Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel13213125A
132130690
132131230
132131250
132131260
City of Tucson ZoningPAD-15
Tucson WardWard 5
Tucson Registered NeighborhoodSouth Park
Major Streets & Routes

Gateway Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Rezoning Cases

Date - 11/05/2024 2:35 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-06-32 The Bridges PAD - Kino Pkwy PAD Effectuated 11/28/2006

Permits

Address: 3456 S KINO PW
Date - 11/05/2024 2:35 p.m.
Total Number Of Permits - (9)
Permit Status Apply Date Expired Date Unit Type Description
TF-FCP-1222-00186 Complete 12/05/2022 N/A Fire Construction Permit New wet-pipe fire sprinkler system for Shell Bldg. Shop #8.
T21CM08080 Complete 10/12/2021 10/25/2023 Commercial Building New Retail Bldg 8 - 3 bldgs same set of plans separate apps being provided, plans being uploaded onc
TF-FCP-0824-00705 Complete 08/22/2024 03/10/2025 UNIT 112 Fire Construction Permit NFP TO MODIFY EXISTING FIRE SPRINKLER SYSTEM.
DP21-0213 Issued 08/17/2021 06/26/2027 Development Package *Revision #3 (plumbing) started 6/21/2024* Site/Grading/Swppp - The Bridges Sub-Area B-3, Lots 6,8, and 9.
T22FC00549 Complete 08/08/2022 03/29/2023 Fire Construction Permit Automatic Fire Extingshing Sys - Underground fire line for new building (Lot 8).; Commercial Fire Sprinkler Systems - Underground Fire Line Supply
TS-PRM-0724-00310 Issued 07/08/2024 01/04/2025 UNIT 112 Sign - Permanent Install 3 LED Illuminated Signs
T22CM04283 Needs Resubmittal 06/09/2022 N/A Commercial Building Provide a 100A 120/208V Panel for temporary job powetr
TC-COM-0524-00912 Complete 05/13/2024 04/07/2025 UNIT 112 Commercial Building TENANT IMPROVEMENT CONSISTING OF A BUILD-OUT OF EXISTING SHELL BUILDING LEASE SPACE AT B-3 TRIANGLE SHOPS (SHOPPING CENTER) WHICH INCLUDES NEW INTERIOR WALLS, NEW FLOORING AND WALL FINISHES AND NEW DRYWALL AND ACOUSTICAL CEILING, NEW LIGHT FIXTURES THROUGHOUT, NEW FIXTURES. (1) NEW ADA ACCESSIBLE TOILET ROOM, DRINKING FOUNTAINS AND MOP SINK. SEE ENGINEERING DRAWINGS FOR SCOPE OF MECHANICAL, PLUMBING AND ELECTRICAL WORK. THERE IS NO STRUCTURAL OR EXTERIOR WORK REQUIRED ON THIS PROJECT.
T22CM01564 Complete 03/03/2022 08/15/2023 Commercial Building Private Sewer for Lots 6/8/9

Plans

Address: 3456 S KINO PW
Date - 11/05/2024 2:35 p.m.
Total Number Of Plans - (1)
Plan Number Status Application Date Exp Date Unit Type Description
S22-048 FINAL 07/26/2022 08/24/2022 LOT SPLIT -- LSPT Land Split/Reconfiguration - Bridges Sub-Area B-3. Lots 6-b (3450 S. Kino Parkway), and 8-b (3456 S. Kino Parkway).

Record Requests

Address: 3456 S KINO PW
Date - 11/05/2024 2:35 p.m.
Total Number Of Requests - (5)
Request Number Status Request Date Completed Date Type Description
REQ-0123-00655 Complete 01/09/2023 01/20/2023 Requests Please extend, work is still underway
REQ-0523-02509 Denied 05/03/2023 N/A Requests The Project is not complete all related permits (DP21-0213) need to be in completed status and all conditions need to be satisfied we are missing the complete special inspection certificate. Please re-request once all associated projects are completed and the special inspection certificate is approved. - please issue LofC
REQ-0623-03049 Complete 06/01/2023 06/06/2023 Requests Please issue LofC, DP21-0213 is now closed out
REQ-0723-03912 Complete 07/18/2023 07/21/2023 Requests Requesting LofC Private Sewer for Lots 6/8/9
REQ-1024-06840 Complete 10/08/2024 10/10/2024 Requests TENANT IMPROVEMENT CONSISTING OF A BUILD-OUT OF EXISTING SHELL BUILDING LEASE SPACE AT B-3 TRIANGLE SHOPS (SHOPPING CENTER) WHICH INCLUDES NEW INTERIOR WALLS, NEW FLOORING AND WALL FINISHES AND NEW DRYWALL AND ACOUSTICAL CEILING, NEW LIGHT FIXTURES THROUGHOUT, NEW FIXTURES. (1) NEW ADA ACCESSIBLE TOILET ROOM, DRINKING FOUNTAINS AND MOP SINK. SEE ENGINEERING DRAWINGS FOR SCOPE OF MECHANICAL, PLUMBING AND ELECTRICAL WORK. THERE IS NO STRUCTURAL OR EXTERIOR WORK REQUIRED ON THIS PROJECT.