Permit: TC-COM-0226-00155
Permit Details
Apply Date:
02/03/2026
Applicant:
Andrew Venne
Description:
Interior Remodel
Permit Reviews
Permit Number - TC-COM-0226-00155
Permit Status: Issued
Permit Description: Interior Remodel
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/16/2026 | COMMERCIAL REVIEW - FULL v.2 | 04/09/2026 | APPROVED |
| 07/09/2026 | COMMERCIAL REVIEW - FULL REVISION v.1 | 08/03/2026 | APPROVED |
| 02/06/2026 | COMMERCIAL REVIEW - FULL v.1 | 03/09/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0226-00155
Permit Status: Issued
Permit Description: Interior Remodel
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 03/03/2026 | AIR BALANCING REPORT IS REQUIRED. |
| 03/03/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
| 04/06/2026 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
Conditions
Permit Number - TC-COM-0226-00155
Permit Status: Issued
Permit Description: Interior Remodel
| Date | Description | Comments |
|---|---|---|
| 02/06/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/03/2026 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. | |
| 02/06/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0226-00155
Permite Description: Interior Remodel
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2026 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | 7-31-26: partial pass for in wall electrical. Okay to continue with construction at progress areas. |
| 08/11/2026 | COT - LCME - Mechanical Intermediate | N/A | Partial Pass | Above ceiling good to go. |
| 08/26/2026 | COT - LCPL - Plumbing Intermediate | N/A | Partial Pass | 8-26-26: DWV/domestic under test. DWV installed per plans & is properly supported throughout. Okay to continue with construction at progress areas. |
| 09/09/2026 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 09/09/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 08/25/2026 | COT - LCPL - Rough Soil | N/A | Partial Pass | Partial pass. Grease interceptor approved. 8/25/2026 |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0226-00155
Permit Description: Interior Remodel
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2026 | COT - LCPL - Gas Pressure Test | Passed | 8-26-26: gas pressure test approved. | |
| 08/26/2026 | COT - LCBU - Framing | Passed | 8-26-26: framing approved. Okay to continue with construction at progress areas. | |
| 09/09/2026 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 09/09/2026 | COT - LCBU - Preslab | Passed | ||
| 09/09/2026 | COT - LCPL - Rough Soil | Passed | ||
| 09/09/2026 | COT - LCPL - Sewer | Passed |