Permit: TC-COM-0524-00912
Permit Details
Apply Date:
05/13/2024
Applicant:
Caryn Bailey
Description:
TENANT IMPROVEMENT CONSISTING OF A BUILD-OUT OF EXISTING SHELL BUILDING LEASE SPACE AT B-3 TRIANGLE SHOPS (SHOPPING CENTER) WHICH INCLUDES NEW INTERIOR WALLS, NEW FLOORING AND WALL FINISHES AND NEW DRYWALL AND ACOUSTICAL CEILING, NEW LIGHT FIXTURES THROUGHOUT, NEW FIXTURES. (1) NEW ADA ACCESSIBLE TOILET ROOM, DRINKING FOUNTAINS AND MOP SINK. SEE ENGINEERING DRAWINGS FOR SCOPE OF MECHANICAL, PLUMBING AND ELECTRICAL WORK. THERE IS NO STRUCTURAL OR EXTERIOR WORK REQUIRED ON THIS PROJECT.
Permit Reviews
Permit Number - TC-COM-0524-00912
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT CONSISTING OF A BUILD-OUT OF EXISTING SHELL BUILDING LEASE SPACE
AT B-3 TRIANGLE SHOPS (SHOPPING CENTER) WHICH INCLUDES NEW INTERIOR WALLS, NEW
FLOORING AND WALL FINISHES AND NEW DRYWALL AND ACOUSTICAL CEILING, NEW LIGHT
FIXTURES THROUGHOUT, NEW FIXTURES. (1) NEW ADA ACCESSIBLE TOILET ROOM, DRINKING
FOUNTAINS AND MOP SINK.
SEE ENGINEERING DRAWINGS FOR SCOPE OF MECHANICAL, PLUMBING AND ELECTRICAL WORK.
THERE IS NO STRUCTURAL OR EXTERIOR WORK REQUIRED ON THIS PROJECT.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/18/2024 | RESTAMP - COMMERCIAL v.1 | 07/23/2024 | REQUIRES RESUBMIT |
10/08/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/08/2024 | APPROVED |
06/07/2024 | COMMERCIAL REVIEW - LIMITED v.2 | 06/24/2024 | REQUIRES RESUBMIT |
05/16/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 06/04/2024 | REQUIRES RESUBMIT |
06/28/2024 | COMMERCIAL REVIEW - LIMITED v.3 | 07/18/2024 | APPROVED |
07/23/2024 | RESTAMP - COMMERCIAL v.2 | 07/29/2024 | APPROVED |
08/13/2024 | COMMERCIAL REVIEW - FULL v.1 | 09/10/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0524-00912
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT CONSISTING OF A BUILD-OUT OF EXISTING SHELL BUILDING LEASE SPACE
AT B-3 TRIANGLE SHOPS (SHOPPING CENTER) WHICH INCLUDES NEW INTERIOR WALLS, NEW
FLOORING AND WALL FINISHES AND NEW DRYWALL AND ACOUSTICAL CEILING, NEW LIGHT
FIXTURES THROUGHOUT, NEW FIXTURES. (1) NEW ADA ACCESSIBLE TOILET ROOM, DRINKING
FOUNTAINS AND MOP SINK.
SEE ENGINEERING DRAWINGS FOR SCOPE OF MECHANICAL, PLUMBING AND ELECTRICAL WORK.
THERE IS NO STRUCTURAL OR EXTERIOR WORK REQUIRED ON THIS PROJECT.
Date | Description | Comments |
---|---|---|
07/23/2024 | AIR BALANCING REPORT IS REQUIRED. | |
05/16/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
06/24/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0524-00912
Permite Description: TENANT IMPROVEMENT CONSISTING OF A BUILD-OUT OF EXISTING SHELL BUILDING LEASE SPACE
AT B-3 TRIANGLE SHOPS (SHOPPING CENTER) WHICH INCLUDES NEW INTERIOR WALLS, NEW
FLOORING AND WALL FINISHES AND NEW DRYWALL AND ACOUSTICAL CEILING, NEW LIGHT
FIXTURES THROUGHOUT, NEW FIXTURES. (1) NEW ADA ACCESSIBLE TOILET ROOM, DRINKING
FOUNTAINS AND MOP SINK.
