Construction of new walls for a dispensary fit-out
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/17/2023 | RESTAMP - COMMERCIAL v.1 | 10/19/2023 | APPROVED |
06/08/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/27/2023 | REQUIRES RESUBMIT |
09/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/10/2024 | APPROVED |
08/20/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/22/2024 | REQUIRES RESUBMIT |
09/18/2023 | COMMERCIAL REVIEW - FULL v.4 | 10/17/2023 | APPROVED |
08/04/2023 | COMMERCIAL REVIEW - FULL v.3 | 09/05/2023 | REQUIRES RESUBMIT |
07/12/2023 | COMMERCIAL REVIEW - FULL v.2 | 07/24/2023 | REQUIRES RESUBMIT |
08/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/26/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0623-01460
Permit Status: Complete
Permit Description: Construction of new walls for a dispensary fit-out
Date | Description | Comments |
---|---|---|
09/19/2023 | AIR BALANCING REPORT IS REQUIRED. | |
08/08/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
10/19/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
08/26/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
08/26/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
08/08/2023 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
08/08/2023 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0623-01460
Permite Description: Construction of new walls for a dispensary fit-out
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/23/2024 | COT - HCEL - Electrical Progress | N/A | Partial Pass | Interior electric underground is complete. Ok to cover progress areas. |
08/15/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
05/08/2024 | COT - HCBU - Framing | N/A | Partial Pass | 5/8/24: framing at new portion walls passed ok to proceed. |
07/18/2024 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 5/8/24: electrical in new partition walls passed. Ok to drywall both sides. 7/18/24: Electrical underground from 200Amp service passed ok to backfill. |
05/08/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 5/8/24: plumbing in new partition walls passed. Ok to drywall both sides. |
08/16/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
08/15/2024 | COT - HCPL - Plumbing Final | N/A | Not Ready | |
08/16/2024 | COT - HCME - Mechanical Final | N/A | Re-inspection required | 8/16/24: Address HVAC issues on roof( j-box need cover plates, insulation at refrigerant lines need to be UV coated, Disconnect box at condenser not grounded), thermostat wire running through empty disconnect box mist be removed from disconnect, T&B report must be submitted and approved by city, pending (fire,engineering,row), pending other reports prior to final. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0623-01460
Permit Description: Construction of new walls for a dispensary fit-out
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2024 | COT - HCEL - Electrical Underground | Passed | 7/18/24: Electrical underground from 200Amp service passed ok to backfill. | |
07/29/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
07/29/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
08/13/2024 | COT - HCEL - Electrical Final | Passed | 8/13/24: corrections made | |
08/15/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
08/15/2024 | COT - HCBU - Building Progress | Passed | ||
08/15/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
08/15/2024 | COT - HCBU - Framing | Passed | ||
08/15/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
08/15/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
08/15/2024 | COT - HCME - Mechanical Progress | Passed | ||
08/15/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
08/16/2024 | ENGR Engineering Final | Passed | Ok for Level 4 Temporary Certificate of Occupancy | |
08/16/2024 | COT - FCON - Fire - Final | Passed | ||
08/16/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
08/16/2024 | COT - HCPL - Plumbing Progress | Passed | ||
08/16/2024 | COT - HCPL - Plumbing Final | Passed | ||
08/20/2024 | COT - HCME - Mechanical Final | Passed | 8/16/24: Address HVAC issues on roof( j-box need cover plates, insulation at refrigerant lines need to be UV coated, Disconnect box at condenser not grounded), thermostat wire running through empty disconnect box mist be removed from disconnect, T&B report must be submitted and approved by city, pending (fire,engineering,row), pending other reports prior to final. 8/20/24: Corrections made. Passed |
|
08/21/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
09/13/2024 | COT - HCBU - CofO | Passed | OK to make application for Certificate of Occupancy | |
09/13/2024 | COT - HCBU - Building Final | Passed |