Permit: TC-COM-0326-00334
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
1665 S LA CHOLLA BL
Address NEW:
1665 S LA CHOLLA BL
Apply Date:
03/06/2026
Applicant:
Guy Shoaf
Description:
New splash pad to replace existing wading pool and restroom renovation. (LINKED TO CIP-0925-00022)
Permit Reviews
Permit Number - TC-COM-0326-00334
Permit Status: Issued
Permit Description: New splash pad to replace existing wading pool and restroom renovation. (LINKED TO CIP-0925-00022)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/12/2026 | RESTAMP - COMMERCIAL v.2 | 03/19/2026 | REQUIRES RESUBMIT |
| 03/24/2026 | RESTAMP - COMMERCIAL v.3 | 04/06/2026 | APPROVED |
| 03/09/2026 | RESTAMP - COMMERCIAL v.1 | 03/12/2026 | REQUIRES RESUBMIT |
| 11/02/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/03/2026 | APPROVED |
| 04/20/2026 | SPECIAL INSPECTION REVIEW v.1 | 04/24/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0326-00334
Permit Status: Issued
Permit Description: New splash pad to replace existing wading pool and restroom renovation. (LINKED TO CIP-0925-00022)
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/09/2026 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
| 03/09/2026 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
| 03/09/2026 |
Conditions
Permit Number - TC-COM-0326-00334
Permit Status: Issued
Permit Description: New splash pad to replace existing wading pool and restroom renovation. (LINKED TO CIP-0925-00022)
| Date | Description | Comments |
|---|---|---|
| 03/09/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0326-00334
Permite Description: New splash pad to replace existing wading pool and restroom renovation. (LINKED TO CIP-0925-00022)
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2026 | BULD - Electrical Clearance | N/A | Not Applicable | 9/25/26: not applicable. |
| 09/25/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | 9/25/26: not applicable |
| 09/01/2026 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | 9-1-26: verified grounding rods/disconnect per E3.0/Detail 3 at pool enclosure wall. Men's/Women's electrical above ceiling approved. Make sure to label junction boxes- we will verify at finals. Electrical underground conduit previously inspected-okay to continue with construction at progress areas. |
| 10/21/2026 | COT - LCPL - Plumbing Final | N/A | Partial Pass | 10/21/26: partial pass pending water sterilization report. |
| 10/19/2026 | COT - LCEL - Electrical Final | N/A | Partial Pass | Partial pass, corrections made, new splash pad panel not per approved plans, needs revision as on site electrician states wiring per plan would be unsafe and that pups listed for 20 amp breaker are actually low voltage |
| 09/25/2026 | COT - LCME - Mechanical Final | N/A | Partial Pass | 9/25/26: submit revision for single phase pump installed in mechanical room. |
| 10/23/2026 | ENGR Engineering Final | N/A | Partial Pass | Satisfy conditions. No TCO without Water Sterilization and PC Health |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0326-00334
Permit Description: New splash pad to replace existing wading pool and restroom renovation. (LINKED TO CIP-0925-00022)
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/29/2026 | COT - LCEL - Electrical Underground | Passed | 6.29.26 Rest of underground to new equipment enclosure South on existing pool. |
|
| 08/07/2026 | COT - LCPL - Rough Soil | Passed | ||
| 09/25/2026 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 9/25/26: previously inspected & approved. | |
| 09/25/2026 | COT - LCBU - Preslab | Passed | 9/25/26: previously inspected & approved. | |
| 10/02/2026 | COT - LCPL - Plumbing Intermediate | Passed | Passed | |
| 10/02/2026 | COT - LCPL - Plumbing Progress | Passed | Passed | |
| 10/21/2026 | COT - LCEL - Electrical Intermediate | Passed | 10/21/26: electrical intermediates approved. | |
| 10/21/2026 | COT - LCEL - Electrical Final | Passed | 10/21/26: electrical final approved. | |
| 10/22/2026 | COT - LCME - Mechanical Final | Passed | 10/22/26: mechanical final approved. | |
| 10/22/2026 | COT - FCON - Fire - Final | Passed |