Permit: TC-COM-0425-00680
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
6744 S NOGALES HY
Address NEW:
6744 S NOGALES HY
Apply Date:
04/07/2025
Applicant:
ROBERT WOODRUFF
Description:
second floor residential, assessor designated improvement 2
Permit Reviews
Permit Number - TC-COM-0425-00680
Permit Status: Complete
Permit Description: second floor residential, assessor designated improvement 2
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/01/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/02/2026 | APPROVED |
| 07/29/2025 | COMMERCIAL REVIEW - LIMITED v.2 | 08/04/2025 | REQUIRES RESUBMIT |
| 10/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2025 | APPROVED |
| 08/04/2025 | COMMERCIAL REVIEW - LIMITED v.3 | 08/04/2025 | APPROVED |
| 08/04/2025 | RESTAMP - COMMERCIAL v.1 | 08/05/2025 | APPROVED |
| 04/11/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 04/28/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0425-00680
Permit Status: Complete
Permit Description: second floor residential, assessor designated improvement 2
| Date | Description | Comments |
|---|---|---|
| 04/11/2025 | Multiply Units associated with this address. | |
| 04/28/2025 | AIR BALANCING REPORT (OUTSIDE AIR ONLY) IS REQUIRED. | |
| 04/11/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 04/11/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 04/24/2025 | Stair Designs must be submitted and approved prior to final inspection |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00680
Permite Description: second floor residential, assessor designated improvement 2
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2025 | BULD - Electrical Clearance | N/A | Partial Pass | 10-2-25: okay to meter/energize panel. INCR clearance issued to TEP. Note: plans show gas bonding but site contains none. Have architect submit a letter documentation case. |
| 10/16/2025 | COT - LCME - Mechanical Final | N/A | Partial Pass | 10-16-25: missing flue at gas water heater and extend it past the rooftop (cannot be vented at soffit). Also, provide a door at the water heater enclosure. CORRECTION: no flue is required because it’s an electric water heater, however, install door to enclosure. |
| 01/06/2026 | COT - LCBU - Building Final | N/A | Partial Pass | 1-6-26: partial pass- adjust nosing on top riser to 1 1/4" maximum. |
| 10/08/2025 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | 10/8/25: INCR TEP CLEARANCE FOR CUT-OVER SCHEDULING APPROVED FOR RESIDENTIAL SERVICE FOR METER #177931681, sub-panel currently installed in closet (please relocate) grounding must be verified at metallic boxes and verify grommet at box |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0425-00680
Permit Description: second floor residential, assessor designated improvement 2
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/08/2025 | BULD - Electrical Clearance | Passed | 10/8/25: INCR TEP CLEARANCE FOR CUT-OVER SCHEDULING APPROVED FOR RESIDENTIAL SERVICE FOR METER #177931681, sub-panel currently installed in closet (please relocate) grounding must be verified at metallic boxes and verify grommet at box | |
| 01/06/2026 | COT - LCEL - Electrical Final | Passed | 1-6-26: electrical final approved. | |
| 01/06/2026 | COT - LCME - Mechanical Final | Passed | 1-6-26: mechanical final approved. | |
| 01/08/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 01/12/2026 | COT - FCON - Fire - Final | Passed | ||
| 01/12/2026 | COT - LCBU - Building Final | Passed | 1-12-26: building final approved. | |
| 01/27/2026 | COT - BULD - SWG Clearance | Passed | Finals have been approved per F.D. Closing out remaining inspection items. 1/27/2026 | |
| 01/27/2026 | COT - LCBU - Framing | Passed | Finals have been approved per F.D. Closing out remaining inspection items. 1/27/2026 | |
| 01/27/2026 | COT - LCBU - Preslab | Passed | Finals have been approved per F.D. Closing out remaining inspection items. 1/27/2026 | |
| 01/27/2026 | COT - LCBU - Excavation/Rebar/Zoning | Passed | Finals have been approved per F.D. Closing out remaining inspection items. 1/27/2026 | |
| 01/27/2026 | COT - LCEL - Grounding/Bonding | Passed | Finals have been approved per F.D. Closing out remaining inspection items. 1/27/2026 | |
| 01/27/2026 | COT - LCEL - Electrical Intermediate | Passed | Finals have been approved per F.D. Closing out remaining inspection items. 1/27/2026 | |
| 01/29/2026 | ENGR Engineering Final | Passed |