Inspection History Details
Inspection Status: Passed
Inspection History: COT - HCME - Mechanical Final
Permit Number - TC-COM-0623-01460
Inspection Description - COT - HCME - Mechanical Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
COT - HCME - Mechanical Final | Passed | 8/16/24: Address HVAC issues on roof( j-box need cover plates, insulation at refrigerant lines need to be UV coated, Disconnect box at condenser not grounded), thermostat wire running through empty disconnect box mist be removed from disconnect, T&B report must be submitted and approved by city, pending (fire,engineering,row), pending other reports prior to final. 8/20/24: Corrections made. Passed |
||
08/12/2024 | COT - HCME - Mechanical Final | Not Ready | ||
08/16/2024 | COT - HCME - Mechanical Final | Re-inspection required | 8/16/24: Address HVAC issues on roof( j-box need cover plates, insulation at refrigerant lines need to be UV coated, Disconnect box at condenser not grounded), thermostat wire running through empty disconnect box mist be removed from disconnect, T&B report must be submitted and approved by city, pending (fire,engineering,row), pending other reports prior to final. |