| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 4/29/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side. | |
| 05/02/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 4/29/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side. 5/2/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side. |
|
| 05/12/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 4/29/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side. 5/2/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side. 5/12/25: Progress inspection on Assembly room 6 East/South/West walls complete, Assembly room 5 East wall complete. Ok to proceed with mud and tape in progress areas. |
|
| 05/14/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 4/29/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side. 5/2/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side. 5/12/25: Progress inspection on Assembly room 6 East/South/West walls complete, Assembly room 5 East wall complete. Ok to proceed with mud and tape in progress areas. 5/14/25: Assembly room 5 and 6 complete ok to proceed with mud and tape. |
|
| 05/16/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 4/29/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side. 5/2/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side. 5/12/25: Progress inspection on Assembly room 6 East/South/West walls complete, Assembly room 5 East wall complete. Ok to proceed with mud and tape in progress areas. 5/14/25: Assembly room 5 and 6 complete ok to proceed with mud and tape. 5/16/25: Assembly room 4 complete ok to proceed. |
|
| 05/20/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | Gyp board per wall plan. Page A1.01 at corridor south up too man trap #112 Partial pass interior framing for assembly rooms #1, #2, & #3. Pending detail G for diagonal bracing to structure @ every 4’. Page G1.01. 5/20/2025 |
|
| 05/28/2025 | COT - HCBU - Interior Shear Bracing | Re-inspection required | 5-28-25, gyp board nailing spacing at assembly 3 not per plan. Screws shall be no closer than 3/8" from edges/joints and cannot over penetrate more than 1/16". Add screws 8" o.c. And 12" in the field. | |
| 06/04/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6-4-25: exterior shear bracing at conference rooms & interior side of break room verified per plans. Framing and exterior side shear bracing for data room also inspected and approved. Okay to continue with construction at progress areas. | |
| 06/04/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6-4-25: shear wall bracing for Assembly 4 approved. Okay to tape & texture. | |
| 06/11/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 6-11-25: interior shear bracing verified per plans on southside exterior wall of executive/interior side of admin room. Okay to tape & texture progress areas. | |
| COT - HCBU - Interior Shear Bracing | Partial Pass | 4/29/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side. 5/2/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side. 5/12/25: Progress inspection on Assembly room 6 East/South/West walls complete, Assembly room 5 East wall complete. Ok to proceed with mud and tape in progress areas. 5/14/25: Assembly room 5 and 6 complete ok to proceed with mud and tape. 5/16/25: Assembly room 4 complete ok to proceed. Gyp board per wall plan. Page A1.01 at corridor south up too man trap #112 Partial pass interior framing for assembly rooms #1, #2, & #3. Pending detail G for diagonal bracing to structure @ every 4’. Page G1.01. 5/20/2025 5-28-25, gyp board nailing spacing at assembly 3 not per plan. Screws shall be no closer than 3/8" from edges/joints and cannot over penetrate more than 1/16". Add screws 8" o.c. And 12" in the field. 6-4-25: exterior shear bracing at conference rooms & interior side of break room verified per plans. Framing and exterior side shear bracing for data room also inspected and approved. Okay to continue with construction at progress areas. 6-4-25: shear wall bracing for Assembly 4 approved. Okay to tape & texture. 6-11-25: interior shear bracing verified per plans on southside exterior wall of executive/interior side of admin room. Okay to tape & texture progress areas. 6/27/25: pending hard lid areas. |
||
| 09/25/2025 | COT - HCBU - Interior Shear Bracing | Partial Pass | 9-25-25: interior shear bracing at room's 117, 118, 120, 121 approved. Okay for tape & texture. |