Permit: TC-COM-0323-00866
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2320 N SILVERBELL RD 150
Address NEW:
2320 N SILVERBELL RD 150
Apply Date:
03/22/2023
Applicant:
ATUL JAIN
Description:
Shell Modifications & Tenant Improvement
Permit Reviews
Permit Number - TC-COM-0323-00866
Permit Status: Complete
Permit Description: Shell Modifications & Tenant Improvement
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/05/2024 | APPROVED |
| 06/20/2023 | COMMERCIAL REVIEW - FULL v.3 | 07/05/2023 | APPROVED |
| 05/15/2023 | COMMERCIAL REVIEW - FULL v.2 | 05/30/2023 | REQUIRES RESUBMIT |
| 03/24/2023 | COMMERCIAL REVIEW - FULL v.1 | 04/20/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0323-00866
Permit Status: Complete
Permit Description: Shell Modifications & Tenant Improvement
| Date | Description | Comments |
|---|---|---|
| 01/24/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 07/05/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 07/31/2024 | Pima County Industrial Wastewater Review Required |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0323-00866
Permite Description: Shell Modifications & Tenant Improvement
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - FCON - Hood System - Final | N/A | Not Ready | ||
| 07/16/2024 | COT - LCBU - Building Final | N/A | Re-inspection required | 7/16/24: please upload Air balance report to portal for approval, ADA requirements not met at restrooms, evap cooler not properly installed missing 1/2" cold water supply and 3/4" drain, grease box and pipe missing at kitchen exhaust fan, make up air clearance from exhaust not met. sediment traps required at HVAC units, Properly insulate/Coat refrigerant lines on roof, receptacle missing at makeup air for pump, entry door must be replaced, drive-thru not complete. |
| 07/16/2024 | COT - LCEL - Electrical Final | N/A | Re-inspection required | 7/16/24: please upload Air balance report to portal for approval, ADA requirements not met at restrooms, evap cooler not properly installed missing 1/2" cold water supply and 3/4" drain, grease box and pipe missing at kitchen exhaust fan, make up air clearance from exhaust not met. sediment traps required at HVAC units, Properly insulate/Coat refrigerant lines on roof, receptacle missing at makeup air for pump, entry door must be replaced, drive-thru not complete. |
| 07/16/2024 | COT - LCME - Mechanical Final | N/A | Re-inspection required | 7/16/24: please upload Air balance report to portal for approval, ADA requirements not met at restrooms, evap cooler not properly installed missing 1/2" cold water supply and 3/4" drain, grease box and pipe missing at kitchen exhaust fan, make up air clearance from exhaust not met. sediment traps required at HVAC units, Properly insulate/Coat refrigerant lines on roof, receptacle missing at makeup air for pump, entry door must be replaced, drive-thru not complete. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0323-00866
Permit Description: Shell Modifications & Tenant Improvement
Total Completed Inspections - 15
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/19/2023 | COT - HCPL - Gas Pressure Test | Passed | ||
| 10/23/2023 | COT - LCPL - Plumbing Final | Passed | Ok to insulate and cover walls. | |
| 11/16/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP INCR. 11/16/2023 | |
| 11/16/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 12/12/2023 | COT - HCME - Kitchen Hood | Passed | Smoke test approved on two grease ducts. 12/12/2023 | |
| 12/12/2023 | COT - LCBU - Framing | Passed | Corrections were made 12/12/2023 | |
| 12/12/2023 | COT - LCEL - Electrical Intermediate | Passed | ||
| 03/15/2024 | COT - LCME - Mechanical Intermediate | Passed | ||
| 03/15/2024 | COT - LCBU - Building Progress | Passed | ||
| 04/16/2024 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. Suite #150 4/16/2024 | |
| 07/16/2024 | COT - FCON - Fire - Final | Passed | ||
| 07/16/2024 | COT - FCON - Hood System - Final | Passed | ||
| 07/30/2024 | COT - LCBU - Building Final | Passed | 7/16/24: please upload Air balance report to portal for approval, ADA requirements not met at restrooms, evap cooler not properly installed missing 1/2" cold water supply and 3/4" drain, grease box and pipe missing at kitchen exhaust fan, make up air clearance from exhaust not met. sediment traps required at HVAC units, Properly insulate/Coat refrigerant lines on roof, receptacle missing at makeup air for pump, entry door must be replaced, drive-thru not complete. 7/30/24: ok for CofO |
|
| 07/30/2024 | COT - LCEL - Electrical Final | Passed | ||
| 07/30/2024 | COT - LCME - Mechanical Final | Passed |