Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
04/21/2025
Applicant:
Brian Liwski
Description:
SCOPE OF WORK INCLUDES AN ~1800 SF BUILD OUT IN AN EXISTING SHELL WAREHOUSE BUILDING. NO MODIFICATIONS PROPOSED TO EFFECT EXITING OR THE EXISTING BUILDING ENVELOPE. SCOPE OF WORK IS LIMITED TO NEW LIGHTING, HVAC AND RESTROOMS AS REQUIRED FOR BUILDING CODE AND OCCUPANCY OF SPACE. ASSOCIATED MECHANICAL, PLUMBING AND ELECTRICAL WORK INCLUDED WITH THIS CONSTRUCTION DOCUMENT SET.

Permit Reviews

Permit Number - TC-COM-0425-00796
Permit Status: Inspections
Permit Description: SCOPE OF WORK INCLUDES AN ~1800 SF BUILD OUT IN AN EXISTING SHELL WAREHOUSE BUILDING. NO MODIFICATIONS PROPOSED TO EFFECT EXITING OR THE EXISTING BUILDING ENVELOPE. SCOPE OF WORK IS LIMITED TO NEW LIGHTING, HVAC AND RESTROOMS AS REQUIRED FOR BUILDING CODE AND OCCUPANCY OF SPACE. ASSOCIATED MECHANICAL, PLUMBING AND ELECTRICAL WORK INCLUDED WITH THIS CONSTRUCTION DOCUMENT SET.
Start Date Submittal Complete Date Status  
06/16/2025 COMMERCIAL REVIEW - FULL v.3 06/25/2025 APPROVED Review Details
05/19/2025 COMMERCIAL REVIEW - FULL v.2 05/19/2025 REQUIRES RESUBMIT Review Details
07/01/2025 COMMERCIAL REVIEW - LIMITED v.1 07/16/2025 REQUIRES RESUBMIT Review Details
08/14/2025 RESTAMP - COMMERCIAL v.2 08/19/2025 APPROVED Review Details
07/16/2025 COMMERCIAL REVIEW - LIMITED v.2 07/16/2025 REQUIRES RESUBMIT Review Details
07/30/2025 COMMERCIAL REVIEW - LIMITED v.3 08/14/2025 APPROVED Review Details
04/23/2025 COMMERCIAL REVIEW - FULL v.1 05/16/2025 REQUIRES RESUBMIT Review Details
06/25/2025 RESTAMP - COMMERCIAL v.1 06/26/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0425-00796
Permit Status: Inspections
Permit Description: SCOPE OF WORK INCLUDES AN ~1800 SF BUILD OUT IN AN EXISTING SHELL WAREHOUSE BUILDING. NO MODIFICATIONS PROPOSED TO EFFECT EXITING OR THE EXISTING BUILDING ENVELOPE. SCOPE OF WORK IS LIMITED TO NEW LIGHTING, HVAC AND RESTROOMS AS REQUIRED FOR BUILDING CODE AND OCCUPANCY OF SPACE. ASSOCIATED MECHANICAL, PLUMBING AND ELECTRICAL WORK INCLUDED WITH THIS CONSTRUCTION DOCUMENT SET.
Total Outstanding Activity Conditions - 3
Date Name
11/07/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
11/07/2025 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
11/07/2025 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Conditions

