Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - TC-COM-0523-01312
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/21/2024 | ENGR Engineering Final | Not Ready | Walked site with Brandon Acosta, curb and gutter areas are completed thru out site and heading work continues we reviewed landscape plan and existing basin located on East side of site does require (6) trees and shrubs located at the base of basin. Brandon will contact COT to see if any other Landscape, grading, etc. inspections are required. Brandon will recall inspection when Landscape work begins in the next few weeks. |
|
04/01/2024 | ENGR Engineering Final | Not Ready | This was not even close to being ready. Please recall after all is completed and ready to move in. | |
04/17/2024 | ENGR Engineering Final | Canceled | This was a pre inspection for sprinkler lines so they could bury trenches, passed. | |
05/03/2024 | ENGR Engineering Final | Not Ready | A site visit today was performed to see what would be required prior to the authorization of the temporary certificate of occupancy. The contractor is currently working on installing the landscape materials are to be done by the end of next week, some minor sidewalk, that ties into Campbell, and installation at the long term and short term bicycle racks. A reinspection of the site will be required prior to authorization for a temporary certificate of occupancy level four. | |
05/31/2024 | ENGR Engineering Final | Partial Pass | OK for Level 4 TCO pending the APPROVAL by the Fire and Building Inspection Approvals and the removal of the Temporary Construction Fence. I have advised the Contractor WE O’Neil that the site permit DP21-0179 needs to be called in for all the Final Inspections, these will be Scheduled for Monday next week. | |
06/10/2024 | ENGR Engineering Final | Passed |