Permit: TC-COM-0226-00146
Permit Details
Status:
Needs Resubmittal
Type:
Commercial Building
Address:
4214 N 1ST AV
Address NEW:
4214 N 1ST AV
Apply Date:
02/01/2026
Applicant:
Lisa Bowers
Description:
NEW CONSTRUCTION OF THE "SCOOTER'S COFFEE" CHAIN.
Permit Reviews
Permit Number - TC-COM-0226-00146
Permit Status: Needs resubmittal
Permit Description: NEW CONSTRUCTION OF THE "SCOOTER'S COFFEE" CHAIN.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/03/2026 | COMMERCIAL REVIEW - FULL v.1 | 03/02/2026 | REQUIRES RESUBMIT |
| 09/21/2026 | COMMERCIAL REVIEW - FULL v.2 | N/A | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0226-00146
Permit Status: Needs resubmittal
Permit Description: NEW CONSTRUCTION OF THE "SCOOTER'S COFFEE" CHAIN.
Total Outstanding Activity Conditions - 12
| Date | Name |
|---|---|
| 02/03/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
| 02/03/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 02/25/2026 | AIR BALANCING REPORT IS REQUIRED. |
| 02/25/2026 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. |
| 02/25/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
| 02/27/2026 | Please submit a separate sign permit for an signs associated with this projet. |
| 03/02/2026 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. |
| 03/02/2026 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 03/02/2026 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 03/02/2026 | SPECIAL INSPECTION OF FABRICATORS IS REQUIRED. (SUBMIT FABRICATOR'S CERTIFICATE OF COMPLIANCE OR SPECIAL INSPECTION REPORT TO RESOLVE) |
| 03/02/2026 | Separate submittal to PC Industrial Wastewater Control is required for new interceptors and separators. Contact Kelsey.McMonagle@pima.gov or Adam.DeLaTorre@pima.gov for review and assessment of the proposed grease interceptor. |
| 03/02/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |