Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
02/08/2024
Applicant:
Carlos Navarro
Description:
BLDG D SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.

Permit Reviews

Permit Number - TC-COM-0224-00272
Permit Status: Issued
Permit Description: BLDG D SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Start Date Submittal Complete Date Status  
10/31/2024 COMMERCIAL REVIEW - FULL v.1 11/26/2024 APPROVED Review Details
02/08/2024 COMMERCIAL REVIEW - FULL v.1 03/18/2024 REQUIRES RESUBMIT Review Details
02/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/03/2025 REQUIRES RESUBMIT Review Details
06/25/2024 COMMERCIAL REVIEW - FULL v.3 07/08/2024 REQUIRES RESUBMIT Review Details
12/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/26/2025 APPROVED Review Details
07/11/2024 COMMERCIAL REVIEW - FULL v.4 07/11/2024 APPROVED Review Details
04/09/2024 COMMERCIAL REVIEW - FULL v.2 05/08/2024 REQUIRES RESUBMIT Review Details
01/22/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/29/2026 APPROVED Review Details
04/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/21/2025 REQUIRES RESUBMIT Review Details
02/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 03/04/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0224-00272
Permit Status: Issued
Permit Description: BLDG D SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Date Description Comments
02/08/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
07/01/2024 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
07/01/2024 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
02/08/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
07/11/2024 Prior to Issuance: This project requires issuance of a Development Package (DP) TD-DEV-0124-00025 permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
07/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/01/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
07/01/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
07/01/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
07/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/01/2024 Post-Tension Inspection Report is required.
02/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/01/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
07/01/2024 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0224-00272
Permite Description: BLDG D SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Outstanding Inspections - 14
Last Inspection Date Description Inspector Results Comments
07/15/2025 COT - HCME - Mechanical Intermediate N/A Partial Pass 7-15-25: MEP's at on walls and above ceiling for second level of Building 4 verified per plans. Okay to continue with construction at progress areas.
07/15/2025 COT - HCEL - Electrical Intermediate N/A Partial Pass 7-15-25: MEP's in walls and above ceiling for second level of Building 4 verified per plans. Okay to continue with construction at progress areas.
07/15/2025 COT - HCPL - Plumbing Intermediate N/A Partial Pass 7-15-25: MEP's at on walls and above ceiling for second level of Building 4 verified per plans. Okay to continue with construction at progress areas.
03/04/2025 COT - HCBU - Building Progress N/A Partial Pass 3-4-25, partial pass-verified approximately 300 ft. of 8inch sewer line on south end of site and terminated near the proximity of breezeway Building C. Remaining section of sewer will be installed and reinspected under test at later date. Okay to backfill with shading materials.
11/07/2024 COT - HCPL - Plumbing Progress N/A Partial Pass Partial pass. Underground rough plumbing inspection for Bldg. pad D. Okay to backfill progress areas. 11/7/2024
07/15/2025 COT - HCBU - Building Above Ceiling N/A Partial Pass 7-15-25: MEP's at on walls and above ceiling for second level of Building 4 verified per plans. Okay to continue with construction at progress areas.
04/22/2025 COT - HCBU - Framing N/A Partial Pass 2/28/25: Building D 2nd floor decking approved. Ok to proceed.
4/22/25: exterior sheathing approved, interior sheathing partial pass. Pending walls that require shear on both sides due to M.E.P not being completed.
12/18/2025 COT - HCPL - Plumbing Final N/A Re-inspection required 12-18-25: 4204-missing hammer arrestors at dishwasher/washer box, insulation missing at hot water line at utility room, no running water at kitchen sink, firefoam penetrations at utility room. 4202-insulation missing on hot water lines at utility room, fire foam penetrations, hammer arrestor required at laundry, check water pressure at kitchen sink. 4203-Seal penetration at utility room, insulation missing on hot water line at utility room, check water pressure at kitchen sink.4201-insulation on hot water lines missing at utility, seal penetration in utility, check water pressure at kitchen sink.
Per previous notes-fall protection may be required.
12/18/2025 COT - HCME - Mechanical Final N/A Re-inspection required 12-18-25: 4204-missing hammer arrestors at dishwasher/washer box, insulation missing at hot water line at utility room, no running water at kitchen sink, firefoam penetrations at utility room. 4202-insulation missing on hot water lines at utility room, fire foam penetrations, hammer arrestor required at laundry, check water pressure at kitchen sink. 4203-Seal penetration at utility room, insulation missing on hot water line at utility room, check water pressure at kitchen sink.4201-insulation on hot water lines missing at utility, seal penetration in utility, check water pressure at kitchen sink.
Per previous notes-fall protection may be required.
12/18/2025 COT - HCEL - Electrical Final N/A Partial Pass 12-18-25: electrical for room's 4201, 4202, 4203, 4204 approved.
01/12/2026 COT - FCON - Fire - Final N/A Partial Pass Ok for Level 4 TCO.
01/21/2026 COT - HCBU - Building Final N/A Partial Pass 1/21/26: OAKY FOR LEVEL 4 TCO
01/21/2026 ENGR Engineering Final N/A Partial Pass Okay for level 4 TCO
COT - HCBU - CofO N/A Scheduled

