Inspection Status: Passed

Inspection History: COT - HCPL - Plumbing Final 

Date Description Inspector Results Comments
01/06/2026 COT - HCPL - Plumbing Final  Passed 1/6/2026 all corrections have been made.
12/11/2025 COT - HCPL - Plumbing Final  Re-inspection required 12-11-25: plumbing, electrical, mechanical on room's 3204-install a gfci for receptacle in storage room, add plastic bushings for low voltage wires at furnace, add R3 insulation to hot leg of water heater, missing hammer arrestors for washer/dryer, missing shower head in each shower, seal penetration at storage room, install microwave. 3202-R3 on hot leg of of water heater, gfci receptacle required in storage missing, missing shower heads, missing hammer arrestor at washer/dryer and dishwasher, seal penetration in storage, install microwave in all units. 3201-missing gfci receptacle in storage, seal penetration in storage, add R3 insulation to hot leg of water heater, install microwave, missing hammer arrestors in washer/dryer/dishwasher. 3203-seal penetration in storage, missing gfci receptacle in storage, add R3 insulation to hot leg of water heater, install microwave, missing hammer arrestors in washer/dryer and dishwasher. Could not test water in any of the 4 rooms due to water chlorination test in progress.
12/12/2025 COT - HCPL - Plumbing Final  Re-inspection required 12/12/2025 Per previous notes at building 3. 4 units bottom floors. Mentioned a vertical bar at ADU unit at water closet.
12/15/2025 COT - HCPL - Plumbing Final  Re-inspection required closet.

12-15-25: unit 3206-gfci receptacle at storage missing, seal penetration at storage with drywall, hammer arrestor for washer/dryer,dishwasher, R-3 insulation to hot leg of water heater. 3208, gfci receptacle at storage, seal penetration at storage closet, R3 insulation to hot leg of water heater, missing hammer arrestor at washer/dryer/dishwasher, 3207-seal penetration at storage closet, missing gfci receptacle at storage, R3 insulation hot leg of water heater. 3205-seal penetration at storage closet, gfci receptacle at storage, R3 insulation to hot leg of water heater, hammer arrestors missing at washer/dryer/dishwasher. Gfci receptacles are required for laundry room- add gfci receptacles throughout all units previously walked at laundry.