Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/31/2025 | BULD - Electrical Clearance | Passed | Approved with line-side tap - DGC/DGL Clearance to TEP is required for the solar meter | |
| 04/06/2026 | BULD - Electrical Clearance | Passed | Verbal clearance to TEP DGL. (Line side tap) Final clearances for TEP DGC/DGL 4/6/2026 |
|
| 10/25/2024 | BULD - Electrical Clearance | Not Ready | ||
| 12/10/2024 | BULD - Electrical Clearance | Not Ready |