Permit: TC-COM-0525-00980
Permit Details
Apply Date:
05/13/2025
Applicant:
Araceli Juarez
Description:
CIP-0924-00032 Restroom renovation, pavilion, light poles.
Permit Reviews
Permit Number - TC-COM-0525-00980
Permit Status: Inspections
Permit Description: CIP-0924-00032 Restroom renovation, pavilion, light poles.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/15/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 05/29/2025 | REQUIRES RESUBMIT |
| 06/02/2025 | RESTAMP - COMMERCIAL v.1 | 06/05/2025 | APPROVED |
| 05/30/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 06/02/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0525-00980
Permit Status: Inspections
Permit Description: CIP-0924-00032 Restroom renovation, pavilion, light poles.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/20/2025 | Post-Installed Anchor Inspection Report is required. |
| 05/30/2025 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
| 06/03/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0525-00980
Permit Status: Inspections
Permit Description: CIP-0924-00032 Restroom renovation, pavilion, light poles.
| Date | Description | Comments |
|---|---|---|
| 05/20/2025 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 06/05/2025 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
| 05/20/2025 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 05/20/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 05/20/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 05/20/2025 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0525-00980
Permite Description: CIP-0924-00032 Restroom renovation, pavilion, light poles.
Total Outstanding Inspections - 13
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - FCON - Sprinkler - Final | N/A | Not Ready | Asking Sprinkler questions | |
| 12/05/2025 | COT - LCPL - Yard Water Line | N/A | Partial Pass | NOTE: This inspection is for 401 E. 22nd Street: 2” water line from back-flow preventer to new restrooms; approximately 320 feet. Ok to cover progress areas. |
| 01/07/2026 | COT - LCEL - Outdoor Lighting | N/A | Partial Pass | Total of 4 light pole bases at southwest of park along the sidewalk. Depth along with the reinforcement per plan. Okay for concrete placement. 1/7/2025 |
| 03/24/2026 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Canceled | 3-24-26: call these inspections under your development package plans (engineering). |
| 03/24/2026 | COT - LCBU - Preslab | N/A | Canceled | 3-24-26: call these inspections under your development package plans (engineering). |
| COT - LCEL - Electrical Intermediate | N/A | Scheduled | ||
| COT - LCME - Mechanical Final | N/A | Scheduled | ||
| COT - LCEL - Electrical Above Ceiling | N/A | Scheduled | ||
| 01/16/2026 | COT - LCEL - Electrical Underground | N/A | Partial Pass | Two historical light pole bases approved. Okay for concrete placement. (Near the building. 30” diameters) 1/15/2026 |
| 01/16/2026 | COT - LCEL - Grounding/Bonding | N/A | Partial Pass | Two historical light pole bases approved. Okay for concrete placement. (Near the building. 30” diameters) 1/15/2026 |
| 01/05/2026 | COT - LCPL - Rough Soil | N/A | Partial Pass | West portion of site area, approximately 115’ of 2” water line. Ok to cover progress area. |
| COT - LCBU - Roof Nailing | N/A | Scheduled | ||
| COT - LCBU - Framing | N/A | Scheduled |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0525-00980
Permit Description: CIP-0924-00032 Restroom renovation, pavilion, light poles.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2025 | COT - LCPL - Sewer | Passed | Sewer line from bathroom to exterior sewer line. | |
| 03/03/2026 | COT - LCEL - Outdoor Lighting | Passed | Light poles throughout renovation area: wired and grounded. |
Scheduled Inspections
Scheduled Inspections - TC-COM-0525-00980
Status: Inspections
Description: CIP-0924-00032 Restroom renovation, pavilion, light poles.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 04/06/2026 | COT - LCEL - Electrical Underground | Scheduled | |
| 04/06/2026 | COT - LCBU - Roof Nailing | Scheduled | |
| 04/06/2026 | COT - LCBU - Framing | Scheduled | |
| 04/06/2026 | COT - LCPL - Rough Soil | Scheduled | |
| 04/06/2026 | COT - LCEL - Electrical Above Ceiling | Scheduled | |
| 04/06/2026 | COT - LCEL - Electrical Intermediate | Scheduled | |
| 04/06/2026 | COT - LCME - Mechanical Final | Scheduled | |
| 04/06/2026 | COT - LCEL - Grounding/Bonding | Scheduled |