Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2025 | BULD - Electrical Clearance | Partial Pass | 10-2-25: okay to meter/energize panel. INCR clearance issued to TEP. Note: plans show gas bonding but site contains none. Have architect submit a letter documentation case. |
|
| 10/03/2025 | BULD - Electrical Clearance | Re-inspection required | 10-3-25: it was determined that a new set electrical plans are required the commercial site. Per NEC 230.2-2 meters are required at this location. One for the residential unit on the second level and the other for the commercial business located at the ground level. Follow-up with TEP and submit an application the second required meter. The clearance to connect service from inspection 10/2/25 has been delayed pending the RFI submittal to the city. | |
| 10/08/2025 | BULD - Electrical Clearance | Passed | 10/8/25: INCR TEP CLEARANCE FOR CUT-OVER SCHEDULING APPROVED FOR RESIDENTIAL SERVICE FOR METER #177931681, sub-panel currently installed in closet (please relocate) grounding must be verified at metallic boxes and verify grommet at box |