Permit Details

Status:
Complete
Type:
Commercial Building
Address:
720 S 6TH AV
Address NEW:
720 S 6TH AV
Apply Date:
05/20/2024
Applicant:
Description:
Interior remodel of existing building

Permit Reviews

Permit Number - TC-COM-0524-00969
Permit Status: Complete
Permit Description: Interior remodel of existing building
Start Date Submittal Complete Date Status  
07/15/2024 RESTAMP - COMMERCIAL v.1 07/22/2024 APPROVED Review Details
05/23/2024 COMMERCIAL REVIEW - LIMITED v.1 06/11/2024 REQUIRES RESUBMIT Review Details
06/24/2024 COMMERCIAL REVIEW - LIMITED v.2 07/15/2024 APPROVED Review Details
07/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/30/2025 APPROVED Review Details
06/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/25/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0524-00969
Permit Status: Complete
Permit Description: Interior remodel of existing building
Date Description Comments
06/10/2024 AIR BALANCING REPORT IS REQUIRED.
06/11/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
06/11/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/23/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
06/11/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/11/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/11/2024 SPECIAL INSPECTION FOR REINFORCING STEEL IS REQUIRED.
06/10/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0524-00969
Permite Description: Interior remodel of existing building
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/30/2024 BULD - Electrical Clearance N/A Not Ready
10/30/2024 COT - LCPL - Gas Pressure Test N/A Not Ready Will reschedule when gas service is complete.
10/30/2024 COT - LCEL - Grounding/Bonding N/A Not Ready
10/30/2024 COT - LCEL - Electrical Underground N/A Not Ready
05/22/2025 COT - HCBU - TCO N/A Re-inspection required 5/22/25: Anti-tip not installed at range, light fixtures must be installed at time of final inspection, Receptacles with no equipment ground are required to be on GFCI receptacles with a label reading “no equipment ground” (406.4(D)(2)), ADA requirements not met at ADA restroom, GFCI required at mechanical room, Air handler is being over amped, mini splits are being over amped, air handler is being over amped, all refrigeration lines must be coated for UV protection, lock out caps at condenser required, exterior receptacle must be WR and GFCi protected. Label all circuits at main panel, Conditions have not been satisfied.
05/22/2025 COT - LCBU - Building Final N/A Re-inspection required 5/22/25: Anti-tip not installed at range, light fixtures must be installed at time of final inspection, Receptacles with no equipment ground are required to be on GFCI receptacles with a label reading “no equipment ground” (406.4(D)(2)), ADA requirements not met at ADA restroom, GFCI required at mechanical room, Air handler is being over amped, mini splits are being over amped, air handler is being over amped, all refrigeration lines must be coated for UV protection, lock out caps at condenser required, exterior receptacle must be WR and GFCi protected. Label all circuits at main panel, Conditions have not been satisfied.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0524-00969
Permit Description: Interior remodel of existing building
Total Completed Inspections - 23
Date Description Inspector Results Comments
10/30/2024 COT - LCPL - Rough Soil Passed Ok to cover progress areas.
01/03/2025 BULD - Electrical Clearance Passed No clearance required.
01/03/2025 COT - LCPL - Gas Pressure Test Passed
01/03/2025 COT - LCPL - Plumbing Intermediate Passed
01/03/2025 COT - LCME - Mechanical Intermediate Passed
01/03/2025 COT - LCEL - Grounding/Bonding Passed
01/03/2025 COT - LCEL - Electrical Underground Passed
01/03/2025 COT - LCEL - Electrical Progress Passed
01/03/2025 COT - LCEL - Electrical Intermediate Passed Ok to insulate and cover walls.
01/03/2025 COT - LCBU - Roof Nailing Passed
01/03/2025 COT - LCBU - Preslab Passed
01/03/2025 COT - LCBU - Framing Passed
01/03/2025 COT - LCEL - Electrical Above Ceiling Passed
01/03/2025 COT - LCBU - Excavation/Rebar/Zoning Passed
05/08/2025 COT - LCEL - Outdoor Lighting Passed
05/27/2025 COT - FCON - Fire - Final Passed
05/22/2025 COT - LCME - Mechanical Final Passed
05/22/2025 ENGR Engineering Final Passed At NW corner of building is access to lower crawl space. It is a loose piece of plywood. Should be secured.
05/22/2025 COT - LCPL - Plumbing Final Passed
05/22/2025 COT - LCEL - Electrical Final Passed
05/29/2025 COT - HCBU - TCO Passed All corrections have been completed. 5/29/2025
05/29/2025 COT - LCBU - Building Final Passed All corrections have been completed. 5/29/2025
06/12/2025 COT - BULD - SWG Clearance Passed 6/12/25: SWG CLEARANCE

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
EVALUATION OF SPECIAL INSPECTION REQUIREMENTS-2025-07-23_V1.PDF DOCUMENTS VIEW
CAPTURE PRIMAVERA 5 POINTS QUOTE SIGNED_V1.PDF DOCUMENTS VIEW
TC-COM-0524-00969, WATER TEST -25E0668_1 TURNER 05 29 2025 1309-2025-06-25_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-1853 PRIMAVERA 5 POINTS RENO_PERMIT SET_R1_06.23.24_V2.PDF DOCUMENTS VIEW
1853 PRIMAVERA 5 POINTS RENO_PROJECT MANUAL_R1_06.23.24_V2.PDF DOCUMENTS VIEW
PRIMAVERA 5 POINTS RENO_STRUCTURAL CALCS_04.12.24_V2.PDF DOCUMENTS VIEW
TC-COM-0524-00969 PERMIT REVIEW COMMENTS RESPONSE LETTER_V1.PDF DOCUMENTS VIEW