Permit Details

Status:
Complete
Type:
Commercial Building
Address:
3301 E GLOBAL LP
Address NEW:
3301 E GLOBAL LP
Apply Date:
03/22/2023
Applicant:
Brandy Burke
Description:
THE SCOPE OF WORK FOR THIS PROJECT INCLUDES REMOVAL OF SOME EXISTING INTERIOR WALLS, CEILINGS AND OPENINGS FOR NEW EXTERIOR WINDOWS IN THE EXISTING CONCRETE TILE-UP WALLS DEMOLITION TO INCLUDE REMOVAL OF ALL INDICATED WALLS, CEILINGS, FLOORING MATERIALS, LIGHTS, HVAC DUCTWORK, PLUMBING FIXTURES AND ATTACHED PIPES. NEW WORK TO INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW INTERIOR WINDOWS, DOORS AND DOOR HARDWARE AND NEW EXTERIOR WINDOWS (LOCATED IN EXISTING TILT UP CONCRETE WALLS). WORK ALSO INCLUDES THE REUSE OF EXISTING CEILING TILES, DOORS, DOOR HARDWARE, FLOOR CARPET TILES (REUSED AS MUCH AS POSSIBLE), REGISTERS, LIGHT FIXTURES, AND LIGHT SWITCHES.

