Inspection Status: Partial Pass

Inspection History: COT - HCBU - Interior Shear Bracing 

Date Description Inspector Results Comments
04/24/2025 COT - HCBU - Interior Shear Bracing  Partial Pass 4/24/25: First floor sheathing fastened per plan, (Hold down spacing not per shear-wall schedule, shot pins spacing not per shear wall schedule, HTT4 MISSING ON FIRST FLOOR, Holddown location not per plan at shear walls that are 9' in length.
04/25/2025 COT - HCBU - Interior Shear Bracing  Partial Pass 4/24/25: First floor sheathing fastened per plan, (Hold down spacing not per shear-wall schedule, shot pins spacing not per shear wall schedule, HTT4 MISSING ON FIRST FLOOR, Holddown location not per plan at shear walls that are 9' in length.
4/25/24: corrections made ok to proceed.
12/09/2025 COT - HCBU - Interior Shear Bracing  Passed