Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2025 | ENGR Engineering Final | Not Ready | Not Ready, All cross and running slopes are off in pathways and parking areas. Cross slope should not be more than 2% cross or running slope. Missing pathway at new ramp/rail are to parking areas. |
|
| 03/21/2025 | ENGR Engineering Final | Passed | ADA parking and pedestrian access has been fixed to meet spec and plan. |