Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2026 | ENGR Engineering Final | Not Ready | ||
| 10/23/2026 | ENGR Engineering Final | Partial Pass | Satisfy conditions. No TCO without Water Sterilization and PC Health |