Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
02/08/2024
Applicant:
Carlos Navarro
Description:
BLDG C SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.

Permit Reviews

Permit Number - TC-COM-0224-00271
Permit Status: Inspections
Permit Description: BLDG C SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Start Date Submittal Complete Date Status  
04/09/2024 COMMERCIAL REVIEW - FULL v.2 05/08/2024 REQUIRES RESUBMIT Review Details
02/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/03/2025 REQUIRES RESUBMIT Review Details
10/31/2024 COMMERCIAL REVIEW - FULL v.1 11/26/2024 APPROVED Review Details
06/25/2024 COMMERCIAL REVIEW - FULL v.3 07/08/2024 REQUIRES RESUBMIT Review Details
01/21/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.3 01/27/2026 APPROVED Review Details
12/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/18/2025 REQUIRES RESUBMIT Review Details
04/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/21/2025 REQUIRES RESUBMIT Review Details
07/11/2024 COMMERCIAL REVIEW - FULL v.4 07/11/2024 APPROVED Review Details
02/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/25/2025 APPROVED Review Details
01/06/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/07/2026 REQUIRES RESUBMIT Review Details
02/08/2024 COMMERCIAL REVIEW - FULL v.1 03/18/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0224-00271
Permit Status: Inspections
Permit Description: BLDG C SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Date Description Comments
02/08/2024 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
07/01/2024 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
07/01/2024 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
02/08/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
07/11/2024 Prior to Issuance: This project requires issuance of a Development Package (DP) TD-DEV-0124-00025 permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
07/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/01/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
07/01/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
07/01/2024 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
07/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/01/2024 Post-Tension Inspection Report is required.
02/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/01/2024 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
07/01/2024 SPECIAL INSPECTION FOR WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0224-00271
Permite Description: BLDG C SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Outstanding Inspections - 12
Last Inspection Date Description Inspector Results Comments
07/30/2025 COT - HCME - Mechanical Intermediate N/A Partial Pass 7-30-25: mechanical intermediate inspection on Building C verified per plans. Okay to continue with construction at progress areas.
07/28/2025 COT - HCBU - Building Above Ceiling N/A Not Ready
07/30/2025 COT - HCEL - Electrical Above Ceiling N/A Partial Pass 7-30-25: electrical above ceiling for Building C verified per plans. Okay to continue with construction at progress areas.
07/30/2025 COT - HCPL - Plumbing Intermediate N/A Partial Pass 7-30-25: plumbing intermediate in Building C verified per plans. Okay to continue with construction at progress areas.
11/15/2024 COT - HCPL - Plumbing Progress N/A Partial Pass 11/15/24: plumbing underground per plans ok to proceed with backfill.
12/11/2025 COT - HCPL - Plumbing Final N/A Re-inspection required 12-11-25: plumbing, electrical, mechanical on room's 3204-install a gfci for receptacle in storage room, add plastic bushings for low voltage wires at furnace, add R3 insulation to hot leg of water heater, missing hammer arrestors for washer/dryer, missing shower head in each shower, seal penetration at storage room, install microwave. 3202-R3 on hot leg of of water heater, gfci receptacle required in storage missing, missing shower heads, missing hammer arrestor at washer/dryer and dishwasher, seal penetration in storage, install microwave in all units. 3201-missing gfci receptacle in storage, seal penetration in storage, add R3 insulation to hot leg of water heater, install microwave, missing hammer arrestors in washer/dryer/dishwasher. 3203-seal penetration in storage, missing gfci receptacle in storage, add R3 insulation to hot leg of water heater, install microwave, missing hammer arrestors in washer/dryer and dishwasher. Could not test water in any of the 4 rooms due to water chlorination test in progress.
12/11/2025 COT - HCME - Mechanical Final N/A Re-inspection required 12-11-25: plumbing, electrical, mechanical on room's 3204-install a gfci for receptacle in storage room, add plastic bushings for low voltage wires at furnace, add R3 insulation to hot leg of water heater, missing hammer arrestors for washer/dryer, missing shower head in each shower, seal penetration at storage room, install microwave. 3202-R3 on hot leg of of water heater, gfci receptacle required in storage missing, missing shower heads, missing hammer arrestor at washer/dryer and dishwasher, seal penetration in storage, install microwave in all units. 3201-missing gfci receptacle in storage, seal penetration in storage, add R3 insulation to hot leg of water heater, install microwave, missing hammer arrestors in washer/dryer/dishwasher. 3203-seal penetration in storage, missing gfci receptacle in storage, add R3 insulation to hot leg of water heater, install microwave, missing hammer arrestors in washer/dryer and dishwasher. Could not test water in any of the 4 rooms due to water chlorination test in progress.
12/11/2025 COT - HCEL - Electrical Final N/A Re-inspection required 12-11-25: plumbing, electrical, mechanical on room's 3204-install a gfci for receptacle in storage room, add plastic bushings for low voltage wires at furnace, add R3 insulation to hot leg of water heater, missing hammer arrestors for washer/dryer, missing shower head in each shower, seal penetration at storage room, install microwave. 3202-R3 on hot leg of of water heater, gfci receptacle required in storage missing, missing shower heads, missing hammer arrestor at washer/dryer and dishwasher, seal penetration in storage, install microwave in all units. 3201-missing gfci receptacle in storage, seal penetration in storage, add R3 insulation to hot leg of water heater, install microwave, missing hammer arrestors in washer/dryer/dishwasher. 3203-seal penetration in storage, missing gfci receptacle in storage, add R3 insulation to hot leg of water heater, install microwave, missing hammer arrestors in washer/dryer and dishwasher. Could not test water in any of the 4 rooms due to water chlorination test in progress.
01/12/2026 COT - FCON - Fire - Final N/A Partial Pass Ok for Level 4 TCO.
01/21/2026 COT - HCBU - Building Final N/A Partial Pass 1/21/26: OAKY FOR LEVEL 4 TCO
01/21/2026 ENGR Engineering Final N/A Partial Pass Okay for level 4 TCO
COT - HCBU - CofO N/A Scheduled

