Permit: TC-COM-0323-00934
Permit Details
Apply Date:
03/31/2023
Applicant:
Tyrel Hullum
Description:
Second-story conversion of outdoor uncovered roof deck to indoor conditioned exercise room, study lounge demo. No change in number of dwelling units / parking, occupant load net reduction.
Permit Reviews
Permit Number - TC-COM-0323-00934
Permit Status: Issued
Permit Description: Second-story conversion of outdoor uncovered roof deck to indoor conditioned exercise room, study lounge demo. No change in number of dwelling units / parking, occupant load net reduction.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/15/2024 | APPROVED |
07/11/2023 | RESTAMP - COMMERCIAL v.1 | 07/14/2023 | APPROVED |
02/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/07/2024 | APPROVED |
05/11/2023 | COMMERCIAL REVIEW - FULL v.2 | 05/23/2023 | REQUIRES RESUBMIT |
06/14/2023 | COMMERCIAL REVIEW - FULL v.3 | 07/03/2023 | REQUIRES RESUBMIT |
09/11/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/11/2023 | REQUIRES RESUBMIT |
07/11/2023 | COMMERCIAL REVIEW - FULL v.4 | 07/11/2023 | APPROVED |
04/05/2023 | COMMERCIAL REVIEW - FULL v.1 | 05/04/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0323-00934
Permit Status: Issued
Permit Description: Second-story conversion of outdoor uncovered roof deck to indoor conditioned exercise room, study lounge demo. No change in number of dwelling units / parking, occupant load net reduction.
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
02/26/2024 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. |
02/26/2024 | Sauna & Cryo |
02/26/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
02/26/2024 | Tendons special care not to damage |
02/26/2024 | Tucson Fire INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION |
02/26/2024 | IBC: 2512.1.2 Weep screeds shall be installed at or below foundation plate line and minimum 2” above pavement and 4” above earth. Where porches, landings, garage aprons are located at same level as floor slab, provide concrete or CMU foundation curb or other approved means to achieve minimum 2 inch clearance between slab and stucco weep screed. |
05/04/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
Conditions
Permit Number - TC-COM-0323-00934
Permit Status: Issued
Permit Description: Second-story conversion of outdoor uncovered roof deck to indoor conditioned exercise room, study lounge demo. No change in number of dwelling units / parking, occupant load net reduction.
Date | Description | Comments |
---|---|---|
07/14/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
02/26/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
02/26/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/06/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
04/05/2023 | NESHAP Permit is required. (Utilized with commercial demolition permits) | |
02/26/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. | |
02/26/2024 | WATER STERILIZATION REPORT IS REQUIRED. | |
02/26/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0323-00934
Permite Description: Second-story conversion of outdoor uncovered roof deck to indoor conditioned exercise room, study lounge demo. No change in number of dwelling units / parking, occupant load net reduction.
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/29/2023 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | 9/29/23: plumbing for electric water filler per plan ok to proceed |
10/26/2023 | COT - LCEL - Grounding/Bonding | N/A | Not Applicable | |
09/29/2023 | COT - LCEL - Electrical Above Ceiling | N/A | Partial Pass | 9/29/23: electrical above ceiling in exercise area per plan ok to proceed. |
09/29/2023 | COT - LCME - Mechanical Intermediate | N/A | Partial Pass | 9/29/23: mechanical above ceiling in exercise area per plan ok to proceed. |
12/15/2023 | COT - HCBU - CofO | N/A | Not Ready | Need Building Final and Fire Finals before a C of O can be issued |
12/15/2023 | COT - LCBU - Building Final | N/A | Partial Pass | Need Fire finals,before building final can be approved. |
COT - FCON - Sprinkler - Final | N/A | Not Ready | Fire sprinkler coverage for the newly enclosed area needs to be evaluated by licensed contractor. | |
COT - FCON - Alarm - Final | N/A | Not Ready | Fire alarm coverage for the newly enclosed area needs to be evaluated by licensed contractor. | |
COT - FCON - Fire - Final | N/A | Not Ready | Fire sprinklers and Fire Alarm need to be evaluated and extended into newly enclosed area. The new space/gym not allowed to be used until life safety systems provide appropriate coverage. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0323-00934
Permit Description: Second-story conversion of outdoor uncovered roof deck to indoor conditioned exercise room, study lounge demo. No change in number of dwelling units / parking, occupant load net reduction.
Total Completed Inspections - 16
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
11/17/2023 | COT - LCEL - Electrical Above Ceiling | Passed | ||
11/17/2023 | COT - LCME - Mechanical Intermediate | Passed | ||
11/17/2023 | COT - LCBU - Framing | Passed | ||
11/17/2023 | COT - LCEL - Electrical Intermediate | Passed | ||
12/08/2023 | COT - LCME - Mechanical Final | Passed | ||
12/08/2023 | COT - LCPL - Plumbing Final | Passed | ||
12/15/2023 | COT - LCEL - Outdoor Lighting | Passed | ||
12/15/2023 | COT - LCEL - Electrical Final | Passed | ||
12/15/2023 | BULD - Electrical Clearance | Passed | No clearance required, Electric service is active. | |
12/15/2023 | COT - LCBU - Building Progress | Passed | ||
01/04/2024 | COT - HCBU - CofO | Passed | Ok to make application for Certificate of Occupancy. | |
01/04/2024 | COT - LCBU - Building Final | Passed | ||
01/09/2024 | COT - FCON - Sprinkler - Final | Passed | ||
02/15/2024 | COT - FCON - Alarm - Final | Passed | ||
02/15/2024 | COT - FCON - Fire - Final | Passed |