Permit Details

Status:
Issued
Type:
Commercial Building
Address:
3450 S KINO PW
Address NEW:
3450 S KINO PW
Apply Date:
02/21/2023
Applicant:
Lisa Bowers
Description:
New single story coffee shop with drive thru REV1_Changes to the plans include, but are not limited too: 1. Revised drive through lane configuration and equipment 2. Revised interior wall configuration 3. Revised patio trellis/cover system (footprint remains the same) 4. Revised interior finish system 5. Revised ceiling elements, lighting, and finishes 6. Revised roof layout to blend better with interior layout. 7. Revised exterior finish systems and signage (signage to be a deferred submittal) 8. Revised equipment package for a Black Rifle Coffee Company store 9. Revised structural system to support new exterior design and roof EQ placement 10. Revised interior plumbing plans to match to the new interior EQ layout. 11. Revised mechanical EQ locations to match the interior layout of the store. 12. Revised electrical plans to compliment the change of interior EQ and lighting.

Permit Reviews

Permit Number - TC-COM-0223-00675
Permit Status: Issued
Permit Description: New single story coffee shop with drive thru REV1_Changes to the plans include, but are not limited too: 1. Revised drive through lane configuration and equipment 2. Revised interior wall configuration 3. Revised patio trellis/cover system (footprint remains the same) 4. Revised interior finish system 5. Revised ceiling elements, lighting, and finishes 6. Revised roof layout to blend better with interior layout. 7. Revised exterior finish systems and signage (signage to be a deferred submittal) 8. Revised equipment package for a Black Rifle Coffee Company store 9. Revised structural system to support new exterior design and roof EQ placement 10. Revised interior plumbing plans to match to the new interior EQ layout. 11. Revised mechanical EQ locations to match the interior layout of the store. 12. Revised electrical plans to compliment the change of interior EQ and lighting.
Start Date Submittal Complete Date Status  
05/17/2023 RESTAMP - COMMERCIAL v.1 05/18/2023 APPROVED Review Details
05/30/2025 COMMERCIAL REVIEW - FULL v.2 06/05/2025 APPROVED Review Details
03/06/2023 COMMERCIAL REVIEW - FULL v.1 03/29/2023 REQUIRES RESUBMIT Review Details
09/24/2025 RESTAMP - COMMERCIAL v.1 09/25/2025 APPROVED Review Details
05/01/2023 COMMERCIAL REVIEW - FULL v.2 05/17/2023 APPROVED Review Details
04/16/2025 COMMERCIAL REVIEW - FULL v.1 05/21/2025 REQUIRES RESUBMIT Review Details
06/05/2025 RESTAMP - COMMERCIAL v.1 06/09/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0223-00675
Permit Status: Issued
Permit Description: New single story coffee shop with drive thru REV1_Changes to the plans include, but are not limited too: 1. Revised drive through lane configuration and equipment 2. Revised interior wall configuration 3. Revised patio trellis/cover system (footprint remains the same) 4. Revised interior finish system 5. Revised ceiling elements, lighting, and finishes 6. Revised roof layout to blend better with interior layout. 7. Revised exterior finish systems and signage (signage to be a deferred submittal) 8. Revised equipment package for a Black Rifle Coffee Company store 9. Revised structural system to support new exterior design and roof EQ placement 10. Revised interior plumbing plans to match to the new interior EQ layout. 11. Revised mechanical EQ locations to match the interior layout of the store. 12. Revised electrical plans to compliment the change of interior EQ and lighting.
Total Outstanding Activity Conditions - 4
Date Name
05/12/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/12/2023 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
05/12/2023 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
05/12/2023 SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED.

