Permit: TC-COM-0323-00864
Permit Details
Apply Date:
03/22/2023
Applicant:
Brandy Burke
Description:
THE SCOPE OF WORK FOR THIS PROJECT INCLUDES REMOVAL OF SOME EXISTING INTERIOR WALLS, CEILINGS AND OPENINGS FOR NEW EXTERIOR WINDOWS IN THE EXISTING CONCRETE TILE-UP WALLS DEMOLITION TO INCLUDE REMOVAL OF ALL INDICATED WALLS, CEILINGS, FLOORING MATERIALS, LIGHTS, HVAC DUCTWORK, PLUMBING FIXTURES AND ATTACHED PIPES. NEW WORK TO INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW INTERIOR WINDOWS, DOORS AND DOOR HARDWARE AND NEW EXTERIOR WINDOWS (LOCATED IN EXISTING TILT UP CONCRETE WALLS). WORK ALSO INCLUDES THE REUSE OF EXISTING CEILING TILES, DOORS, DOOR HARDWARE, FLOOR CARPET TILES (REUSED AS MUCH AS POSSIBLE), REGISTERS, LIGHT FIXTURES, AND LIGHT SWITCHES.
Permit Reviews
Permit Number - TC-COM-0323-00864
Permit Status: Complete
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES REMOVAL OF SOME EXISTING INTERIOR WALLS, CEILINGS AND OPENINGS FOR NEW EXTERIOR WINDOWS IN THE EXISTING CONCRETE TILE-UP WALLS
DEMOLITION TO INCLUDE REMOVAL OF ALL INDICATED WALLS, CEILINGS, FLOORING MATERIALS, LIGHTS, HVAC DUCTWORK, PLUMBING FIXTURES AND ATTACHED PIPES.
NEW WORK TO INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK,
NEW INTERIOR WINDOWS, DOORS AND DOOR HARDWARE AND NEW EXTERIOR WINDOWS (LOCATED IN EXISTING TILT UP CONCRETE WALLS).
WORK ALSO INCLUDES THE REUSE OF EXISTING CEILING TILES, DOORS, DOOR HARDWARE, FLOOR CARPET TILES (REUSED AS MUCH AS POSSIBLE), REGISTERS, LIGHT FIXTURES, AND LIGHT SWITCHES.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/07/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 08/08/2023 | APPROVED |
| 11/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/16/2023 | APPROVED |
| 10/23/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/02/2023 | APPROVED |
| 03/24/2023 | COMMERCIAL REVIEW - FULL v.1 | 04/20/2023 | REQUIRES RESUBMIT |
| 05/06/2023 | COMMERCIAL REVIEW - FULL v.2 | 05/31/2023 | APPROVED |
| 08/01/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/01/2023 | REQUIRES RESUBMIT |
| 05/31/2023 | RESTAMP - COMMERCIAL v.1 | 06/01/2023 | APPROVED |
| 07/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/24/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0323-00864
Permit Status: Complete
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES REMOVAL OF SOME EXISTING INTERIOR WALLS, CEILINGS AND OPENINGS FOR NEW EXTERIOR WINDOWS IN THE EXISTING CONCRETE TILE-UP WALLS
DEMOLITION TO INCLUDE REMOVAL OF ALL INDICATED WALLS, CEILINGS, FLOORING MATERIALS, LIGHTS, HVAC DUCTWORK, PLUMBING FIXTURES AND ATTACHED PIPES.
NEW WORK TO INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK,
NEW INTERIOR WINDOWS, DOORS AND DOOR HARDWARE AND NEW EXTERIOR WINDOWS (LOCATED IN EXISTING TILT UP CONCRETE WALLS).
WORK ALSO INCLUDES THE REUSE OF EXISTING CEILING TILES, DOORS, DOOR HARDWARE, FLOOR CARPET TILES (REUSED AS MUCH AS POSSIBLE), REGISTERS, LIGHT FIXTURES, AND LIGHT SWITCHES.
| Date | Description | Comments |
|---|---|---|
| 05/31/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
| 05/31/2023 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. | |
| 05/31/2023 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 05/31/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/31/2023 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 05/31/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0323-00864
Permite Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES REMOVAL OF SOME EXISTING INTERIOR WALLS, CEILINGS AND OPENINGS FOR NEW EXTERIOR WINDOWS IN THE EXISTING CONCRETE TILE-UP WALLS
DEMOLITION TO INCLUDE REMOVAL OF ALL INDICATED WALLS, CEILINGS, FLOORING MATERIALS, LIGHTS, HVAC DUCTWORK, PLUMBING FIXTURES AND ATTACHED PIPES.
