Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
05/03/2024
Applicant:
Aaron Bartholomew
Description:
PRIMARY CARE FOR SENIORS TENANT INFILL OF AN EXISTING SPACE IN RINCON PLAZA. INTERIOR BUILDOUT IS 10,548 SF. ATTACHED ADJACENT SPACES ON THE STRIP CENTER ARE NOT IN SCOPE. NEW MECHANICAL, ELECTRICAL, PLUMBING, AND STRUCTURAL REINFORCEMENT OF LEASED SPACE ONLY. Address: 9550 East Golf Links Road, Suite 100, Tucson, AZ 85730

Permit Reviews

Permit Number - TC-COM-0524-00787
Permit Status: Issued
Permit Description: PRIMARY CARE FOR SENIORS TENANT INFILL OF AN EXISTING SPACE IN RINCON PLAZA. INTERIOR BUILDOUT IS 10,548 SF. ATTACHED ADJACENT SPACES ON THE STRIP CENTER ARE NOT IN SCOPE. NEW MECHANICAL, ELECTRICAL, PLUMBING, AND STRUCTURAL REINFORCEMENT OF LEASED SPACE ONLY. Address: 9550 East Golf Links Road, Suite 100, Tucson, AZ 85730
Start Date Submittal Complete Date Status  
07/10/2024 COMMERCIAL REVIEW - FULL v.5 08/08/2024 REQUIRES RESUBMIT Review Details
06/13/2024 COMMERCIAL REVIEW - FULL v.2 06/13/2024 REQUIRES RESUBMIT Review Details
09/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 09/16/2024 APPROVED Review Details
07/05/2024 COMMERCIAL REVIEW - FULL v.4 07/05/2024 REQUIRES RESUBMIT Review Details
09/16/2024 RESTAMP - COMMERCIAL v.1 09/16/2024 APPROVED Review Details
02/04/2025 COMMERCIAL REVIEW - FULL REVISION v.1 02/04/2025 REQUIRES RESUBMIT Review Details
07/08/2025 RESTAMP - COMMERCIAL v.1 07/17/2025 APPROVED Review Details
06/18/2024 COMMERCIAL REVIEW - FULL v.3 06/27/2024 REQUIRES RESUBMIT Review Details
08/28/2024 RESTAMP - COMMERCIAL v.1 08/30/2024 APPROVED Review Details
02/07/2025 COMMERCIAL REVIEW - FULL REVISION v.2 02/09/2025 APPROVED Review Details
08/21/2024 COMMERCIAL REVIEW - FULL v.6 08/28/2024 APPROVED Review Details
03/20/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/24/2025 APPROVED Review Details
09/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/11/2024 REQUIRES RESUBMIT Review Details
03/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/01/2025 APPROVED Review Details
02/04/2025 COMMERCIAL REVIEW - FULL v.1 02/04/2025 REQUIRES RESUBMIT Review Details
05/08/2024 COMMERCIAL REVIEW - FULL v.1 06/07/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0524-00787
Permit Status: Issued
Permit Description: PRIMARY CARE FOR SENIORS TENANT INFILL OF AN EXISTING SPACE IN RINCON PLAZA. INTERIOR BUILDOUT IS 10,548 SF. ATTACHED ADJACENT SPACES ON THE STRIP CENTER ARE NOT IN SCOPE. NEW MECHANICAL, ELECTRICAL, PLUMBING, AND STRUCTURAL REINFORCEMENT OF LEASED SPACE ONLY. Address: 9550 East Golf Links Road, Suite 100, Tucson, AZ 85730
Date Description Comments
04/09/2025 If you are not sure of suite number or suite needs to be added to our system please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
06/24/2024 AIR BALANCING REPORT IS REQUIRED.
06/24/2024 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
05/08/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
09/13/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/13/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/24/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
06/24/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
09/10/2024 STATE HEALTH LICENSE REQUIRED - PLEASE PROVIDE DOCUMENTATION.
06/24/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0524-00787
Permite Description: PRIMARY CARE FOR SENIORS TENANT INFILL OF AN EXISTING SPACE IN RINCON PLAZA. INTERIOR BUILDOUT IS 10,548 SF. ATTACHED ADJACENT SPACES ON THE STRIP CENTER ARE NOT IN SCOPE. NEW MECHANICAL, ELECTRICAL, PLUMBING, AND STRUCTURAL REINFORCEMENT OF LEASED SPACE ONLY. Address: 9550 East Golf Links Road, Suite 100, Tucson, AZ 85730
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
11/12/2024 COT - HCEL - Electrical Intermediate N/A Partial Pass 11-12-24, above ceiling insulation on mechanical inspected and approved. Above ceiling electrical verified per approved plans. Okay to continue construction.
11/12/2024 COT - HCPL - Backwater Valve N/A Partial Pass 11-12-24, verified/approved. Okay to continue with construction.
03/12/2025 BULD - Electrical Clearance N/A Not Applicable
