Permit: TC-COM-0424-00611
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
2094 N DRAGOON ST
Address NEW:
2094 N DRAGOON ST
Apply Date:
04/05/2024
Applicant:
Anthony Duplantis
Description:
Installation of 19.27 kwDC roof mounted photovoltaic system REV 1: New plans reflect a lineside tap in the external service disconnect. REV 2: Plans show the correct connector (Piercing tap) being used. REV3: Plans were revised to include a note that 'CHAIR LUGS' are to be installed on the line side of the PV AC disconnect.
Permit Reviews
Permit Number - TC-COM-0424-00611
Permit Status: Inspections complete
Permit Description: Installation of 19.27 kwDC roof mounted photovoltaic system
REV 1: New plans reflect a lineside tap in the external service disconnect.
REV 2: Plans show the correct connector (Piercing tap) being used.
REV3: Plans were revised to include a note that 'CHAIR LUGS' are to be installed on the line side of the PV AC disconnect.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/08/2024 | COMMERCIAL REVIEW - FULL v.1 | 05/07/2024 | REQUIRES RESUBMIT |
| 06/13/2024 | COMMERCIAL REVIEW - FULL v.2 | 06/21/2024 | APPROVED |
| 01/08/2025 | COMMERCIAL REVIEW - FULL REVISION v.2 | 01/24/2025 | APPROVED |
| 10/30/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/13/2024 | REQUIRES RESUBMIT |
| 01/29/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 02/23/2026 | APPROVED |
| 11/20/2024 | COMMERCIAL REVIEW - FULL v.2 | 12/03/2024 | APPROVED |
| 06/21/2024 | RESTAMP - COMMERCIAL v.1 | 06/21/2024 | APPROVED |
| 12/16/2024 | COMMERCIAL REVIEW - FULL REVISION v.1 | 12/31/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0424-00611
Permite Description: Installation of 19.27 kwDC roof mounted photovoltaic system
REV 1: New plans reflect a lineside tap in the external service disconnect.
REV 2: Plans show the correct connector (Piercing tap) being used.
REV3: Plans were revised to include a note that 'CHAIR LUGS' are to be installed on the line side of the PV AC disconnect.
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/25/2024 | ENGR Engineering Final | N/A | Not Applicable | NO Exterior work was completed |
| 12/10/2024 | COT - CSOL - Electrical Progress Solar Project | N/A | Not Applicable | |
| 12/10/2024 | COT - CSOL - Electrical Final Solar Project | N/A | Re-inspection required | Revised plans must submitted and approved to provide optional line-side tap connector used |
| 12/10/2024 | COT - CSOL - Grounding/Bonding Solar Project | N/A | Not Ready | |
| 12/10/2024 | COT - LCEL - Electrical Final | N/A | Re-inspection required | Revised plans must submitted and approved to provide optional line-side tap connector used |
| 12/10/2024 | COT - LCBU - Building Final | N/A | Re-inspection required | Revised plans must submitted and approved to provide optional line-side tap connector used |
| 12/10/2024 | BULD - Electrical Clearance | N/A | Not Ready |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0424-00611
Permit Description: Installation of 19.27 kwDC roof mounted photovoltaic system
REV 1: New plans reflect a lineside tap in the external service disconnect.
REV 2: Plans show the correct connector (Piercing tap) being used.
REV3: Plans were revised to include a note that 'CHAIR LUGS' are to be installed on the line side of the PV AC disconnect.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/25/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 01/31/2025 | COT - CSOL - Electrical Final Solar Project | Passed | ||
| 01/31/2025 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
| 04/06/2026 | COT - LCEL - Electrical Final | Passed | ||
| 04/06/2026 | COT - LCBU - Building Final | Passed | ||
| 04/06/2026 | BULD - Electrical Clearance | Passed | Verbal clearance to TEP DGL. (Line side tap) Final clearances for TEP DGC/DGL 4/6/2026 |