Inspection History Details
Inspection Status: Partial Pass
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2026 | BULD - Electrical Clearance | Partial Pass | 02/03/2026 Clearance TEP DGL at 12:50pm for line side tap to existing switchgear box with 150A fused disconnect. Partial pass pending solar final. |