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0224-00271
Permit Description: BLDG C SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Completed Inspections - 26
Date Description Inspector Results Comments
01/28/2025 COT - HCBU - Preslab Passed
08/08/2025 COT - HCME - Mechanical Intermediate Passed 7-30-25: mechanical intermediate inspection on Building C verified per plans. Okay to continue with construction at progress areas.
8/7/25: Hood range duct at kitchen, 2nd floor building C, 8 units.
09/24/2025 BULD - Electrical Clearance Passed 9-24-25: okay to energize Building 3 unit's, 3203, 3201, 3103, 3101, 3102, 3104, 3202, 3204, House panel, 3208, 3108, 3106, 3206, 3107, 3205, 3105, 3205. ECO clearance issued to TEP.
12/09/2025 COT - BULD - SWG Clearance Passed
12/09/2025 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
12/09/2025 COT - HCBU - Framing Passed
12/09/2025 COT - HCBU - Excavation/Rebar/Zoning Passed
12/09/2025 COT - HCEL - Electrical Progress Passed
12/09/2025 COT - HCME - Mechanical Progress Passed
12/09/2025 COT - HCBU - Building Above Ceiling Passed
12/09/2025 COT - HCBU - Building Progress Passed
12/09/2025 COT - HCEL - Electrical Intermediate Passed
12/09/2025 COT - HCBU - Interior Shear Bracing Passed
12/09/2025 COT - HCBU - Roof Nailing Passed
12/09/2025 COT - HCEL - Electrical Above Ceiling Passed
12/09/2025 COT - HCPL - Plumbing Intermediate Passed
12/09/2025 COT - HCME - Mechanical Above Ceiling Passed
12/09/2025 COT - HCPL - Plumbing Above Ceiling Passed
12/09/2025 COT - HCPL - Plumbing Progress Passed
01/06/2026 COT - HCPL - Plumbing Final Passed 1/6/2026 all corrections have been made.
01/06/2026 COT - HCME - Mechanical Final Passed 1/6/2026 all corrections have been made.
01/06/2026 COT - HCEL - Electrical Final Passed 1/6/2026 all corrections have been made.
01/08/2026 TRSP - ROW - Final/Close-Out Passed
01/09/2026 COT - FCON - Sprinkler - Final Passed
01/09/2026 COT - FCON - Alarm - Final Passed
01/21/2026 COT - FCON - Fire - Final Passed

Scheduled Inspections

Scheduled Inspections - TC-COM-0224-00271
Status: Inspections
Description: BLDG C SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Scheduled Date Description Entered By Entered Date
02/06/2026 COT - HCBU - CofO Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
BUILDING C AND D CHLORINATION REPORT-2026-01-21_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO (SSRS).PDF DOCUMENTS VIEW
DDA TRUSS DESIGN AND LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW