Inspection Status: Partial Pass
Inspection History: COT - LCBU - Excavation/Rebar/Zoning
| Date |
Description |
Inspector |
Results |
Comments |
| 01/05/2026 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
Rebar cages for 8 light poles at dog park. |
| 01/07/2026 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
Total of 4 light pole bases at southwest of park along the sidewalk. Depth along with the reinforcement per plan. Okay for concrete placement. 1/7/2025 |
| 01/16/2026 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
Two historical light pole bases approved. Okay for concrete placement. (Near the building. 30” diameters) 1/15/2026 |
| 03/03/2026 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
Ramp area, stage area canopy footings, flower bed areas. Ok,to place,concrete,when,abandoned plumbing lines have,been removed. |
| 03/24/2026 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Canceled |
3-24-26: call these inspections under your development package plans (engineering). |
| 12/22/2025 |
COT - LCBU - Excavation/Rebar/Zoning |
|
Partial Pass |
Eight light pole caissons with cages in dog park area; need to set ufers in -regress areas. |