03/12/2025 COT - BULD - SWG Clearance N/A Not Applicable
03/13/2025 COT - HCBU - Masonry Pregrout N/A Not Applicable
03/21/2025 COT - HCME - Mechanical Final N/A Partial Pass 3-21-25, pending air balance report and fire approval.Contractor is apparently having problems uploading report into system. He was advised to contact the office for support and or physically take documents in hand to the office.
03/18/2025 COT - FCON - Fire - Final N/A Partial Pass Exit discharge lights. EM light in lobby restroom. Key for Knoxbox.
03/21/2025 COT - HCPL - Plumbing Final N/A Partial Pass 3-21-25, pending water sterilization report and fire approval.Contractor is apparently having problems uploading report into system. He was advised to contact the office for support and or physically take documents in hand to the office.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0524-00787
Permit Description: PRIMARY CARE FOR SENIORS TENANT INFILL OF AN EXISTING SPACE IN RINCON PLAZA. INTERIOR BUILDOUT IS 10,548 SF. ATTACHED ADJACENT SPACES ON THE STRIP CENTER ARE NOT IN SCOPE. NEW MECHANICAL, ELECTRICAL, PLUMBING, AND STRUCTURAL REINFORCEMENT OF LEASED SPACE ONLY. Address: 9550 East Golf Links Road, Suite 100, Tucson, AZ 85730
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/18/2024 COT - HCPL - Yard Water Line Passed
09/18/2024 COT - HCEL - Electrical Underground Passed 9/18/24: okay to cover unground electrical
09/26/2024 COT - HCBU - Preslab Passed
10/15/2024 COT - HCPL - Plumbing Intermediate Passed
10/25/2024 COT - HCME - Mechanical Intermediate Passed 10/25/24: Mechanical rough-in of above ceiling ductwork is complete, flex duct is installed at all register locations, and insulation is complete on circular ductwork.
10/25/2024 COT - HCEL - Grounding/Bonding Passed Building structure and water supply line is bonded in northwest corner of building, access panels will be installed at both top and bottom bonding areas.
10/25/2024 COT - HCPL - Plumbing Above Ceiling Passed Plumbing rough-in is complete in walls and above ceiling, hot supply lines are properly insulated throughout.
10/25/2024 COT - HCBU - Framing Passed 10/25/24: Metal stud framing complete throughout building. Plumbing, electrical, and mechanical rough-in complete. Okay to one side walls with drywall for installation of insulation battens.
02/21/2025 COT - HCEL - Electrical Intermediate Passed 2/21/25: Transformer is being set in interior electrical room, panels for lighting and receptacles are being trimmed out. New main panel and disconnects are installed. Okay to proceed with further work.
02/21/2025 COT - HCPL - Backwater Valve Passed
02/24/2025 COT - HCBU - Building Above Ceiling Passed
03/12/2025 COT - HCEL - Electrical Final Passed
03/12/2025 COT - HCME - Mechanical Above Ceiling Passed
03/12/2025 TRSP - ROW - Final/Close-Out Passed Work was completed on private property
03/12/2025 COT - HCEL - Electrical Above Ceiling Passed
03/20/2025 COT - FCON - Sprinkler - Final Passed
03/21/2025 ENGR Engineering Final Passed ADA parking and pedestrian access has been fixed to meet spec and plan.
03/27/2025 COT - HCME - Mechanical Final Passed 3-27-25, mechanical final approved.
03/27/2025 COT - FCON - Fire - Final Passed
04/02/2025 COT - HCBU - TCO Passed Level Four
04/02/2025 COT - HCPL - Plumbing Final Passed
04/09/2025 COT - HCBU - Building Final Passed 4-9-25, Building final approved.

Documents

File Name Document Type  
HARRISON HILLS - UNSTAMPED PLANS_V1.PDF DOCUMENTS VIEW
MATRIX PLUMBING ARCHWELL HARRISON HILLS 03-19-25 (002)-2025-03-26_V1.PDF DOCUMENTS VIEW
RELEASE-TC-COM-0524-00787_ARCHWELL HEALTH CLINIC HARRISON HILLS_63241118 - SIGNED_V1.PDF DOCUMENTS VIEW
ARCHWELL HEALTH CLINIC - HARRISON HILLS REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
ARCHWELL HARRISON HILLS - MEPT NARRATIVE OF CHANGES - REVISION 4 (1)_V1.PDF DOCUMENTS VIEW
HARRISON HILLS ELECTRICAL COMBINED SET_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
TC-COM-0524-00787_ARCHWELL HEALTH-HARRISON HILLS_SPECIAL INSPECTION_63241118 - SIGNED-2024-09-12_V1.PDF DOCUMENTS VIEW
CALCS 08.15.2024_V15.PDF DOCUMENTS VIEW
CONS-HARRISON HILLS - COMBINED PLANS 08.19.2024_V16.PDF DOCUMENTS VIEW