Conditions

Permit Number - TC-COM-0223-00675
Permit Status: Issued
Permit Description: New single story coffee shop with drive thru REV1_Changes to the plans include, but are not limited too: 1. Revised drive through lane configuration and equipment 2. Revised interior wall configuration 3. Revised patio trellis/cover system (footprint remains the same) 4. Revised interior finish system 5. Revised ceiling elements, lighting, and finishes 6. Revised roof layout to blend better with interior layout. 7. Revised exterior finish systems and signage (signage to be a deferred submittal) 8. Revised equipment package for a Black Rifle Coffee Company store 9. Revised structural system to support new exterior design and roof EQ placement 10. Revised interior plumbing plans to match to the new interior EQ layout. 11. Revised mechanical EQ locations to match the interior layout of the store. 12. Revised electrical plans to compliment the change of interior EQ and lighting.
Date Description Comments
05/12/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
05/18/2023 Prior to Issuance of Revision: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
01/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0223-00675
Permite Description: New single story coffee shop with drive thru REV1_Changes to the plans include, but are not limited too: 1. Revised drive through lane configuration and equipment 2. Revised interior wall configuration 3. Revised patio trellis/cover system (footprint remains the same) 4. Revised interior finish system 5. Revised ceiling elements, lighting, and finishes 6. Revised roof layout to blend better with interior layout. 7. Revised exterior finish systems and signage (signage to be a deferred submittal) 8. Revised equipment package for a Black Rifle Coffee Company store 9. Revised structural system to support new exterior design and roof EQ placement 10. Revised interior plumbing plans to match to the new interior EQ layout. 11. Revised mechanical EQ locations to match the interior layout of the store. 12. Revised electrical plans to compliment the change of interior EQ and lighting.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
09/04/2025 BULD - Electrical Clearance N/A Partial Pass 9/4/25: TMPP TEP CLEARANCE FOR 3450 S KINO PKWY
09/05/2025 COT - HCBU - Building Progress N/A Partial Pass 9-5-25: drywall nail inspection at north service wall approved. Okay to tape/ texture and continue with construction at progress areas
09/23/2025 COT - HCBU - Framing N/A Re-inspection required 9-23-25: add nails/screws to exterior sheathing per schedule, add shot pins at marked locations-Shot pins are required within 12" at the end of a plate and every 24" o.c... Submit a revision for interior soffit framing. Most current plans from 4/4/25 do not show soffit layout with dimensions. It appears current layout of installed soffits were used using the plans from 2023 and those details are conflicting.
10/17/2025 COT - HCEL - Electrical Above Ceiling N/A Partial Pass 10-17-25: partial pass-pending electrical at rooftop. Electrical above ceiling at exterior of building verified per plans-Okay to continue with construction at progress areas.
10/31/2025 COT - HCEL - Electrical Underground N/A Partial Pass 10-31-25: verified electrical schedule 40 conduits & 20' of #4GRD at each light pole cage. Slab on grade for west patio approved-okay for concrete placement (columns located against the wall at west patio have been omitted from original plans-revision has been submitted). Pergola framing & hardware approved-pergola was extended 3' out on north end (revision has been submitted). Okay to continue with construction at progress areas.
11/12/2025 COT - HCPL - Plumbing Intermediate N/A Partial Pass House side of gas line extended to new location on trash enclosure. Ok to.cover progress area.
11/24/2025 COT - HCPL - Plumbing Progress N/A Partial Pass 11/24/2025 partial pass. Main water line from backflow up to new riser location. On test with tracer wire. Ensure blue tape is in place after first lift of compaction. Okay to backfill progress areas. Shading required.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0223-00675
Permit Description: New single story coffee shop with drive thru REV1_Changes to the plans include, but are not limited too: 1. Revised drive through lane configuration and equipment 2. Revised interior wall configuration 3. Revised patio trellis/cover system (footprint remains the same) 4. Revised interior finish system 5. Revised ceiling elements, lighting, and finishes 6. Revised roof layout to blend better with interior layout. 7. Revised exterior finish systems and signage (signage to be a deferred submittal) 8. Revised equipment package for a Black Rifle Coffee Company store 9. Revised structural system to support new exterior design and roof EQ placement 10. Revised interior plumbing plans to match to the new interior EQ layout. 11. Revised mechanical EQ locations to match the interior layout of the store. 12. Revised electrical plans to compliment the change of interior EQ and lighting.
Total Completed Inspections - 10
Date Description Inspector Results Comments
07/16/2025 COT - HCBU - Excavation/Rebar/Zoning Passed Ensure footings are free of water before placing concrete.
07/18/2025 COT - HCEL - Grounding/Bonding Passed
07/28/2025 COT - HCPL - Sewer Passed Waste and vent lines at 2” - 3” under slab area. Sewer line connected to main sewer line. OK to cover progress areas.
08/01/2025 COT - HCPL - Rough Soil Passed 8-1-25: previously inspected & approved by J. Burge.
08/06/2025 COT - HCBU - Preslab Passed OK to place concrete in progress areas.
08/22/2025 COT - HCBU - Exterior Clips/Sheathing Passed Ok to cover exterior walls.
09/04/2025 COT - HCPL - Plumbing Roof Drains Passed
09/19/2025 COT - HCBU - Building Above Ceiling Passed
09/19/2025 COT - HCEL - Electrical Intermediate Passed Ok to insulate and sheet rock throughout.
10/07/2025 COT - HCBU - Framing Passed Sheet rock nailing; OK to tape throughout building.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-BRCC - TUCSON, AZ - REV 1 - PERMIT SET - 25.04.04 (1)_V1.PDF DOCUMENTS VIEW
ELECTRICALCOMCHECK_V1.PDF DOCUMENTS VIEW
STRUCTURAL CALCS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REV 1 - PERMIT SET - 25.04.04 (1)_V1.PDF DOCUMENTS VIEW
BUILDING RESPONSE LETTER 2025.05.30_V1.PDF DOCUMENTS VIEW
CONS-COFFEE BEAN TUSCON KINO PARKWAY PERMIT SET 02.1523_V1.PDF DOCUMENTS VIEW
CONS-CBTL TUCSON REV 1-4 COMBINED 4.24.23_V1.PDF DOCUMENTS VIEW
CONS-CBTL TUCSON REV 1-4 COMBINED 4.24.23_V1.PDF DOCUMENTS VIEW
22-1785 SEALED CALC PACKAGE_V1.PDF DOCUMENTS VIEW
CONS-COFFEE BEAN TUSCON KINO PARKWAY PERMIT SET 02.1523_V1.PDF DOCUMENTS VIEW