Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0423-01051
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
7525 E SPEEDWAY BL
Address NEW:
7525 E SPEEDWAY BL
Apply Date:
04/13/2023
Applicant:
Arthur Schlegel
Description:
2nd Party - We will be adding a new two story high school with classrooms, multi purpose space, storage and offices to the existing campus
Permit Reviews
Permit Number - TC-COM-0423-01051
Permit Status: Complete
Permit Description: 2nd Party - We will be adding a new two story high school with classrooms, multi purpose space, storage and offices to the existing campus
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/28/2023 | COMMERCIAL REVIEW - FULL v.3 | 08/03/2023 | REQUIRES RESUBMIT |
| 11/27/2023 | COMMERCIAL REVIEW - FULL v.5 | 11/27/2023 | APPROVED |
| 11/27/2023 | RESTAMP - COMMERCIAL v.1 | 11/28/2023 | APPROVED |
| 04/20/2023 | COMMERCIAL REVIEW - FULL v.1 | 05/17/2023 | REQUIRES RESUBMIT |
| 08/07/2023 | COMMERCIAL REVIEW - FULL v.4 | 08/15/2023 | REQUIRES RESUBMIT |
| 05/05/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/06/2025 | REQUIRES RESUBMIT |
| 07/12/2023 | COMMERCIAL REVIEW - FULL v.2 | 07/21/2023 | REQUIRES RESUBMIT |
| 05/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 05/12/2025 | APPROVED |
| 04/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/29/2025 | REQUIRES RESUBMIT |
| 01/11/2024 | COMMERCIAL REVIEW - FULL v.1 | 01/23/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0423-01051
Permit Status: Complete
Permit Description: 2nd Party - We will be adding a new two story high school with classrooms, multi purpose space, storage and offices to the existing campus
| Date | Description | Comments |
|---|---|---|
| 08/14/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 04/28/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 08/14/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 08/14/2023 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 08/14/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 08/14/2023 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 08/14/2023 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 08/14/2023 | Masonry Inspection Report submittal review is required. | |
| 08/14/2023 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 07/28/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 08/14/2023 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-01051
Permite Description: 2nd Party - We will be adding a new two story high school with classrooms, multi purpose space, storage and offices to the existing campus
Total Outstanding Inspections - 13
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/17/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Pre-slab for stage ramp. |
| 11/18/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | Not Applicable--there is no gas to this building--not required. |
| 10/08/2024 | COT - HCPL - Plumbing Above Ceiling | N/A | Partial Pass | Building A. |
| 10/08/2024 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | Building A. |
| 11/26/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | Framing and Core board at stairwell B. |
| 04/04/2024 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | 5th Lift. |
| 12/19/2024 | COT - HCBU - Building Above Ceiling | N/A | Not Applicable | |
| 07/23/2024 | COT - HCEL - Electrical Progress | N/A | Not Ready | |
| 10/01/2024 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | Level One |
| 01/30/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 2-4" and 2-3" conduits on North side of building. |
| 01/27/2025 | COT - HCPL - Backwater Valve | N/A | Not Applicable | |
| 10/08/2024 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | Building A. |
| 05/02/2025 | COT - FCON - Alarm - Final | N/A | Partial Pass | A/V shutoff during alarm needs to be verified |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0423-01051
Permit Description: 2nd Party - We will be adding a new two story high school with classrooms, multi purpose space, storage and offices to the existing campus
Total Completed Inspections - 31
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/07/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 09/20/2024 | COT - HCPL - Plumbing Progress | Passed | ||
| 09/10/2024 | PDSD Heavy Commercial Building Division Pre-Construction Meeting | Passed | ||
| 09/11/2024 | COT - HCBU - Preslab | Passed | ||
| 09/12/2024 | COT - HCBU - Building Progress | Passed | ||
| 10/10/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 10/10/2024 | COT - HCBU - Roof Nailing | Passed | ||
| 10/31/2024 | COT - HCBU - Framing | Passed | ||
| 11/07/2024 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 12/03/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 12/03/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 12/19/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 12/19/2024 | COT - HCBU - Masonry Pregrout | Passed | ||
| 01/03/2025 | BULD - Electrical Clearance | Passed | SES is installed and wiring is torqued to the proper specifications. TEP ECO Clearance issued for this permit. | |
| 01/03/2025 | COT - HCEL - Electrical Progress | Passed | SES is installed and wiring is torqued to the proper specifications. TEP ECO Clearance issued for this permit. | |
| 01/07/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 01/27/2025 | COT - HCEL - Electrical Underground | Passed | ||
| 01/27/2025 | COT - HCEL - Outdoor Lighting | Passed | ||
| 02/03/2025 | COT - HCEL - Electrical Above Ceiling | Passed | Electrical is complete in Building A classrooms. Okay to install ceiling tiles throughout. | |
| 02/03/2025 | COT - HCME - Mechanical Above Ceiling | Passed | Mechanical ductwork, return and supply registers are installed in grid ceiling. Okay to proceed with grid ceiling tile installation. | |
| 02/27/2025 | COT - HCME - Mechanical Progress | Passed | ||
| 02/27/2025 | COT - HCME - Mechanical Intermediate | Passed | ||
| 03/24/2025 | COT - HCEL - Electrical Final | Passed | ||
| 04/01/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 04/02/2025 | COT - HCPL - Plumbing Final | Passed | ||
| 04/07/2025 | COT - HCME - Mechanical Final | Passed | ||
| 04/30/2025 | ENGR Engineering Final | Passed | ||
| 05/01/2025 | COT - HCBU - Building Final | Passed | ||
| 05/01/2025 | COT - HCBU - CofO | Passed | ||
| 05/20/2025 | COT - FCON - Fire - Final | Passed | ||
| 05/20/2025 | COT - FCON - Alarm - Final | Passed |