Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0224-00272
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
6175 S MIDVALE PARK RD BLDG 4
Address NEW:
6175 S MIDVALE PARK RD BLDG 4
Apply Date:
02/08/2024
Applicant:
Carlos Navarro
Description:
BLDG D SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Permit Reviews
Permit Number - TC-COM-0224-00272
Permit Status: Inspections
Permit Description: BLDG D SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/31/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/26/2024 | APPROVED |
| 02/08/2024 | COMMERCIAL REVIEW - FULL v.1 | 03/18/2024 | REQUIRES RESUBMIT |
| 02/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/03/2025 | REQUIRES RESUBMIT |
| 06/25/2024 | COMMERCIAL REVIEW - FULL v.3 | 07/08/2024 | REQUIRES RESUBMIT |
| 07/11/2024 | COMMERCIAL REVIEW - FULL v.4 | 07/11/2024 | APPROVED |
| 04/09/2024 | COMMERCIAL REVIEW - FULL v.2 | 05/08/2024 | REQUIRES RESUBMIT |
| 04/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/21/2025 | REQUIRES RESUBMIT |
| 02/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/04/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0224-00272
Permit Status: Inspections
Permit Description: BLDG D SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 07/01/2024 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
| 07/01/2024 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
| 07/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 07/01/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 07/01/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
| 07/01/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 07/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/01/2024 | Post-Tension Inspection Report is required. |
| 07/01/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0224-00272
Permit Status: Inspections
Permit Description: BLDG D SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
| Date | Description | Comments |
|---|---|---|
| 02/08/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 02/08/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/11/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) TD-DEV-0124-00025 permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
| 02/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/01/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0224-00272
Permite Description: BLDG D SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/22/2025 | COT - HCBU - Framing | N/A | Partial Pass | 2/28/25: Building D 2nd floor decking approved. Ok to proceed. 4/22/25: exterior sheathing approved, interior sheathing partial pass. Pending walls that require shear on both sides due to M.E.P not being completed. |
| 07/15/2025 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | 7-15-25: MEP's at on walls and above ceiling for second level of Building 4 verified per plans. Okay to continue with construction at progress areas. |
| 07/15/2025 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | 7-15-25: MEP's at on walls and above ceiling for second level of Building 4 verified per plans. Okay to continue with construction at progress areas. |
| 07/15/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 7-15-25: MEP's in walls and above ceiling for second level of Building 4 verified per plans. Okay to continue with construction at progress areas. |
| 07/15/2025 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 7-15-25: MEP's at on walls and above ceiling for second level of Building 4 verified per plans. Okay to continue with construction at progress areas. |
| 03/04/2025 | COT - HCBU - Building Progress | N/A | Partial Pass | 3-4-25, partial pass-verified approximately 300 ft. of 8inch sewer line on south end of site and terminated near the proximity of breezeway Building C. Remaining section of sewer will be installed and reinspected under test at later date. Okay to backfill with shading materials. |
| 11/07/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | Partial pass. Underground rough plumbing inspection for Bldg. pad D. Okay to backfill progress areas. 11/7/2024 |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0224-00272
Permit Description: BLDG D SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2024 | COT - HCBU - Preslab | Passed | 12/23/24: reinforcement and Post tension cables per plans ok to proceed | |
| 03/28/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 08/08/2025 | COT - HCME - Mechanical Intermediate | Passed | 8/7/25: Hood range duct at kitchen, 2nd floor building C, 8 units. | |
| 09/18/2025 | BULD - Electrical Clearance | Passed | 9-18-25: okay to energize Building D, unit's 4101, 4103, 4203, 4201, 4202, 4102, 4204, 4104, 4106, 4206, 4108, 4208, 4107, 4105, 4205, 4207. ECO clearance issued to TEP. | |
| 12/05/2025 | COT - HCEL - Electrical Intermediate | Passed | 12-5-25: approved. | |
| 12/05/2025 | COT - HCPL - Plumbing Intermediate | Passed | 12-5-25: approved. | |
| 12/05/2025 | COT - HCBU - Building Progress | Passed | 12-5-25: approved. | |
| 12/05/2025 | COT - HCPL - Plumbing Progress | Passed | 12-5-25: approved. |