NEW WORK TO INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK,
NEW INTERIOR WINDOWS, DOORS AND DOOR HARDWARE AND NEW EXTERIOR WINDOWS (LOCATED IN EXISTING TILT UP CONCRETE WALLS).
WORK ALSO INCLUDES THE REUSE OF EXISTING CEILING TILES, DOORS, DOOR HARDWARE, FLOOR CARPET TILES (REUSED AS MUCH AS POSSIBLE), REGISTERS, LIGHT FIXTURES, AND LIGHT SWITCHES.
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - FCON - Alarm - Final | N/A | Not Ready | ||
| COT - FCON - Sprinkler - Final | N/A | Not Ready | ||
| COT - FCON - Fire - Final | N/A | Not Ready | ||
| 10/23/2023 | COT - HCEL - Electrical Final | N/A | Partial Pass | Most work completed; UPS/ATS reman to be inspected. |
| 05/08/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 05/08/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0323-00864
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES REMOVAL OF SOME EXISTING INTERIOR WALLS, CEILINGS AND OPENINGS FOR NEW EXTERIOR WINDOWS IN THE EXISTING CONCRETE TILE-UP WALLS
DEMOLITION TO INCLUDE REMOVAL OF ALL INDICATED WALLS, CEILINGS, FLOORING MATERIALS, LIGHTS, HVAC DUCTWORK, PLUMBING FIXTURES AND ATTACHED PIPES.
NEW WORK TO INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK,
NEW INTERIOR WINDOWS, DOORS AND DOOR HARDWARE AND NEW EXTERIOR WINDOWS (LOCATED IN EXISTING TILT UP CONCRETE WALLS).
WORK ALSO INCLUDES THE REUSE OF EXISTING CEILING TILES, DOORS, DOOR HARDWARE, FLOOR CARPET TILES (REUSED AS MUCH AS POSSIBLE), REGISTERS, LIGHT FIXTURES, AND LIGHT SWITCHES.
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2023 | COT - HCBU - Framing | Passed | ||
| 08/21/2023 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 09/12/2023 | COT - HCBU - Building Progress | Passed | Balance of framing. | |
| 09/22/2023 | COT - HCBU - Preslab | Passed | Concrete forms bare set, light pole base is in place, rebar reinforcement is in place. Okay to pour concrete for slab on grade. | |
| 09/22/2023 | COT - HCEL - Grounding/Bonding | Passed | Ground wire for new pole base is in place per plans and connected to rebar reinforcement. Okay to pour concrete for pole base. | |
| 09/22/2023 | COT - HCEL - Electrical Underground | Passed | Electrical underground for relocation of light pole is complete. Okay to backfill trench. | |
| 09/28/2023 | COT - HCME - Mechanical Intermediate | Passed | ||
| 09/28/2023 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 09/28/2023 | COT - HCEL - Electrical Intermediate | Passed | ||
| 10/23/2023 | COT - HCBU - Building Above Ceiling | Passed | ||
| 10/23/2023 | COT - HCME - Mechanical Final | Passed | ||
| 10/25/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
| 12/04/2023 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 12/04/2023 | COT - FCON - Alarm - Final | Passed | ||
| 12/04/2023 | COT - FCON - Sprinkler - Final | Passed | ||
| 12/04/2023 | ENGR Engineering Final | Passed | ||
| 12/14/2023 | COT - FCON - Fire - Final | Passed | ||
| 12/14/2023 | COT - HCEL - Electrical Final | Passed | ||
| 03/04/2024 | COT - HCPL - Gas Pressure Test | Passed | ||
| 05/08/2024 | COT - HCME - Venting | Passed | ||
| 05/08/2024 | COT - HCBU - Building Final | Passed | 12/18/23: Level 4 TCofO. 5/8/24: Ok for CofO. Backup generator is on separate permit. (TC-COM-1122-00050) |
|
| 05/08/2024 | COT - HCPL - Gas Final | Passed |