Permit: TC-COM-0326-00352
Permit Details
Status:
In Review
Type:
Commercial Building
Address:
9538 E OLD VAIL RD BLDG 2
Address NEW:
9538 E OLD VAIL RD BLDG 2
Apply Date:
03/11/2026
Applicant:
Andres Herrera
Description:
Remodel existing office to provide new restrooms
Permit Reviews
Permit Number - TC-COM-0326-00352
Permit Status: In review
Permit Description: Remodel existing office to provide new restrooms
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/16/2026 | COMMERCIAL REVIEW - FULL v.1 | 04/08/2026 | REQUIRES RESUBMIT |
| 08/13/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | N/A | IN REVIEW |
| 04/29/2026 | RESTAMP - COMMERCIAL v.1 | 05/14/2026 | APPROVED |
| 04/21/2026 | COMMERCIAL REVIEW - FULL v.2 | 04/29/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0326-00352
Permit Status: In review
Permit Description: Remodel existing office to provide new restrooms
| Date | Description | Comments |
|---|---|---|
| 03/16/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/16/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/14/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: In Review
Permit Number: TC-COM-0326-00352
Permite Description: Remodel existing office to provide new restrooms
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 07/07/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 08/11/2026 | COT - HCPL - Plumbing Final | N/A | Re-inspection required | 8-11-26: insulate hot copper line at water heater, provide supports for tankless water heater and label switch " water heater disconnect." Provide knee covers underneath all lavatories, provide distance clarification to center of water closet at men's restroom, install toilet paper/ napkin dispensers at each restroom together with restroom doors & ADA restroom signs, upload water sterilization report to the city for review. |
| 08/14/2026 | COT - HCBU - Building Final | N/A | Partial Pass | 8-14-26: pending engineer letter/load calcs/final panel schedules. Water sterilization report submitted to the city-pending approval. Air balance report to be submitted-okay to apply for a Level 4 TCO. |
| 08/14/2026 | COT - HCBU - CofO | N/A | Partial Pass | 8-14-26: pending engineer letter/load calcs/final panel schedules. Water sterilization report submitted to the city-pending approval. Air balance report to be submitted-okay to apply for a Level 4 TCO. |
| 08/11/2026 | COT - HCEL - Electrical Final | N/A | Re-inspection required | 8-11-26: have architect or engineer of record submit updated panels schedules & load calcs. on each panel that was used for new construction to the city for review/approval. |
Completed Inspections
Permit Status: In Review
Permit Number: TC-COM-0326-00352
Permit Description: Remodel existing office to provide new restrooms
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2026 | COT - HCBU - Building Above Ceiling | Passed | 7-1-26: intermediates at room's 103, 104, 105 approved. Okay to continue with TI at progress areas. | |
| 07/07/2026 | COT - HCBU - Framing | Passed | ||
| 08/05/2026 | COT - HCEL - Electrical Intermediate | Passed | ||
| 08/07/2026 | COT - FCON - Alarm - Final | Passed | ||
| 08/07/2026 | COT - HCPL - Plumbing Intermediate | Passed | 8-7-26: plumbing intermediate approved. | |
| 08/07/2026 | COT - HCME - Mechanical Above Ceiling | Passed | 8-7-26: mechanical above ceiling approved. | |
| 08/07/2026 | COT - HCPL - Plumbing Above Ceiling | Passed | 8-7-26: plumbing above ceiling approved. | |
| 08/07/2026 | COT - HCEL - Electrical Above Ceiling | Passed | 8-7-26: electrical above ceiling approved. | |
| 08/07/2026 | COT - HCME - Mechanical Final | Passed | 8-7-26: mechanical Building final approved. | |
| 08/10/2026 | TRSP - ROW - Final/Close-Out | Passed | phone call with Nathan, confirmed entirety of project was tenant improvements inside existing building with no impact or restoration to right of way easement | |
| 08/11/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 08/12/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 08/13/2026 | COT - FCON - Fire - Final | Passed | ||
| 08/13/2026 | COT - HCPL - Plumbing Final | Passed | 8-13-26: any pending ADA requirements will be noted at the building final. Plumbing final approved. Note: contractor has submitted a water sterilization report to the city for review & has a copy of report if needed. |