Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel: 14029003H


Addresses:

3480 E BRITANNIA DR


Inspection Status: Partial Pass

Inspection History: COT - HCBU - Interior Shear Bracing 

Permit Number - TC-COM-0225-00299

Inspection Description - COT - HCBU - Interior Shear Bracing 

Inspection Status - Partial Pass

Date Description Inspector Results Comments
04/29/2025 COT - HCBU - Interior Shear Bracing  Partial Pass 4/29/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side.
05/02/2025 COT - HCBU - Interior Shear Bracing  Partial Pass 4/29/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side.
5/2/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side.
05/12/2025 COT - HCBU - Interior Shear Bracing  Partial Pass 4/29/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side.
5/2/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side.
5/12/25: Progress inspection on Assembly room 6 East/South/West walls complete, Assembly room 5 East wall complete. Ok to proceed with mud and tape in progress areas.
05/14/2025 COT - HCBU - Interior Shear Bracing  Partial Pass 4/29/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side.
5/2/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side.
5/12/25: Progress inspection on Assembly room 6 East/South/West walls complete, Assembly room 5 East wall complete. Ok to proceed with mud and tape in progress areas.
5/14/25: Assembly room 5 and 6 complete ok to proceed with mud and tape.
05/16/2025 COT - HCBU - Interior Shear Bracing  Partial Pass 4/29/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side.
5/2/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side.
5/12/25: Progress inspection on Assembly room 6 East/South/West walls complete, Assembly room 5 East wall complete. Ok to proceed with mud and tape in progress areas.
5/14/25: Assembly room 5 and 6 complete ok to proceed with mud and tape.
5/16/25: Assembly room 4 complete ok to proceed.
05/20/2025 COT - HCBU - Interior Shear Bracing  Partial Pass Gyp board per wall plan. Page A1.01 at corridor south up too man trap #112
Partial pass interior framing for assembly rooms #1, #2, & #3. Pending detail G for diagonal bracing to structure @ every 4’. Page G1.01. 5/20/2025
05/28/2025 COT - HCBU - Interior Shear Bracing  Re-inspection required 5-28-25, gyp board nailing spacing at assembly 3 not per plan. Screws shall be no closer than 3/8" from edges/joints and cannot over penetrate more than 1/16". Add screws 8" o.c. And 12" in the field.
06/04/2025 COT - HCBU - Interior Shear Bracing  Partial Pass 6-4-25: exterior shear bracing at conference rooms & interior side of break room verified per plans. Framing and exterior side shear bracing for data room also inspected and approved. Okay to continue with construction at progress areas.
06/04/2025 COT - HCBU - Interior Shear Bracing  Partial Pass 6-4-25: shear wall bracing for Assembly 4 approved. Okay to tape & texture.
06/11/2025 COT - HCBU - Interior Shear Bracing  Partial Pass 6-11-25: interior shear bracing verified per plans on southside exterior wall of executive/interior side of admin room. Okay to tape & texture progress areas.
COT - HCBU - Interior Shear Bracing  Partial Pass 4/29/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side.
5/2/25: Progress inspection on Assembly rooms (4,5,6) ok to proceed with one-side.
5/12/25: Progress inspection on Assembly room 6 East/South/West walls complete, Assembly room 5 East wall complete. Ok to proceed with mud and tape in progress areas.
5/14/25: Assembly room 5 and 6 complete ok to proceed with mud and tape.
5/16/25: Assembly room 4 complete ok to proceed.

Gyp board per wall plan. Page A1.01 at corridor south up too man trap #112
Partial pass interior framing for assembly rooms #1, #2, & #3. Pending detail G for diagonal bracing to structure @ every 4’. Page G1.01. 5/20/2025
5-28-25, gyp board nailing spacing at assembly 3 not per plan. Screws shall be no closer than 3/8" from edges/joints and cannot over penetrate more than 1/16". Add screws 8" o.c. And 12" in the field.
6-4-25: exterior shear bracing at conference rooms & interior side of break room verified per plans. Framing and exterior side shear bracing for data room also inspected and approved. Okay to continue with construction at progress areas.
6-4-25: shear wall bracing for Assembly 4 approved. Okay to tape & texture.
6-11-25: interior shear bracing verified per plans on southside exterior wall of executive/interior side of admin room. Okay to tape & texture progress areas.
6/27/25: pending hard lid areas.
09/25/2025 COT - HCBU - Interior Shear Bracing  Partial Pass 9-25-25: interior shear bracing at room's 117, 118, 120, 121 approved. Okay for tape & texture.