Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Deferred

Inspection History: COT - LCBU - Building Final 

Date Description Inspector Results Comments
07/06/2026 COT - LCBU - Building Final  Deferred 7/6/2026: OKAY TO APPLY FOR LEVEL 4 TCO FOR BUILDING#4 ROOMS 104 & 108
07/14/2026 COT - LCBU - Building Final  Partial Pass 7.14.26: OKAY TO APPLY FOR LEVEL 4 TCO FOR ROOM 106
08/03/2026 COT - LCBU - Building Final  Not Ready Provide 15” address numbers on building.
101 missing condenser unit, receptacle near unit has hot/neutral reversed. Coat hanger shall be at 48”. Mirror shall be at 40” to the reflective side. Ensure all flush valves are on the open side at all ADA bathrooms. Unit 100 missing receptacle near door entry. Lav greater than 34” coat hanger shall be at 48”. Mirror shall be at 40” Receptacle near kitchen counter shall be GFCI protected. Remove pan head screws from sub panel covers. Unit 102 provide knee guards at lav. Coat hanger shall be 48”, mirror 40” flooring incomplete. missing receptacle at door entry. Provide GFCI protection at receptacle near kitchen counter. Stopped inspections. Building 4. 8/3/2026
08/07/2026 COT - LCBU - Building Final  Partial Pass 8/7/2026 Partial pass. Okay to apply for level 4 TCO. 2nd floor unit 300,301,302,303,304,305, 306,307,308. 1st floor units 110,102 Ensure electrical panels at corridors are type 3r. Currently for indoor ratings.