Permit: TC-COM-0224-00271
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
6175 S MIDVALE PARK RD BLDG 3
Address NEW:
6175 S MIDVALE PARK RD BLDG 3
Apply Date:
02/08/2024
Applicant:
Carlos Navarro
Description:
BLDG C SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas. The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Permit Reviews
Permit Number - TC-COM-0224-00271
Permit Status: Inspections
Permit Description: BLDG C SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/09/2024 | COMMERCIAL REVIEW - FULL v.2 | 05/08/2024 | REQUIRES RESUBMIT |
| 02/03/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/03/2025 | REQUIRES RESUBMIT |
| 10/31/2024 | COMMERCIAL REVIEW - FULL v.1 | 11/26/2024 | APPROVED |
| 06/25/2024 | COMMERCIAL REVIEW - FULL v.3 | 07/08/2024 | REQUIRES RESUBMIT |
| 01/21/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 01/27/2026 | APPROVED |
| 12/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/18/2025 | REQUIRES RESUBMIT |
| 04/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/21/2025 | REQUIRES RESUBMIT |
| 07/11/2024 | COMMERCIAL REVIEW - FULL v.4 | 07/11/2024 | APPROVED |
| 02/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/25/2025 | APPROVED |
| 01/06/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 01/07/2026 | REQUIRES RESUBMIT |
| 02/08/2024 | COMMERCIAL REVIEW - FULL v.1 | 03/18/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0224-00271
Permit Status: Inspections
Permit Description: BLDG C SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
| Date | Description | Comments |
|---|---|---|
| 02/08/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 07/01/2024 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. | |
| 07/01/2024 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 02/08/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/11/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) TD-DEV-0124-00025 permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
| 07/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 07/01/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
| 07/01/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 07/01/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 07/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 07/01/2024 | Post-Tension Inspection Report is required. | |
| 02/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/01/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 07/01/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0224-00271
Permite Description: BLDG C SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Outstanding Inspections - 12
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2025 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | 7-30-25: mechanical intermediate inspection on Building C verified per plans. Okay to continue with construction at progress areas. |
| 07/28/2025 | COT - HCBU - Building Above Ceiling | N/A | Not Ready | |
| 07/30/2025 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | 7-30-25: electrical above ceiling for Building C verified per plans. Okay to continue with construction at progress areas. |
| 07/30/2025 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 7-30-25: plumbing intermediate in Building C verified per plans. Okay to continue with construction at progress areas. |
| 11/15/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 11/15/24: plumbing underground per plans ok to proceed with backfill. |
| 12/11/2025 | COT - HCPL - Plumbing Final | N/A | Re-inspection required | 12-11-25: plumbing, electrical, mechanical on room's 3204-install a gfci for receptacle in storage room, add plastic bushings for low voltage wires at furnace, add R3 insulation to hot leg of water heater, missing hammer arrestors for washer/dryer, missing shower head in each shower, seal penetration at storage room, install microwave. 3202-R3 on hot leg of of water heater, gfci receptacle required in storage missing, missing shower heads, missing hammer arrestor at washer/dryer and dishwasher, seal penetration in storage, install microwave in all units. 3201-missing gfci receptacle in storage, seal penetration in storage, add R3 insulation to hot leg of water heater, install microwave, missing hammer arrestors in washer/dryer/dishwasher. 3203-seal penetration in storage, missing gfci receptacle in storage, add R3 insulation to hot leg of water heater, install microwave, missing hammer arrestors in washer/dryer and dishwasher. Could not test water in any of the 4 rooms due to water chlorination test in progress. |
