Inspection Status: Re-inspection required
Inspection History: COT - HCBU - Framing
| Date |
Description |
Inspector |
Results |
Comments |
| 08/26/2025 |
COT - HCBU - Framing |
|
Re-inspection required |
8-26-25: called contractor at 932am and received no answer. Contractor nor plans wfor Building 2 not on site and I don't have access to them on my tablet. Left site after waiting 10 minutes. Reschedule inspections when ready. |
| 08/27/2025 |
COT - HCBU - Framing |
|
Re-inspection required |
8-27-25: Building 2 metal stud wall framing inspection-Add power driven pins on track at 12" o.c. , missing header & studs, missing clip angles at each stud. See S-001 details 1, 2 & 6 |
| 09/03/2025 |
COT - HCBU - Framing |
|
Partial Pass |
9-3-25: partial pass-Simpson MSUBH3.25's were used rather than clip angles at each stud-contractor will be submitting an RFI reflecting change. Okay to one side warehouse side at own risk pending RFI approval. Header to be inspected at later date. |
| 09/12/2025 |
COT - HCBU - Framing |
|
Partial Pass |
9/12/25: Drywall fastener per schedule at exterior side of south and east walls of office area. Partial pass for bathrooms framing in office area. Pending framing at warehouse restrooms. |
| 11/10/2025 |
COT - HCBU - Framing |
|
Passed |
11-10-25: approved. |