Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
02/11/2026
Applicant:
Dan Buker
Description:
Occupancy change from I-3 to R-2. Project does not propose any alterations. This occupancy change is for Buildings 4. Building 5(TC-COM-0526-00732) and 6 (TC-COM-0526-00734) have plans under this permit.

Permit Reviews

Permit Number - TC-COM-0226-00202
Permit Status: Inspections
Permit Description: Occupancy change from I-3 to R-2. Project does not propose any alterations. This occupancy change is for Buildings 4. Building 5(TC-COM-0526-00732) and 6 (TC-COM-0526-00734) have plans under this permit.
Start Date Submittal Complete Date Status  
04/14/2026 COMMERCIAL REVIEW - FULL v.2 05/07/2026 REQUIRES RESUBMIT Review Details
05/08/2026 COMMERCIAL REVIEW - FULL v.3 06/02/2026 APPROVED Review Details
02/13/2026 COMMERCIAL REVIEW - FULL v.1 03/10/2026 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0226-00202
Permit Status: Inspections
Permit Description: Occupancy change from I-3 to R-2. Project does not propose any alterations. This occupancy change is for Buildings 4. Building 5(TC-COM-0526-00732) and 6 (TC-COM-0526-00734) have plans under this permit.
Date Description Comments
02/13/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/13/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0226-00202
Permite Description: Occupancy change from I-3 to R-2. Project does not propose any alterations. This occupancy change is for Buildings 4. Building 5(TC-COM-0526-00732) and 6 (TC-COM-0526-00734) have plans under this permit.
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
08/03/2026 BULD - Electrical Clearance N/A Not Applicable
08/03/2026 COT - BULD - SWG Clearance N/A Not Applicable
COT - FCON - Sprinkler - Final N/A Scheduled
08/07/2026 COT - LCEL - Electrical Final N/A Partial Pass 8/7/2026 Partial pass. 2nd floor unit 300,301,302,303,304,305, 306,307,308. 1st floor units 110,102 Ensure electrical panels at corridors are type 3r. Currently for indoor ratings.
08/07/2026 COT - LCBU - Building Final N/A Partial Pass 8/7/2026 Partial pass. Okay to apply for level 4 TCO. 2nd floor unit 300,301,302,303,304,305, 306,307,308. 1st floor units 110,102 Ensure electrical panels at corridors are type 3r. Currently for indoor ratings.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0226-00202
Permit Description: Occupancy change from I-3 to R-2. Project does not propose any alterations. This occupancy change is for Buildings 4. Building 5(TC-COM-0526-00732) and 6 (TC-COM-0526-00734) have plans under this permit.
Total Completed Inspections - 6
Date Description Inspector Results Comments
07/06/2026 COT - FCON - Fire - Final Passed
08/03/2026 COT - FCON - Alarm - Final Passed I already have completed this inspection.
07/31/2026 TRSP - ROW - Final/Close-Out Passed All work on private property no work in the right way
08/07/2026 COT - LCME - Mechanical Final Passed
08/07/2026 COT - LCPL - Plumbing Final Passed
08/07/2026 ENGR Engineering Final Passed Address accessible parking. Will prevent future approvals.

Scheduled Inspections

Scheduled Inspections - TC-COM-0226-00202
Status: Inspections
Description: Occupancy change from I-3 to R-2. Project does not propose any alterations. This occupancy change is for Buildings 4. Building 5(TC-COM-0526-00732) and 6 (TC-COM-0526-00734) have plans under this permit.
Scheduled Date Description Entered By Entered Date
08/03/2026 COT - FCON - Sprinkler - Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COFO_TEMPORARYCOFO (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW