Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
3480 E BRITANNIA DR
Apply Date:
02/12/2025
Applicant:
Janice Lohman
Description:
Interior Renovation of existing space for new office and assembly space. No exterior work or changes to exterior.

Permit Reviews

Permit Number - TC-COM-0225-00299
Permit Status: Complete
Permit Description: Interior Renovation of existing space for new office and assembly space. No exterior work or changes to exterior.
Start Date Submittal Complete Date Status  
02/13/2025 COMMERCIAL REVIEW - FULL v.1 03/17/2025 REQUIRES RESUBMIT Review Details
04/15/2025 COMMERCIAL REVIEW - FULL v.3 04/18/2025 APPROVED Review Details
03/18/2025 COMMERCIAL REVIEW - FULL v.2 04/07/2025 REQUIRES RESUBMIT Review Details
04/06/2026 COMMERCIAL REVIEW - FULL REVISION v.1 04/28/2026 APPROVED Review Details
04/18/2025 RESTAMP - COMMERCIAL v.1 04/22/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0225-00299
Permit Status: Complete
Permit Description: Interior Renovation of existing space for new office and assembly space. No exterior work or changes to exterior.
Date Description Comments
02/28/2025 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
02/28/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/13/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/28/2025 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
02/28/2025 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
02/28/2025 SPECIAL INSPECTION FOR INSULATING CONCRETE FILL IS REQUIRED.
02/28/2025 ??? Designs must be submitted and approved prior to ...
02/13/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0225-00299
Permite Description: Interior Renovation of existing space for new office and assembly space. No exterior work or changes to exterior.
Total Outstanding Inspections - 16
Last Inspection Date Description Inspector Results Comments
05/02/2025 COT - HCBU - Interior Shear Bracing N/A Partial Pass 4/29/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side.
5/2/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side.
04/06/2026 BULD - Electrical Clearance N/A Not Applicable
04/06/2026 COT - BULD - SWG Clearance N/A Not Applicable
05/02/2025 COT - HCBU - Preslab N/A Partial Pass 5/2/25: Pour back at bathroom area per approved plans ok for concrete placement.
04/06/2026 COT - HCBU - TCO N/A Partial Pass 4/6/26: OKAY FOR LEVEL 1 TCO (Stocking/Furniture) Only
COT - FCON - Sprinkler - Final N/A Not Ready
04/17/2026 COT - FCON - Fire - Final N/A Partial Pass Ceiling shall be intact, exit signs shall be repaired.
04/16/2026 COT - HCBU - Building Final N/A Re-inspection required 4-16-26: Not ready for building final. I noted several items requiring correction which include-missing cover plate at IT room wall switch, label all junction boxes above ceiling,missing knockout at west wall of warehouse, missing receptacle covers at several locations, remove junction boxes off ceiling grid at RT office, remove all awg wires/low voltage not in use, install ADA signs at restrooms, add R3 insulation to hot copper side of water heater, install missing doors. Stopped inspection, however, an in depth inspection will be conducted upon reinspection and we will need access to rooftop.
Note: submit water sterilization/chlorination report, air balance report together with all required condition reports to the city for review.
04/16/2026 COT - HCBU - Building Above Ceiling N/A Re-inspection required 4-16-26: will inspect at upcoming building final.
04/21/2026 COT - HCEL - Electrical Above Ceiling N/A Re-inspection required 4-21-26: janitors closet-add R3 insulation to hot side of water heater, label junction box above ceiling, register must blocked on 3 sides. Breakroom-install dishwasher and hammer arrestor, receptacle under sink must be gfci. Fabric shop-remove tape from receptacles, label junction boxes, and install knockouts at panel dh ( or seek engineer fix addressing obsolete knockouts for existing panel). Assembly-label junction boxes, label junction boxes and missing knockouts at junction box adjacent to Panel C2, missing cover plate with exposed wiring located above ceiling at assembly room 2, provide vertical supports at 10' interval for 1" copper line west wall of warehouse. Rooftop- all rooftop receptacles must weather resistant, label all junction boxes, several units are being over-amped-max breaker is 35. Assembling 3- label junction boxes. Warehouse above ceiling label junction boxes and install knockouts throughout.
