Permit: TC-COM-0324-00503
Permit Details
Apply Date:
03/21/2024
Applicant:
Jimmy Sanders
Description:
Solar structure installation. The system size is 33.95kw. Includes the structure and a small amount on the roof. REV 1: Updated the inverter from “Solis S6-GC50K-US (480V)” to “Ginlong Solis S6-GC30K-LV-US (208V)”. Updated the modules from “Canadian Solar CS6W-530MB-AG (530W)” to “Greenwa/s Solar HS72-F-550-MN (550W)”. Added a juncAon box and an Acrel meter “Power Management System” for Voltage and current monitoring REV2 (delta L.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Permit Reviews
Permit Number - TC-COM-0324-00503
Permit Status: Inspections
Permit Description: Solar structure installation. The system size is 33.95kw. Includes the structure and a small amount on the roof.
REV 1: Updated the inverter from “Solis S6-GC50K-US (480V)” to “Ginlong Solis S6-GC30K-LV-US (208V)”.
Updated the modules from “Canadian Solar CS6W-530MB-AG (530W)” to “Greenwa/s Solar HS72-F-550-MN (550W)”.
Added a juncAon box and an Acrel meter “Power Management System” for Voltage and current monitoring
REV2 (delta L.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/31/2026 | RESTAMP - COMMERCIAL v.1 | N/A | IN REVIEW |
| 10/24/2024 | COMMERCIAL REVIEW - FULL v.6 | 11/07/2024 | REQUIRES RESUBMIT |
| 04/16/2025 | COMMERCIAL REVIEW - FULL v.7 | 04/16/2025 | REQUIRES RESUBMIT |
| 08/20/2024 | COMMERCIAL REVIEW - FULL v.4 | 09/20/2024 | REQUIRES RESUBMIT |
| 03/19/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 03/25/2026 | IN REVIEW |
| 05/08/2025 | COMMERCIAL REVIEW - FULL v.8 | 07/16/2025 | IN REVIEW |
| 07/24/2025 | RESTAMP - COMMERCIAL v.1 | 08/08/2025 | APPROVED |
| 03/21/2024 | COMMERCIAL REVIEW - FULL v.1 | 04/23/2024 | REQUIRES RESUBMIT |
| 07/17/2025 | COMMERCIAL REVIEW - FULL v.9 | 07/24/2025 | APPROVED |
| 07/22/2024 | COMMERCIAL REVIEW - FULL v.2 | 07/22/2024 | REQUIRES RESUBMIT |
| 08/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/12/2025 | APPROVED |
| 09/18/2025 | COMMERCIAL REVIEW - FULL v.1 | 10/13/2025 | APPROVED |
| 10/16/2024 | COMMERCIAL REVIEW - FULL v.5 | 10/17/2024 | REQUIRES RESUBMIT |
| 07/24/2024 | COMMERCIAL REVIEW - FULL v.3 | 08/08/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0324-00503
Permit Status: Inspections
Permit Description: Solar structure installation. The system size is 33.95kw. Includes the structure and a small amount on the roof.
REV 1: Updated the inverter from “Solis S6-GC50K-US (480V)” to “Ginlong Solis S6-GC30K-LV-US (208V)”.
Updated the modules from “Canadian Solar CS6W-530MB-AG (530W)” to “Greenwa/s Solar HS72-F-550-MN (550W)”.
Added a juncAon box and an Acrel meter “Power Management System” for Voltage and current monitoring
REV2 (delta L.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 09/06/2024 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. |
| 09/06/2024 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. |
| 09/06/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0324-00503
Permit Status: Inspections
Permit Description: Solar structure installation. The system size is 33.95kw. Includes the structure and a small amount on the roof.
REV 1: Updated the inverter from “Solis S6-GC50K-US (480V)” to “Ginlong Solis S6-GC30K-LV-US (208V)”.
Updated the modules from “Canadian Solar CS6W-530MB-AG (530W)” to “Greenwa/s Solar HS72-F-550-MN (550W)”.
Added a juncAon box and an Acrel meter “Power Management System” for Voltage and current monitoring
REV2 (delta L.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
| Date | Description | Comments |
|---|---|---|
| 09/06/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 09/06/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0324-00503
Permite Description: Solar structure installation. The system size is 33.95kw. Includes the structure and a small amount on the roof.
REV 1: Updated the inverter from “Solis S6-GC50K-US (480V)” to “Ginlong Solis S6-GC30K-LV-US (208V)”.
Updated the modules from “Canadian Solar CS6W-530MB-AG (530W)” to “Greenwa/s Solar HS72-F-550-MN (550W)”.
Added a juncAon box and an Acrel meter “Power Management System” for Voltage and current monitoring
REV2 (delta L.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2026 | COT - CSOL - Electrical Underground Solar Project | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0324-00503
Permit Description: Solar structure installation. The system size is 33.95kw. Includes the structure and a small amount on the roof.
REV 1: Updated the inverter from “Solis S6-GC50K-US (480V)” to “Ginlong Solis S6-GC30K-LV-US (208V)”.
Updated the modules from “Canadian Solar CS6W-530MB-AG (530W)” to “Greenwa/s Solar HS72-F-550-MN (550W)”.
Added a juncAon box and an Acrel meter “Power Management System” for Voltage and current monitoring
REV2 (delta L.0): Added NG bond and extended neutral conductor per TEP requirements, Sheet E-601 only.
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/17/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 02/13/2026 | COT - LCBU - Building Final | Passed | ||
| 02/13/2026 | COT - LCEL - Electrical Final | Passed | ||
| 02/13/2026 | ENGR Engineering Final | Passed | ||
| 02/13/2026 | COT - CSOL - Electrical Progress Solar Project | Passed | ||
| 02/13/2026 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
| 03/26/2026 | COT - CSOL - Electrical Final Solar Project | Passed | 03/26/2026 Approved clearance TEP DGC. Passed 2/13/26, required current approved plans to match listing DG meter panel. |
|
| 03/26/2026 | BULD - Electrical Clearance | Passed | 03/26/2026 Approved clearance TEP DGC. Passed 2/13/26, required current approved plans to match listing DG meter panel. |