Permit Reviews

Permit Number - TC-COM-0323-00864
Permit Status: Complete
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES REMOVAL OF SOME EXISTING INTERIOR WALLS, CEILINGS AND OPENINGS FOR NEW EXTERIOR WINDOWS IN THE EXISTING CONCRETE TILE-UP WALLS DEMOLITION TO INCLUDE REMOVAL OF ALL INDICATED WALLS, CEILINGS, FLOORING MATERIALS, LIGHTS, HVAC DUCTWORK, PLUMBING FIXTURES AND ATTACHED PIPES. NEW WORK TO INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW INTERIOR WINDOWS, DOORS AND DOOR HARDWARE AND NEW EXTERIOR WINDOWS (LOCATED IN EXISTING TILT UP CONCRETE WALLS). WORK ALSO INCLUDES THE REUSE OF EXISTING CEILING TILES, DOORS, DOOR HARDWARE, FLOOR CARPET TILES (REUSED AS MUCH AS POSSIBLE), REGISTERS, LIGHT FIXTURES, AND LIGHT SWITCHES.
Start Date Submittal Complete Date Status  
08/07/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.3 08/08/2023 APPROVED Review Details
11/16/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/16/2023 APPROVED Review Details
10/23/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/02/2023 APPROVED Review Details
03/24/2023 COMMERCIAL REVIEW - FULL v.1 04/20/2023 REQUIRES RESUBMIT Review Details
05/06/2023 COMMERCIAL REVIEW - FULL v.2 05/31/2023 APPROVED Review Details
08/01/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/01/2023 REQUIRES RESUBMIT Review Details
05/31/2023 RESTAMP - COMMERCIAL v.1 06/01/2023 APPROVED Review Details
07/21/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/24/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0323-00864
Permit Status: Complete
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES REMOVAL OF SOME EXISTING INTERIOR WALLS, CEILINGS AND OPENINGS FOR NEW EXTERIOR WINDOWS IN THE EXISTING CONCRETE TILE-UP WALLS DEMOLITION TO INCLUDE REMOVAL OF ALL INDICATED WALLS, CEILINGS, FLOORING MATERIALS, LIGHTS, HVAC DUCTWORK, PLUMBING FIXTURES AND ATTACHED PIPES. NEW WORK TO INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW INTERIOR WINDOWS, DOORS AND DOOR HARDWARE AND NEW EXTERIOR WINDOWS (LOCATED IN EXISTING TILT UP CONCRETE WALLS). WORK ALSO INCLUDES THE REUSE OF EXISTING CEILING TILES, DOORS, DOOR HARDWARE, FLOOR CARPET TILES (REUSED AS MUCH AS POSSIBLE), REGISTERS, LIGHT FIXTURES, AND LIGHT SWITCHES.
Date Description Comments
05/31/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
05/31/2023 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
05/31/2023 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
05/31/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/31/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
05/31/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0323-00864
Permite Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES REMOVAL OF SOME EXISTING INTERIOR WALLS, CEILINGS AND OPENINGS FOR NEW EXTERIOR WINDOWS IN THE EXISTING CONCRETE TILE-UP WALLS DEMOLITION TO INCLUDE REMOVAL OF ALL INDICATED WALLS, CEILINGS, FLOORING MATERIALS, LIGHTS, HVAC DUCTWORK, PLUMBING FIXTURES AND ATTACHED PIPES. NEW WORK TO INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW INTERIOR WINDOWS, DOORS AND DOOR HARDWARE AND NEW EXTERIOR WINDOWS (LOCATED IN EXISTING TILT UP CONCRETE WALLS). WORK ALSO INCLUDES THE REUSE OF EXISTING CEILING TILES, DOORS, DOOR HARDWARE, FLOOR CARPET TILES (REUSED AS MUCH AS POSSIBLE), REGISTERS, LIGHT FIXTURES, AND LIGHT SWITCHES.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
COT - FCON - Alarm - Final N/A Not Ready
COT - FCON - Sprinkler - Final N/A Not Ready
COT - FCON - Fire - Final N/A Not Ready
10/23/2023 COT - HCEL - Electrical Final N/A Partial Pass Most work completed; UPS/ATS reman to be inspected.
05/08/2024 BULD - Electrical Clearance N/A Not Applicable
05/08/2024 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0323-00864
Permit Description: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES REMOVAL OF SOME EXISTING INTERIOR WALLS, CEILINGS AND OPENINGS FOR NEW EXTERIOR WINDOWS IN THE EXISTING CONCRETE TILE-UP WALLS DEMOLITION TO INCLUDE REMOVAL OF ALL INDICATED WALLS, CEILINGS, FLOORING MATERIALS, LIGHTS, HVAC DUCTWORK, PLUMBING FIXTURES AND ATTACHED PIPES. NEW WORK TO INCLUDE NEW WALLS, CEILINGS, POWER, HVAC DUCTWORK, NEW INTERIOR WINDOWS, DOORS AND DOOR HARDWARE AND NEW EXTERIOR WINDOWS (LOCATED IN EXISTING TILT UP CONCRETE WALLS). WORK ALSO INCLUDES THE REUSE OF EXISTING CEILING TILES, DOORS, DOOR HARDWARE, FLOOR CARPET TILES (REUSED AS MUCH AS POSSIBLE), REGISTERS, LIGHT FIXTURES, AND LIGHT SWITCHES.
Total Completed Inspections - 22
Date Description Inspector Results Comments
08/21/2023 COT - HCBU - Framing Passed
08/21/2023 COT - HCME - Mechanical Above Ceiling Passed
09/12/2023 COT - HCBU - Building Progress Passed Balance of framing.
09/22/2023 COT - HCBU - Preslab Passed Concrete forms bare set, light pole base is in place, rebar reinforcement is in place. Okay to pour concrete for slab on grade.
09/22/2023 COT - HCEL - Grounding/Bonding Passed Ground wire for new pole base is in place per plans and connected to rebar reinforcement. Okay to pour concrete for pole base.
09/22/2023 COT - HCEL - Electrical Underground Passed Electrical underground for relocation of light pole is complete. Okay to backfill trench.
09/28/2023 COT - HCME - Mechanical Intermediate Passed
09/28/2023 COT - HCEL - Electrical Above Ceiling Passed
09/28/2023 COT - HCEL - Electrical Intermediate Passed
10/23/2023 COT - HCBU - Building Above Ceiling Passed
10/23/2023 COT - HCME - Mechanical Final Passed
10/25/2023 TRSP - ROW - Final/Close-Out Passed
12/04/2023 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
12/04/2023 COT - FCON - Alarm - Final Passed
12/04/2023 COT - FCON - Sprinkler - Final Passed
12/04/2023 ENGR Engineering Final Passed
12/14/2023 COT - FCON - Fire - Final Passed
12/14/2023 COT - HCEL - Electrical Final Passed
03/04/2024 COT - HCPL - Gas Pressure Test Passed
05/08/2024 COT - HCME - Venting Passed
05/08/2024 COT - HCBU - Building Final Passed 12/18/23: Level 4 TCofO.
5/8/24: Ok for CofO. Backup generator is on separate permit. (TC-COM-1122-00050)
05/08/2024 COT - HCPL - Gas Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
HFCU GLOBAL LOOP T.I. REPORT_V1.PDF DOCUMENTS VIEW
23-058M HUGHES FEDERAL CU, SP. IN. FINAL-2023-10-18_V1.PDF DOCUMENTS VIEW
HUGHES FEDERAL CREDIT UNION TI SPECIAL INSPECTION 7-28-23_V1.PDF DOCUMENTS VIEW
HUGHES FEDERAL SPL. INSP. INITIAL_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
HFCU COMMENT RESPONSES_V1.PDF DOCUMENTS VIEW
CONS-HFCU GLOBAL LOOP TI PLANS_V2_V1.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS_V2_V1.PDF DOCUMENTS VIEW
CONS-HFCU GLOBAL LOOP TI PLANS_V1.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW