Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
04/06/2023
Applicant:
Erin Dick
Description:
Building 18 Maintenance (plan set under TC-COM-0323-00830)

Permit Reviews

Permit Number - TC-COM-0423-00974
Permit Status: Complete
Permit Description: Building 18 Maintenance (plan set under TC-COM-0323-00830)
Start Date Submittal Complete Date Status  
01/19/2024 COMMERCIAL REVIEW - FULL v.3 01/30/2024 APPROVED Review Details
10/09/2023 COMMERCIAL REVIEW - FULL v.1 11/02/2023 REQUIRES RESUBMIT Review Details
02/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/24/2025 REQUIRES RESUBMIT Review Details
12/12/2023 COMMERCIAL REVIEW - FULL v.2 12/18/2023 REQUIRES RESUBMIT Review Details
02/01/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/05/2024 APPROVED Review Details
03/12/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 03/14/2025 APPROVED Review Details
05/30/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/30/2025 APPROVED Review Details
05/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/22/2025 APPROVED Review Details
06/27/2023 COMMERCIAL REVIEW - FULL v.2 07/05/2023 APPROVED Review Details
04/18/2023 COMMERCIAL REVIEW - FULL v.1 05/12/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0423-00974
Permit Status: Complete
Permit Description: Building 18 Maintenance (plan set under TC-COM-0323-00830)
Date Description Comments
04/18/2023 Please contact Pima County Addressing to resolve your addressing issue related to FILL IN THIS SPACE. Addressing@pima.gov or 520-724-9512
05/22/2025 AIR BALANCING REPORT IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
05/30/2025 WATER STERILIZATION REPORT IS REQUIRED.
09/16/2024 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0423-00974
Permite Description: Building 18 Maintenance (plan set under TC-COM-0323-00830)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/25/2024 COT - HCBU - Exterior Clips/Sheathing N/A Re-inspection required Provide anchor bolts that are out of the center third of the bottom plates. Add anchor bolts at breaks. Missing throughout. 7/25/2024
10/03/2023 COT - HCBU - Building Progress N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0423-00974
Permit Description: Building 18 Maintenance (plan set under TC-COM-0323-00830)
Total Completed Inspections - 31
Date Description Inspector Results Comments
04/22/2024 COT - HCPL - Rough Soil Passed 4/22/24: Plumbing per plan ok to backfill. Shading required.
05/14/2024 COT - HCBU - Excavation/Rebar/Zoning Passed 5/8/24: not ready
5/14/24: Preslab at maintenance building passed.
05/14/2024 COT - HCBU - Preslab Passed 5/8/24: not ready
5/14/24: Preslab at maintenance building passed.
07/16/2024 COT - HCBU - Roof Nailing Passed
07/25/2024 COT - HCBU - Framing Passed
10/07/2024 COT - HCBU - Exterior Clips/Sheathing Passed
10/07/2024 COT - HCPL - Plumbing Progress Passed
10/07/2024 COT - HCEL - Grounding/Bonding Passed
10/07/2024 COT - HCEL - Electrical Progress Passed
10/07/2024 COT - BULD - SWG Clearance Passed
10/07/2024 COT - HCME - Mechanical Intermediate Passed
10/07/2024 COT - HCME - Mechanical Progress Passed
10/07/2024 COT - HCPL - Plumbing Above Ceiling Passed
10/07/2024 COT - HCPL - Plumbing Intermediate Passed
10/07/2024 COT - HCPL - Plumbing Roof Drains Passed
10/07/2024 COT - HCPL - Sewer Passed
10/07/2024 COT - HCBU - Building Progress Passed
10/08/2024 COT - HCEL - Electrical Intermediate Passed All corrections were made. 10/8/2024
10/08/2024 COT - HCEL - Electrical Above Ceiling Passed All corrections were made. 10/8/2024
10/08/2024 COT - HCBU - Building Above Ceiling Passed All corrections were made. 10/8/2024
10/29/2024 COT - HCBU - Interior Shear Bracing Passed
12/27/2024 BULD - Electrical Clearance Passed Passed 12/27/24 CLEARANCE ECO
05/15/2025 COT - FCON - Fire - Final Passed
05/15/2025 COT - FCON - Sprinkler - Final Passed
05/27/2025 COT - HCBU - Building Final Passed 5-27-25, all corrections made. Building final approved.
05/27/2025 COT - HCEL - Electrical Final Passed 5-27-25, all corrections made. Plumbing, electrical & mechanical final approved.
05/27/2025 COT - HCME - Mechanical Final Passed 5-27-25, all corrections made. Plumbing, electrical & mechanical final approved.
05/27/2025 COT - HCPL - Plumbing Final Passed 5-27-25, all corrections made. Plumbing & mechanical final approved.
06/03/2025 ENGR Engineering Final Passed CO Ready
06/03/2025 TRSP - ROW - Final/Close-Out Passed
06/03/2025 COT - HCBU - CofO Passed 6-3-25: all finals for Building 18 have been approved, and there are no pending conditions. Okay to issue C of O.