SEE ENGINEERING DRAWINGS FOR SCOPE OF MECHANICAL, PLUMBING AND ELECTRICAL WORK.
THERE IS NO STRUCTURAL OR EXTERIOR WORK REQUIRED ON THIS PROJECT.
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/13/2024 | COT - HCEL - Electrical Underground | N/A | Not Applicable | 8/13/24: duplicate |
09/30/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
09/30/2024 | COT - LCBU - Building Final | N/A | Re-inspection required | 9/30/24: pending Air Balance report and water sterilization report, UV coat all exterior piping on roof, egress label at doors required |
09/30/2024 | COT - LCEL - Electrical Final | N/A | Re-inspection required | 9/30/24: pending Air Balance report and water sterilization report, UV coat all exterior piping on roof, |
09/30/2024 | COT - LCME - Mechanical Final | N/A | Re-inspection required | 9/30/24: pending Air Balance report and water sterilization report, UV coat all exterior piping on roof, egress label at doors required |
09/30/2024 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | 9/30/24: pending Air Balance report and water sterilization report, UV coat all exterior piping on roof, |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0524-00912
Permit Description: TENANT IMPROVEMENT CONSISTING OF A BUILD-OUT OF EXISTING SHELL BUILDING LEASE SPACE
AT B-3 TRIANGLE SHOPS (SHOPPING CENTER) WHICH INCLUDES NEW INTERIOR WALLS, NEW
FLOORING AND WALL FINISHES AND NEW DRYWALL AND ACOUSTICAL CEILING, NEW LIGHT
FIXTURES THROUGHOUT, NEW FIXTURES. (1) NEW ADA ACCESSIBLE TOILET ROOM, DRINKING
FOUNTAINS AND MOP SINK.
SEE ENGINEERING DRAWINGS FOR SCOPE OF MECHANICAL, PLUMBING AND ELECTRICAL WORK.
THERE IS NO STRUCTURAL OR EXTERIOR WORK REQUIRED ON THIS PROJECT.
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/13/2024 | COT - LCPL - Rough Soil | Passed | 8/13/24: okay to backfill with approved shading material. | |
08/16/2024 | COT - LCBU - Preslab | Passed | 8/16/24: Preslab reinforcement passed ok to pour. | |
08/29/2024 | COT - LCBU - Framing | Passed | ||
09/12/2024 | BULD - Electrical Clearance | Passed | Approved new 200A service - ECO Clearance to TEP is required for unit #112 | |
09/16/2024 | COT - LCEL - Electrical Above Ceiling | Passed | ||
09/16/2024 | COT - LCME - Mechanical Intermediate | Passed | ||
09/16/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
09/16/2024 | COT - LCEL - Electrical Intermediate | Passed | ||
09/30/2024 | COT - FCON - Fire - Final | Passed | ||
09/30/2024 | COT - FCON - Sprinkler - Final | Passed | ||
09/30/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
09/30/2024 | ENGR Engineering Final | Passed | ||
10/08/2024 | COT - LCBU - Building Final | Passed | 9/30/24: pending Air Balance report and water sterilization report, UV coat all exterior piping on roof, egress label at doors required 10/8/24: all corrections have been made, Okay for CofO. |
|
10/08/2024 | COT - LCEL - Electrical Final | Passed | 9/30/24: pending Air Balance report and water sterilization report, UV coat all exterior piping on roof, egress label at doors required 10/8/24: all corrections have been made, Okay for CofO. |
|
10/08/2024 | COT - LCME - Mechanical Final | Passed | 9/30/24: pending Air Balance report and water sterilization report, UV coat all exterior piping on roof, egress label at doors required 10/8/24: all corrections have been made, Okay for CofO. |
|
10/08/2024 | COT - LCPL - Plumbing Final | Passed | 9/30/24: pending Air Balance report and water sterilization report, UV coat all exterior piping on roof, egress label at doors required 10/8/24: all corrections have been made, Okay for CofO. |