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0224-00272
Permit Description: BLDG D SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Completed Inspections - 27
Date Description Inspector Results Comments
12/23/2024 COT - HCBU - Preslab Passed 12/23/24: reinforcement and Post tension cables per plans ok to proceed
03/28/2025 COT - HCBU - Roof Nailing Passed
08/08/2025 COT - HCME - Mechanical Intermediate Passed 8/7/25: Hood range duct at kitchen, 2nd floor building C, 8 units.
09/18/2025 BULD - Electrical Clearance Passed 9-18-25: okay to energize Building D, unit's 4101, 4103, 4203, 4201, 4202, 4102, 4204, 4104, 4106, 4206, 4108, 4208, 4107, 4105, 4205, 4207. ECO clearance issued to TEP.
12/05/2025 COT - HCEL - Electrical Intermediate Passed 12-5-25: approved.
12/05/2025 COT - HCPL - Plumbing Intermediate Passed 12-5-25: approved.
12/05/2025 COT - HCBU - Building Progress Passed 12-5-25: approved.
12/05/2025 COT - HCPL - Plumbing Progress Passed 12-5-25: approved.
12/09/2025 COT - HCBU - Exterior Clips/Sheathing Passed
12/09/2025 COT - BULD - SWG Clearance Passed
12/09/2025 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
12/09/2025 COT - HCEL - Electrical Above Ceiling Passed
12/09/2025 COT - HCBU - Interior Shear Bracing Passed
12/09/2025 COT - HCPL - Plumbing Above Ceiling Passed
12/09/2025 COT - HCME - Mechanical Progress Passed
12/09/2025 COT - HCME - Mechanical Above Ceiling Passed
12/09/2025 COT - HCEL - Electrical Progress Passed
12/09/2025 COT - HCBU - Excavation/Rebar/Zoning Passed
12/09/2025 COT - HCBU - Building Above Ceiling Passed
12/09/2025 COT - HCBU - Framing Passed
12/15/2025 COT - FCON - Sprinkler - Final Passed Still need to do water tamper and flow.
01/06/2026 COT - HCPL - Plumbing Final Passed 1/6/2026 all corrections have been made.
01/06/2026 COT - HCME - Mechanical Final Passed 1/6/2026 all corrections have been made.
01/06/2026 COT - HCEL - Electrical Final Passed 1/6/2026 all corrections have been made.
01/08/2026 TRSP - ROW - Final/Close-Out Passed
01/09/2026 COT - FCON - Alarm - Final Passed
01/21/2026 COT - FCON - Fire - Final Passed by motto

Scheduled Inspections

Scheduled Inspections - TC-COM-0224-00272
Status: Issued
Description: BLDG D SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Scheduled Date Description Entered By Entered Date
02/06/2026 COT - HCBU - CofO Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
BUILDING C AND D CHLORINATION REPORT-2026-01-21_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO (SSRS).PDF DOCUMENTS VIEW
DESERT DOVE APTS., BUILDING D - TC-COM -0224-00272-2025-12-15_V1.PDF DOCUMENTS VIEW
DDA TRUSS DESIGN AND LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW