Inspection Status: Not Ready
Inspection History: COT - HCPL - Plumbing Final
| Date |
Description |
Inspector |
Results |
Comments |
|
COT - HCPL - Plumbing Final |
|
Not Ready |
6-2-26: not ready for finals. |
| 06/09/2026 |
COT - HCPL - Plumbing Final |
|
Not Ready |
6-9-26; not ready for plumbing final-all fixtures must installed. |
| 07/24/2026 |
COT - HCPL - Plumbing Final |
|
Re-inspection required |
7-24-26: add copper pressure relief line at water heater and install between 2" -6" above drain pan, install plumbing fixture at room 107. |
| 07/30/2026 |
COT - HCPL - Plumbing Final |
|
Not Ready |
|
| 08/06/2026 |
COT - HCPL - Plumbing Final |
|
Passed |
|