Permit Details

Status:
Issued
Type:
Commercial Building
Address:
450 S TOOLE AV
Address NEW:
450 S TOOLE AV
Apply Date:
05/02/2025
Applicant:
Jessica OBrien
Description:
Install (1) new equipment shelter, (1) new concrete pad. Install (1) new concrete side walk and concrete entry pad to data center.

Permit Reviews

Permit Number - TC-COM-0525-00891
Permit Status: Issued
Permit Description: Install (1) new equipment shelter, (1) new concrete pad. Install (1) new concrete side walk and concrete entry pad to data center.
Start Date Submittal Complete Date Status  
05/07/2025 COMMERCIAL REVIEW - LIMITED v.1 05/07/2025 REQUIRES RESUBMIT Review Details
04/27/2026 COMMERCIAL REVIEW - LIMITED v.4 05/08/2026 APPROVED Review Details
06/02/2025 COMMERCIAL REVIEW - LIMITED v.2 06/20/2025 REQUIRES RESUBMIT Review Details
05/08/2026 ADMINISTRATIVE v.1 05/08/2026 REQUIRES RESUBMIT Review Details
04/24/2026 COMMERCIAL REVIEW - LIMITED v.3 04/24/2026 REQUIRES RESUBMIT Review Details
05/08/2026 RESTAMP - COMMERCIAL v.1 05/13/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0525-00891
Permit Status: Issued
Permit Description: Install (1) new equipment shelter, (1) new concrete pad. Install (1) new concrete side walk and concrete entry pad to data center.
Total Outstanding Activity Conditions - 3
Date Name
05/07/2026 SPECIAL INSPECTION FOR Soil Bearing Capacity, SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/10/2025 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
06/10/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.

Conditions

Permit Number - TC-COM-0525-00891
Permit Status: Issued
Permit Description: Install (1) new equipment shelter, (1) new concrete pad. Install (1) new concrete side walk and concrete entry pad to data center.
Date Description Comments
06/02/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
05/07/2026 Please submit a copy of the State of Arizona Installation Permit.
06/10/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
05/07/2026 Submit a copy of the State approved construction document drawings containing their seal of approval.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0525-00891
Permite Description: Install (1) new equipment shelter, (1) new concrete pad. Install (1) new concrete side walk and concrete entry pad to data center.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
06/22/2026 COT - RSBU - Excavation/Rebar/Zoning N/A Partial Pass 6-22-26: excavation/reinforcement for footings/ slab on grade verified per plans. Okay for concrete placement.
08/25/2026 COT - LCEL - Electrical Underground N/A Partial Pass 8-25-26: verified trench depth at 3' on 4-4" & 2-3" schedule 40 conduits together with grounding rods at every 15' cad-welded to copper using a complete grounding ring around shelter building. Conduits & grounding verified per E1.0/Site Electrical & Grounding Plan. Okay to backfill progress areas using shading materials.
11/04/2026 COT - LCEL - Electrical Final N/A Re-inspection required HVAC #1 calls for 125. 100 amp in place. Future HVAC #5 calls for 70. 100 amp in place. Provide cover plates at open j boxes. Ensure all boxes are labeled. Provide labeling for main distribution panel. Provide full size breaker covers for blanks. Provide torque reports with letter head and upload them to dashboard prior to final. 11/4/2026

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW