Permit: TC-COM-0523-01312
Permit Details
Apply Date:
05/18/2023
Applicant:
Dave Hill
Description:
This project is a proposed fuel center. The fuel center will include a 43'x 126-4" prefabricated fuel canopy. A 174 SF kiosk, seven fuel despensers and two underground fuel tanks.
Permit Reviews
Permit Number - TC-COM-0523-01312
Permit Status: Complete
Permit Description: This project is a proposed fuel center. The fuel center will include a 43'x 126-4" prefabricated fuel canopy. A 174 SF kiosk, seven fuel despensers and two underground fuel tanks.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/25/2024 | APPROVED |
05/22/2023 | COMMERCIAL REVIEW - FULL v.1 | 06/27/2023 | REQUIRES RESUBMIT |
09/13/2023 | COMMERCIAL REVIEW - FULL v.2 | 10/09/2023 | REQUIRES RESUBMIT |
11/06/2023 | RESTAMP - COMMERCIAL v.1 | 11/07/2023 | APPROVED |
01/11/2024 | COMMERCIAL REVIEW - FULL v.1 | 02/08/2024 | APPROVED |
10/13/2023 | COMMERCIAL REVIEW - FULL v.3 | 11/06/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0523-01312
Permit Status: Complete
Permit Description: This project is a proposed fuel center. The fuel center will include a 43'x 126-4" prefabricated fuel canopy. A 174 SF kiosk, seven fuel despensers and two underground fuel tanks.
Date | Description | Comments |
---|---|---|
07/28/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
11/07/2023 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
10/24/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/17/2024 | Sewer Receipt/Wastewater Utility Fee | |
12/12/2023 | No Final and No Certificate of Occupancy until the private utility easement has been submitted, reviewed, approved and recorded, per the City of Tucson |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0523-01312
Permite Description: This project is a proposed fuel center. The fuel center will include a 43'x 126-4" prefabricated fuel canopy. A 174 SF kiosk, seven fuel despensers and two underground fuel tanks.
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/22/2024 | COT - HCME - Mechanical Intermediate | N/A | Not Applicable | |
05/31/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
COT - FCON - Fire - Final | N/A | Not Ready | Will reschedule for Final. | |
04/01/2024 | ENGR Engineering Final | N/A | Not Ready | This was not even close to being ready. Please recall after all is completed and ready to move in. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0523-01312
Permit Description: This project is a proposed fuel center. The fuel center will include a 43'x 126-4" prefabricated fuel canopy. A 174 SF kiosk, seven fuel despensers and two underground fuel tanks.
Total Completed Inspections - 26
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/08/2024 | COT - HCPL - Plumbing Progress | Passed | ||
03/08/2024 | COT - HCEL - Electrical Underground | Passed | 1/26/24: electrical underground for fuel dispenser and lighting per plan ok to back fill completed areas. Shading required. Pending point of connection to kiosk on north east of canopy. 1/31/24: electrical underground at tank section per plan ok to backfill. 2/6/24: underground electrical from Kiosk to transformer 70ft stretch ok to back fill. 2/8/24 from mid span of canopy on the north side to mid span of canopy of the east side 3 2.5" secondary lines ok to cover 2/12/24 ok to cover 3 conduits from main building to kiosk 2/15/24: stub-outs at kiosk complete ok to backfill. 2/21/24: stub-outs at kiosk complete ok to backfill. 2/27/24 primary and secondary's are complete ok to cover and underground electric to two light pole bases OK to cover 3/8/24: electrical underground complete. Grounding per plan. Passed |
|
03/22/2024 | COT - HCBU - Building Progress | Passed | ||
03/22/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
03/22/2024 | COT - HCEL - Electrical Progress | Passed | ||
03/22/2024 | COT - HCME - Mechanical Progress | Passed | ||
03/22/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
03/28/2024 | BULD - Electrical Clearance | Passed | ||
04/29/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
04/29/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
04/29/2024 | COT - HCME - Mechanical Final | Passed | ||
04/29/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
05/31/2024 | PDSD Heavy Commercial Building Division Pre-Construction Meeting | Passed | ||
05/31/2024 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
05/31/2024 | COT - HCBU - Framing | Passed | ||
05/31/2024 | COT - HCBU - Preslab | Passed | ||
05/31/2024 | COT - HCBU - Roof Nailing | Passed | ||
05/31/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
05/31/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
05/31/2024 | COT - HCPL - Plumbing Final | Passed | ||
05/31/2024 | COT - HCEL - Electrical Final | Passed | ||
06/07/2024 | COT - HCBU - Building Final | Passed | 5/31/24: ok for Level 4 TCO pending fire final, engineering final and ROW final. 6/7/24: ok for CofO |
|
06/07/2024 | COT - HCBU - CofO | Passed | 5/31/24: ok for Level 4 TCO pending fire final, engineering final and ROW final. 6/7/24: ok for CofO |
|
06/07/2024 | COT - FCON - Fire - Final | Passed | ||
06/10/2024 | ENGR Engineering Final | Passed | ||
06/10/2024 | TRSP - ROW - Final/Close-Out | Passed |