Provide an updated RFI/floor plan and a letter from architect documenting the missing installation of shower at room 118.
Stopped inspection-additional items may be noted.
05/20/2025 COT - HCEL - Electrical Intermediate N/A Partial Pass Assembly rooms #1,#2,& #3. Corridor south end. (Man trap # 112) electrical in wall approved. Okay to proceed progress areas. 5/20/2025
04/24/2026 COT - HCEL - Electrical Underground N/A Not Applicable 4-24-26: not approved.
07/18/2025 COT - HCPL - Plumbing Above Ceiling N/A Partial Pass 7-18-25: plumbing above ceiling at room's 117, 118, 120, 121 verified per plans. Okay to proceed with hard lids.
04/24/2026 COT - HCBU - Stem Wall/Retaining Wall N/A Not Applicable 4-24-26: not applicable.
06/06/2025 COT - HCPL - Plumbing Intermediate N/A Partial Pass 6-6-25: verified in wall domestic and DWV at breakroom bathrooms under test and per plans. Copper lines must be insulated and wrapped and will be verified prior to covering lids. Okay to proceed with construction at progress areas.
05/18/2026 COT - FCON - Alarm - Final N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0225-00299
Permit Description: Interior Renovation of existing space for new office and assembly space. No exterior work or changes to exterior.
Total Completed Inspections - 33
Date Description Inspector Results Comments
04/29/2025 COT - HCPL - Rough Soil Passed 4/29/25: plumbing underground at rooms (111,117,118,119,120,121), ok to proceed with backfill and prep for concrete placement.
05/02/2025 COT - HCBU - Roof Nailing Passed
06/27/2025 COT - HCBU - Framing Passed
03/19/2026 PDSD Building Division SIte Consultation Passed
04/07/2026 COT - HCBU - Interior Shear Bracing Passed
04/06/2026 COT - HCPL - Sewer Passed
04/06/2026 COT - HCPL - Plumbing Roof Drains Passed
04/06/2026 COT - HCBU - Preslab Passed
04/06/2026 COT - HCBU - Excavation/Rebar/Zoning Passed
04/06/2026 TRSP - ROW - Final/Close-Out Passed
04/06/2026 COT - HCME - Mechanical Progress Passed
04/06/2026 ENGR Engineering Final Passed
04/06/2026 COT - HCBU - Building Progress Passed
04/16/2026 COT - HCBU - Firewall/Fire Barrier/Firestop Passed 4-16-26: layers of drywall at firewall previously inspected and approved by G.Armenta.
04/17/2026 COT - FCON - Sprinkler - Final Passed Approved on 4/2/26 on permmit TF-FCP-0326-00204.
04/21/2026 COT - HCME - Mechanical Above Ceiling Passed 4-21-26: approved.
04/22/2026 COT - FCON - Fire - Final Passed
04/24/2026 COT - HCBU - Building Final Passed 4-24-26: building final approved.
04/24/2026 COT - HCBU - Building Above Ceiling Passed 4-24-26: building above ceiling approved.
04/24/2026 COT - HCEL - Electrical Final Passed 4-24-26: electrical final approved.
04/24/2026 COT - HCPL - Plumbing Final Passed 4-24-26: approved.
04/24/2026 COT - HCME - Mechanical Final Passed 4-24-26: mechanical final approved.
04/24/2026 COT - HCBU - Exterior Clips/Sheathing Passed 4-24-26: approved.
04/24/2026 COT - HCEL - Electrical Above Ceiling Passed 4-24-26: approved.
04/24/2026 COT - HCEL - Electrical Intermediate Passed 4-24-26: approved.
04/24/2026 COT - HCME - Venting Passed 4-24-26: approved.
04/24/2026 COT - HCME - Mechanical Intermediate Passed 4-24-26: approved.
04/24/2026 COT - HCEL - Electrical Progress Passed 4-24-26: approved.
04/24/2026 COT - HCPL - Plumbing Above Ceiling Passed 4-24-26: approved.
04/24/2026 COT - HCEL - Grounding/Bonding Passed 4-24-26: approved.
04/24/2026 COT - HCEL - Outdoor Lighting Passed 4-24-26: approved.
04/24/2026 COT - HCPL - Plumbing Progress Passed 4-24-26: approved.
04/24/2026 COT - HCPL - Plumbing Intermediate Passed 4-24-26: approved.

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
4_COT PERMIT NARRATIVE TC-COM-0225-00299_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-4_RAH BRITANNIA CD DELTA 1_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
3_RAH BRITANNIA HVAC LOAD CALCS_V1.PDF DOCUMENTS VIEW
3_RAH BRITANNIA STRUC CALC_V1.PDF DOCUMENTS VIEW
CONS-3_RAH BRITANNIA CD FINAL_V3.PDF DOCUMENTS VIEW