Permit Number - TC-COM-0425-00796
Permit Status: Inspections
Permit Description: SCOPE OF WORK INCLUDES AN ~1800 SF BUILD OUT IN AN EXISTING SHELL WAREHOUSE BUILDING. NO MODIFICATIONS PROPOSED TO EFFECT EXITING OR THE EXISTING BUILDING ENVELOPE. SCOPE OF WORK IS LIMITED TO NEW LIGHTING, HVAC AND RESTROOMS AS REQUIRED FOR BUILDING CODE AND OCCUPANCY OF SPACE. ASSOCIATED MECHANICAL, PLUMBING AND ELECTRICAL WORK INCLUDED WITH THIS CONSTRUCTION DOCUMENT SET.
Date Description Comments
04/23/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
07/01/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/07/2025 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0425-00796
Permite Description: SCOPE OF WORK INCLUDES AN ~1800 SF BUILD OUT IN AN EXISTING SHELL WAREHOUSE BUILDING. NO MODIFICATIONS PROPOSED TO EFFECT EXITING OR THE EXISTING BUILDING ENVELOPE. SCOPE OF WORK IS LIMITED TO NEW LIGHTING, HVAC AND RESTROOMS AS REQUIRED FOR BUILDING CODE AND OCCUPANCY OF SPACE. ASSOCIATED MECHANICAL, PLUMBING AND ELECTRICAL WORK INCLUDED WITH THIS CONSTRUCTION DOCUMENT SET.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
08/26/2025 COT - HCPL - Plumbing Progress N/A Re-inspection required 8-26-25: called contractor at 932am and received no answer. Contractor nor plans wfor Building 2 not on site and I don't have access to them on my tablet. Left site after waiting 10 minutes. Reschedule inspections when ready.
10/30/2025 BULD - Electrical Clearance N/A Not Applicable
11/10/2025 COT - BULD - SWG Clearance N/A Not Applicable 11-10-25: not applicable.
COT - FCON - Sprinkler - Final N/A Not Ready TI inspection was for the oh pressure test only.
COT - FCON - Alarm - Final N/A Not Ready
COT - FCON - Fire - Final N/A Not Ready

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0425-00796
Permit Description: SCOPE OF WORK INCLUDES AN ~1800 SF BUILD OUT IN AN EXISTING SHELL WAREHOUSE BUILDING. NO MODIFICATIONS PROPOSED TO EFFECT EXITING OR THE EXISTING BUILDING ENVELOPE. SCOPE OF WORK IS LIMITED TO NEW LIGHTING, HVAC AND RESTROOMS AS REQUIRED FOR BUILDING CODE AND OCCUPANCY OF SPACE. ASSOCIATED MECHANICAL, PLUMBING AND ELECTRICAL WORK INCLUDED WITH THIS CONSTRUCTION DOCUMENT SET.
Total Completed Inspections - 16
Date Description Inspector Results Comments
09/25/2025 COT - HCPL - Plumbing Intermediate Passed 9-25-25: in wall domestic & DWV verified under test and per approved plans. Okay to continue construction at progress areas.
10/30/2025 COT - HCBU - Building Above Ceiling Passed
10/30/2025 COT - HCEL - Electrical Above Ceiling Passed
10/30/2025 COT - HCME - Mechanical Above Ceiling Passed
10/30/2025 COT - HCME - Mechanical Intermediate Passed
10/30/2025 COT - HCME - Mechanical Progress Passed
10/30/2025 COT - HCPL - Plumbing Above Ceiling Passed
11/10/2025 TRSP - ROW - Final/Close-Out Passed All work within the right of way has been completed
11/10/2025 COT - HCBU - Building Progress Passed 11-10-25: approved.
11/10/2025 COT - HCBU - Framing Passed 11-10-25: approved.
11/10/2025 COT - HCEL - Electrical Intermediate Passed 11-10-25: approved.
11/10/2025 COT - HCEL - Electrical Progress Passed 11-10-25: approved.
11/24/2025 COT - HCBU - Building Final Passed 11-24-25:Building final approved.
Note: See pending conditions.
11/24/2025 COT - HCEL - Electrical Final Passed 11-24-25: corrections made. Electrical final approved.
11/24/2025 COT - HCME - Mechanical Final Passed 11-24-25: Mechanical final approved.
11/24/2025 COT - HCPL - Plumbing Final Passed 11-24-25: corrections made. Plumbing final approved.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
25-100 I-10 SPEC- BLDG 2- DELTA 1- SEALED PLANS 06-09-25_V1.PDF DOCUMENTS VIEW
25100 I-10 INTERNATIONAL SPEC OFFICE BUILDING 2_CITY COMMENTS 20250716_V4.PDF DOCUMENTS VIEW
25-0341 (25-0341.1) I-10 SPEC- BLDG 2- DELTA 1- SEALED STRUCT'L CALCS 06-09-25_V2.PDF DOCUMENTS VIEW