| 12/11/2025 | COT - HCME - Mechanical Final | N/A | Re-inspection required | 12-11-25: plumbing, electrical, mechanical on room's 3204-install a gfci for receptacle in storage room, add plastic bushings for low voltage wires at furnace, add R3 insulation to hot leg of water heater, missing hammer arrestors for washer/dryer, missing shower head in each shower, seal penetration at storage room, install microwave. 3202-R3 on hot leg of of water heater, gfci receptacle required in storage missing, missing shower heads, missing hammer arrestor at washer/dryer and dishwasher, seal penetration in storage, install microwave in all units. 3201-missing gfci receptacle in storage, seal penetration in storage, add R3 insulation to hot leg of water heater, install microwave, missing hammer arrestors in washer/dryer/dishwasher. 3203-seal penetration in storage, missing gfci receptacle in storage, add R3 insulation to hot leg of water heater, install microwave, missing hammer arrestors in washer/dryer and dishwasher. Could not test water in any of the 4 rooms due to water chlorination test in progress. |
| 12/11/2025 | COT - HCEL - Electrical Final | N/A | Re-inspection required | 12-11-25: plumbing, electrical, mechanical on room's 3204-install a gfci for receptacle in storage room, add plastic bushings for low voltage wires at furnace, add R3 insulation to hot leg of water heater, missing hammer arrestors for washer/dryer, missing shower head in each shower, seal penetration at storage room, install microwave. 3202-R3 on hot leg of of water heater, gfci receptacle required in storage missing, missing shower heads, missing hammer arrestor at washer/dryer and dishwasher, seal penetration in storage, install microwave in all units. 3201-missing gfci receptacle in storage, seal penetration in storage, add R3 insulation to hot leg of water heater, install microwave, missing hammer arrestors in washer/dryer/dishwasher. 3203-seal penetration in storage, missing gfci receptacle in storage, add R3 insulation to hot leg of water heater, install microwave, missing hammer arrestors in washer/dryer and dishwasher. Could not test water in any of the 4 rooms due to water chlorination test in progress. |
| 01/12/2026 | COT - FCON - Fire - Final | N/A | Partial Pass | Ok for Level 4 TCO. |
| 01/21/2026 | COT - HCBU - Building Final | N/A | Partial Pass | 1/21/26: OAKY FOR LEVEL 4 TCO |
| 01/21/2026 | ENGR Engineering Final | N/A | Partial Pass | Okay for level 4 TCO |
| COT - HCBU - CofO | N/A | Scheduled |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0224-00271
Permit Description: BLDG C SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
Total Completed Inspections - 26
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2025 | COT - HCBU - Preslab | Passed | ||
| 08/08/2025 | COT - HCME - Mechanical Intermediate | Passed | 7-30-25: mechanical intermediate inspection on Building C verified per plans. Okay to continue with construction at progress areas. 8/7/25: Hood range duct at kitchen, 2nd floor building C, 8 units. |
|
| 09/24/2025 | BULD - Electrical Clearance | Passed | 9-24-25: okay to energize Building 3 unit's, 3203, 3201, 3103, 3101, 3102, 3104, 3202, 3204, House panel, 3208, 3108, 3106, 3206, 3107, 3205, 3105, 3205. ECO clearance issued to TEP. | |
| 12/09/2025 | COT - BULD - SWG Clearance | Passed | ||
| 12/09/2025 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 12/09/2025 | COT - HCBU - Framing | Passed | ||
| 12/09/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 12/09/2025 | COT - HCEL - Electrical Progress | Passed | ||
| 12/09/2025 | COT - HCME - Mechanical Progress | Passed | ||
| 12/09/2025 | COT - HCBU - Building Above Ceiling | Passed | ||
| 12/09/2025 | COT - HCBU - Building Progress | Passed | ||
| 12/09/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 12/09/2025 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 12/09/2025 | COT - HCBU - Roof Nailing | Passed | ||
| 12/09/2025 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 12/09/2025 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 12/09/2025 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 12/09/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 12/09/2025 | COT - HCPL - Plumbing Progress | Passed | ||
| 01/06/2026 | COT - HCPL - Plumbing Final | Passed | 1/6/2026 all corrections have been made. | |
| 01/06/2026 | COT - HCME - Mechanical Final | Passed | 1/6/2026 all corrections have been made. | |
| 01/06/2026 | COT - HCEL - Electrical Final | Passed | 1/6/2026 all corrections have been made. | |
| 01/08/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 01/09/2026 | COT - FCON - Sprinkler - Final | Passed | ||
| 01/09/2026 | COT - FCON - Alarm - Final | Passed | ||
| 01/21/2026 | COT - FCON - Fire - Final | Passed |
Scheduled Inspections
Scheduled Inspections - TC-COM-0224-00271
Status: Inspections
Description: BLDG C SEE PERMIT APPLICATION NUMBER TC-COM-0124-00215 - The proposed project consists of 64 units of rental apartments in (4) 2-Story buildingS. The tenants will be served by a single-story community center located on the site, as well as on-site resident amenities such as BBQ and gathering areas, and children’s play areas.
The site will be accessed from a formal entry ON SOUTH BUFKIN DRIVE. Site circulation is comprised of double and single loaded parking aisles, with an even distribution of accessible spaces. Refuse and recycle collection areas are distributed throughout the site for ease of access.
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 02/06/2026 | COT - HCBU - CofO | Scheduled |