Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
05/16/2023
Applicant:
Mark Miller
Description:
This project consists of a 879 sq.ft. remodel in an existing medical building for the installation of a Biograph Horizon equipment

Permit Reviews

Permit Number - TC-COM-0523-01284
Permit Status: Complete
Permit Description: This project consists of a 879 sq.ft. remodel in an existing medical building for the installation of a Biograph Horizon equipment
Start Date Submittal Complete Date Status  
02/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/06/2024 APPROVED Review Details
01/24/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/24/2024 APPROVED Review Details
02/13/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/14/2024 APPROVED Review Details
06/08/2023 COMMERCIAL REVIEW - FULL v.2 07/17/2023 APPROVED Review Details
07/17/2023 RESTAMP - COMMERCIAL v.1 07/18/2023 APPROVED Review Details
03/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/25/2024 APPROVED Review Details
05/19/2023 COMMERCIAL REVIEW - FULL v.1 06/05/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0523-01284
Permit Status: Complete
Permit Description: This project consists of a 879 sq.ft. remodel in an existing medical building for the installation of a Biograph Horizon equipment
Date Description Comments
06/15/2023 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
06/15/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
07/27/2023 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
03/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/16/2023 SPECIAL INSPECTION FOR LEAD LINED WALL INSTALLED FOR RADIATION PROTECTION (NEW SCANNING EQUIPMENT) IS REQUIRED

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0523-01284
Permite Description: This project consists of a 879 sq.ft. remodel in an existing medical building for the installation of a Biograph Horizon equipment
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/28/2023 COT - HCBU - Building Above Ceiling N/A Partial Pass Partial pending framing at duct entry from ceiling. Looked at drywall 5/8 type X nailing pattern in scanner room #105. Okay for lead line at joints and screws. 12/1/2023

New mechanical unit pad on roof per detail 201. Okay to proceed progress areas. 12/7/2023

Not ready. 12/12/2023

12/28/22: plumbing passed, electrical passed, pending mechanical
12/28/2023 COT - HCME - Mechanical Above Ceiling N/A Not Ready Scanner room above ceiling okay for hard lid. 12/13/2023

Ceiling grids for pre scan #103, work #104, control room #106. 12/20/2023

12/28/23: not ready
COT - FCON - Fire - Final N/A Not Ready subs need to call in their permit for the fire sprinklers.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0523-01284
Permit Description: This project consists of a 879 sq.ft. remodel in an existing medical building for the installation of a Biograph Horizon equipment
Total Completed Inspections - 20
Date Description Inspector Results Comments
11/15/2023 COT - HCPL - Plumbing Intermediate Passed Plumbing rough-in is complete for new sink. Okay to shade and backfill trench.
11/30/2023 COT - HCBU - Building Progress Passed pre-slab..
11/30/2023 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
12/28/2023 COT - HCBU - Framing Passed
12/28/2023 COT - HCEL - Electrical Above Ceiling Passed
01/03/2024 COT - HCBU - Building Above Ceiling Passed
01/03/2024 COT - HCME - Mechanical Above Ceiling Passed
01/03/2024 COT - HCEL - Electrical Intermediate Passed
01/03/2024 COT - HCME - Mechanical Intermediate Passed
01/03/2024 COT - HCPL - Plumbing Above Ceiling Passed
01/18/2024 COT - HCEL - Electrical Final Passed
01/18/2024 BULD - Electrical Clearance Passed n.a
01/18/2024 COT - BULD - SWG Clearance Passed n.a
01/18/2024 ENGR Engineering Final Passed
01/18/2024 TRSP - ROW - Final/Close-Out Passed
02/06/2024 COT - FCON - Sprinkler - Final Passed
02/06/2024 COT - FCON - Fire - Final Passed
02/06/2024 COT - HCPL - Plumbing Final Passed
02/06/2024 COT - HCME - Mechanical Final Passed
02/06/2024 COT - HCBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
21013.01 - SPECIAL INSPECTION WAIVER MEMO-2024-03-19_V1.PDF DOCUMENTS VIEW
PIMA HEART RIVER ROAD LOWER PETCT SHIELDING VERIFICATION 2 10 24-2024-02-13_V1.PDF DOCUMENTS VIEW
FINAL REPORT 2402-003 ADVANTAGE AIR MECHNICAL-2024-02-05_V1.PDF DOCUMENTS VIEW
PIMA HEART - VASCULAR BIOGRAPH - REPORT_V1.PDF DOCUMENTS VIEW
PIMA HEART - VASCULAR BIOGRAPH FLOOR PLAN_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2_PLAN SET_V1.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCS_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW