Permit: TC-COM-0325-00489
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
4101 N CAMPBELL AV
Address NEW:
4101 N CAMPBELL AV
Apply Date:
03/12/2025
Applicant:
Austin Matson
Description:
INSTALLATION OF 105.6KWDC GROUND MOUNTED SOLAR PANEL SYSTEM ON SINGLE AXIS TRACKER
Permit Reviews
Permit Number - TC-COM-0325-00489
Permit Status: Inspections complete
Permit Description: INSTALLATION OF 105.6KWDC GROUND MOUNTED SOLAR PANEL SYSTEM ON SINGLE AXIS TRACKER
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/19/2025 | COMMERCIAL REVIEW - FULL v.2 | 06/06/2025 | APPROVED |
| 03/13/2025 | COMMERCIAL REVIEW - FULL v.1 | 04/07/2025 | REQUIRES RESUBMIT |
| 06/06/2025 | RESTAMP - COMMERCIAL v.1 | 06/06/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0325-00489
Permit Status: Inspections complete
Permit Description: INSTALLATION OF 105.6KWDC GROUND MOUNTED SOLAR PANEL SYSTEM ON SINGLE AXIS TRACKER
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 06/06/2025 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 06/06/2025 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. |
| 06/06/2025 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. |
Conditions
Permit Number - TC-COM-0325-00489
Permit Status: Inspections complete
Permit Description: INSTALLATION OF 105.6KWDC GROUND MOUNTED SOLAR PANEL SYSTEM ON SINGLE AXIS TRACKER
| Date | Description | Comments |
|---|---|---|
| 06/06/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 06/06/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0325-00489
Permit Description: INSTALLATION OF 105.6KWDC GROUND MOUNTED SOLAR PANEL SYSTEM ON SINGLE AXIS TRACKER
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2026 | COT - CSOL - Electrical Final Solar Project | Passed | 4.20.26 Approved |
|
| 04/20/2026 | COT - FCON - Fire - Final | Passed | ||
| 04/20/2026 | COT - LCBU - Building Final | Passed | ||
| 04/20/2026 | COT - LCEL - Electrical Final | Passed | ||
| 04/20/2026 | ENGR Engineering Final | Passed | Installation is complete in accordance with approved plans. | |
| 04/20/2026 | TRSP - ROW - Final/Close-Out | Passed | Checked and verified all work is done on private property no work done in the right way | |
| 04/20/2026 | COT - CSOL - Electrical Intermediate Solar Project | Passed | ||
| 04/20/2026 | COT - CSOL - Electrical Underground Solar Project | Passed | ||
| 04/20/2026 | COT - CSOL - Grounding/Bonding Solar Project | Passed | 4.20.26 Approved |
|
| 06/01/2026 | BULD - Electrical Clearance | Passed | 6/1/26: DGC CLEARANCE APPROVED FOR 4101 N CAMPBELL AV UNIT 2019 |