Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address:
4407 S 6TH AV
Address NEW:
4407 S 6TH AV
Apply Date:
03/21/2024
Applicant:
Jimmy Sanders
Description:
Solar structure installation. The system size is 33.95kw. Includes the structure and a small amount on the roof. REV 1: Updated the inverter from “Solis S6-GC50K-US (480V)” to “Ginlong Solis S6-GC30K-LV-US (208V)”. Updated the modules from “Canadian Solar CS6W-530MB-AG (530W)” to “Greenwa/s Solar HS72-F-550-MN (550W)”. Added a juncAon box and an Acrel meter “Power Management System” for Voltage and current monitoring REV2 (delta L.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.

Permit Reviews

Permit Number - TC-COM-0324-00503
Permit Status: Inspections
Permit Description: Solar structure installation. The system size is 33.95kw. Includes the structure and a small amount on the roof. REV 1: Updated the inverter from “Solis S6-GC50K-US (480V)” to “Ginlong Solis S6-GC30K-LV-US (208V)”. Updated the modules from “Canadian Solar CS6W-530MB-AG (530W)” to “Greenwa/s Solar HS72-F-550-MN (550W)”. Added a juncAon box and an Acrel meter “Power Management System” for Voltage and current monitoring REV2 (delta L.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Start Date Submittal Complete Date Status  
03/31/2026 RESTAMP - COMMERCIAL v.1 N/A IN REVIEW Review Details
10/24/2024 COMMERCIAL REVIEW - FULL v.6 11/07/2024 REQUIRES RESUBMIT Review Details
04/16/2025 COMMERCIAL REVIEW - FULL v.7 04/16/2025 REQUIRES RESUBMIT Review Details
08/20/2024 COMMERCIAL REVIEW - FULL v.4 09/20/2024 REQUIRES RESUBMIT Review Details
03/19/2026 COMMERCIAL REVIEW - FULL REVISION v.1 03/25/2026 IN REVIEW Review Details
05/08/2025 COMMERCIAL REVIEW - FULL v.8 07/16/2025 IN REVIEW Review Details
07/24/2025 RESTAMP - COMMERCIAL v.1 08/08/2025 APPROVED Review Details
03/21/2024 COMMERCIAL REVIEW - FULL v.1 04/23/2024 REQUIRES RESUBMIT Review Details
07/17/2025 COMMERCIAL REVIEW - FULL v.9 07/24/2025 APPROVED Review Details
07/22/2024 COMMERCIAL REVIEW - FULL v.2 07/22/2024 REQUIRES RESUBMIT Review Details
08/08/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/12/2025 APPROVED Review Details
09/18/2025 COMMERCIAL REVIEW - FULL v.1 10/13/2025 APPROVED Review Details
10/16/2024 COMMERCIAL REVIEW - FULL v.5 10/17/2024 REQUIRES RESUBMIT Review Details
07/24/2024 COMMERCIAL REVIEW - FULL v.3 08/08/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0324-00503
Permit Status: Inspections
Permit Description: Solar structure installation. The system size is 33.95kw. Includes the structure and a small amount on the roof. REV 1: Updated the inverter from “Solis S6-GC50K-US (480V)” to “Ginlong Solis S6-GC30K-LV-US (208V)”. Updated the modules from “Canadian Solar CS6W-530MB-AG (530W)” to “Greenwa/s Solar HS72-F-550-MN (550W)”. Added a juncAon box and an Acrel meter “Power Management System” for Voltage and current monitoring REV2 (delta L.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Total Outstanding Activity Conditions - 3
Date Name
09/06/2024 SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED.
09/06/2024 SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED.
09/06/2024 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Conditions

Permit Number - TC-COM-0324-00503
Permit Status: Inspections
Permit Description: Solar structure installation. The system size is 33.95kw. Includes the structure and a small amount on the roof. REV 1: Updated the inverter from “Solis S6-GC50K-US (480V)” to “Ginlong Solis S6-GC30K-LV-US (208V)”. Updated the modules from “Canadian Solar CS6W-530MB-AG (530W)” to “Greenwa/s Solar HS72-F-550-MN (550W)”. Added a juncAon box and an Acrel meter “Power Management System” for Voltage and current monitoring REV2 (delta L.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Date Description Comments
09/06/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
09/06/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0324-00503
Permite Description: Solar structure installation. The system size is 33.95kw. Includes the structure and a small amount on the roof. REV 1: Updated the inverter from “Solis S6-GC50K-US (480V)” to “Ginlong Solis S6-GC30K-LV-US (208V)”. Updated the modules from “Canadian Solar CS6W-530MB-AG (530W)” to “Greenwa/s Solar HS72-F-550-MN (550W)”. Added a juncAon box and an Acrel meter “Power Management System” for Voltage and current monitoring REV2 (delta L.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/13/2026 COT - CSOL - Electrical Underground Solar Project N/A Not Applicable

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0324-00503
Permit Description: Solar structure installation. The system size is 33.95kw. Includes the structure and a small amount on the roof. REV 1: Updated the inverter from “Solis S6-GC50K-US (480V)” to “Ginlong Solis S6-GC30K-LV-US (208V)”. Updated the modules from “Canadian Solar CS6W-530MB-AG (530W)” to “Greenwa/s Solar HS72-F-550-MN (550W)”. Added a juncAon box and an Acrel meter “Power Management System” for Voltage and current monitoring REV2 (delta L.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Total Completed Inspections - 8
Date Description Inspector Results Comments
02/17/2026 TRSP - ROW - Final/Close-Out Passed
02/13/2026 COT - LCBU - Building Final Passed
02/13/2026 COT - LCEL - Electrical Final Passed
02/13/2026 ENGR Engineering Final Passed
02/13/2026 COT - CSOL - Electrical Progress Solar Project Passed
02/13/2026 COT - CSOL - Grounding/Bonding Solar Project Passed
03/26/2026 COT - CSOL - Electrical Final Solar Project Passed 03/26/2026
Approved clearance TEP DGC. Passed 2/13/26, required current approved plans to match listing DG meter panel.
03/26/2026 BULD - Electrical Clearance Passed 03/26/2026
Approved clearance TEP DGC. Passed 2/13/26, required current approved plans to match listing DG meter panel.

Documents

File Name Document Type  
SPAPP-35.75KW CAMACHO 2 - RESEALED 18MAR2026-COMPRESSED-2026-03-19_V1.PDF DOCUMENTS VIEW
_40KW_DELIVERABLE-DOCUMENTS_V28_DRAWING-SET_REVISION LETTER_CAMACHO 2 - 40KW - DRAFTING_L.0_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CAMACHO 2 - 34KW - STAMPED - RESEALED R5 - 17SEP2025_V1.PDF DOCUMENTS VIEW
CAMACHO OWNER SIGNED INITIAL SPIN-2025-08-08_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW