Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
04/02/2026
Applicant:
Damion Corrales
Description:
Tenant improvement for a commercial IV nutrition business

Permit Reviews

Permit Number - TC-COM-0426-00470
Permit Status: Inspections
Permit Description: Tenant improvement for a commercial IV nutrition business
Start Date Submittal Complete Date Status  
05/04/2026 ADMINISTRATIVE v.1 05/05/2026 REQUIRES RESUBMIT Review Details
04/09/2026 COMMERCIAL REVIEW - LIMITED v.1 04/24/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0426-00470
Permit Status: Inspections
Permit Description: Tenant improvement for a commercial IV nutrition business
Total Outstanding Activity Conditions - 1
Date Name
04/22/2026 AIR BALANCING REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0426-00470
Permit Status: Inspections
Permit Description: Tenant improvement for a commercial IV nutrition business
Date Description Comments
04/08/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
04/09/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0426-00470
Permite Description: Tenant improvement for a commercial IV nutrition business
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
06/02/2026 COT - HCBU - Framing N/A Partial Pass 6-2-26: metal framing approved. Okay to continue with construction at progress areas.
06/09/2026 COT - HCEL - Electrical Above Ceiling N/A Partial Pass 6-9-26: label all junction boxes above ceiling, open knockout at j-boxes at entryway, add independent supports to rigid conduit at same location (cannot rest on grid).
06/09/2026 COT - HCPL - Plumbing Final N/A Not Ready 6-9-26; not ready for plumbing final-all fixtures must installed.
06/02/2026 COT - HCME - Mechanical Above Ceiling N/A Not Ready 6-2-26: not ready.
06/02/2026 COT - HCEL - Electrical Intermediate N/A Partial Pass 6-2-26: partial pass for electrical in wall rough in. Okay to continue with construction at progress areas.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0426-00470
Permit Description: Tenant improvement for a commercial IV nutrition business
Total Completed Inspections - 4
Date Description Inspector Results Comments
06/09/2026 COT - HCPL - Plumbing Intermediate Passed 6-9-26: plumbing intermediates approved.
06/09/2026 COT - HCPL - Plumbing Above Ceiling Passed 6-9-26: plumbing above ceiling approved.
06/10/2026 COT - HCME - Mechanical Intermediate Passed 6-10-26: mechanical intermediates approved.
06/10/2026 COT - HCME - Mechanical Above Ceiling Passed 6-10-26: approved.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW