Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0323-00864
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/17/2023 | Site Engineering | NOT REQUIRED | |||
| 04/20/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/12/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0323-00864 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Refer to Structural Drawing S1.0 and Structural Calculations page 1. The Seismic Parameters Ss, S1, Sds and Sd1 shown on these two documents do not match. Verify, make revisions as needed and resubmit. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved ED001 ELECTRICAL DEMOLITION PLAN - SOUTHEAST CORNER: Keynote 3 or symbol for floor box is wrong per symbol legend on E000. Could not locate Keynote 11, but one Keynote #12 is possibly misnumbered. ED002 ELECTRICAL DEMOLITION PLAN - SOUTHWEST CORNER: Keynote 3 or symbol for floor box is wrong per symbol legend on E000. ED004 DEMO LIGHTING PLAN - SOUTHWEST CORNER: Could not locate Keynote #5. E101 POWER PLAN - SOUTHEAST CORNER: Could not locate Keynote #7. E102 POWER PLAN - SOUTHWEST CORNER: Could not locate Keynote #13. E600 PANEL SCHEDULES: 400-amp Panels DPA and DPB are not in agreement with 200-amp panels shown on E400. Coordinate, either design is code compliant. PLUMBING REVIEW COMMENTS: Conditionally Approved First Plumbing Review: OK Subject To Field Inspections & Manufacture Specs If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
| 04/20/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: TC-COM-0323-00864 3301 E GLOBAL LP Zoning I-1 TRANSMITTAL DATE:‎April 20, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1.COMMENT: Zoning has reviewed the building plan for compliance with unapproved TD-DEV-0323-00186, Zoning cannot approve the building plans until the DP is approved. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
||
| 04/17/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 03/24/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |