Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
02/25/2025
Applicant:
CHARLES ELMER
Description:
remodel 2 bathrooms and relocate one of those bathrooms

Permit Reviews

Permit Number - TC-COM-0225-00379
Permit Status: Complete
Permit Description: remodel 2 bathrooms and relocate one of those bathrooms
Start Date Submittal Complete Date Status  
05/27/2025 RESTAMP - COMMERCIAL v.1 05/28/2025 APPROVED Review Details
04/23/2025 COMMERCIAL REVIEW - FULL v.2 05/13/2025 REQUIRES RESUBMIT Review Details
05/16/2025 COMMERCIAL REVIEW - FULL v.3 05/27/2025 APPROVED Review Details
02/27/2025 COMMERCIAL REVIEW - FULL v.1 03/28/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0225-00379
Permit Status: Complete
Permit Description: remodel 2 bathrooms and relocate one of those bathrooms
Total Outstanding Activity Conditions - 2
Date Name
05/13/2025 AIR BALANCING REPORT IS REQUIRED.
05/13/2025 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0225-00379
Permit Status: Complete
Permit Description: remodel 2 bathrooms and relocate one of those bathrooms
Date Description Comments
02/27/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/27/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0225-00379
Permite Description: remodel 2 bathrooms and relocate one of those bathrooms
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
08/08/2025 COT - BULD - SWG Clearance N/A Not Applicable
08/08/2025 COT - FCON - Fire - Final N/A Not Applicable
08/08/2025 COT - LCEL - Electrical Above Ceiling N/A Not Applicable
08/08/2025 COT - LCME - Mechanical Intermediate N/A Not Applicable
08/11/2025 COT - HCBU - Framing N/A Re-inspection required 8-11-25: add shot pin to marked location and install blocking/backing for grab bars.
08/11/2025 COT - HCBU - Interior Shear Bracing N/A Not Ready 8-11-25: not ready.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0225-00379
Permit Description: remodel 2 bathrooms and relocate one of those bathrooms
Total Completed Inspections - 13
Date Description Inspector Results Comments
07/10/2025 COT - LCPL - Rough Soil Passed
07/10/2025 COT - LCPL - Sewer Passed
08/08/2025 COT - LCPL - Gas Pressure Test Passed
08/08/2025 COT - LCEL - Electrical Intermediate Passed
08/08/2025 TRSP - ROW - Final/Close-Out Passed
08/08/2025 ENGR Engineering Final Passed Site is clean and clear, no issues with safe access.
08/11/2025 COT - LCPL - Plumbing Intermediate Passed 8-11-25: plumbing intermediate approved.
08/15/2025 COT - HCBU - Framing Passed Ok to insulate and sheet rock throughout
08/15/2025 COT - HCBU - Interior Shear Bracing Passed Ok to insulate and sheet rock throughout.
10/16/2025 COT - LCPL - Plumbing Final Passed
10/16/2025 COT - LCBU - Building Final Passed
10/16/2025 COT - LCME - Mechanical Final Passed
10/16/2025 COT - LCEL - Electrical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-3_PLAN_SET_V3.PDF DOCUMENTS VIEW