Permit: TC-COM-0223-00675

Parcel: 13213123A


Addresses:

3450 S KINO PW

Inspection Status: Passed

Inspection History: COT - HCEL - Electrical Underground 

Date Description Inspector Results Comments
01/23/2026 COT - HCEL - Electrical Underground  Passed
08/01/2025 COT - HCEL - Electrical Underground  Partial Pass 8-1-25: verified Schedule 40 conduits per plans on 2-1" for kitchen and 5-3/4" for secondary conduits all under slab. Okay to continue with construction at progress areas.
08/11/2025 COT - HCEL - Electrical Underground  Partial Pass Partial pass. X2 4” Primaries from transformer to new panel location. 8/11/2025
08/12/2025 COT - HCEL - Electrical Underground  Partial Pass Electric conduits at 1” - 1 1/2” to menu board and light pole (Northeast corner). Ok to cover progress areas.
08/15/2025 COT - HCEL - Electrical Underground  Partial Pass 8-15-25: verified 2-3/4" secondary electrical conduits for light poles west to southeast. Okay to backfill approximately 60' of open trench.
08/19/2025 COT - HCEL - Electrical Underground  Partial Pass 8-19-25: verified trench depth 1-3/4" Schedule 40 conduit for south-southeast light pole. Okay to backfill approximately 60' of trench.
10/31/2025 COT - HCEL - Electrical Underground  Partial Pass 10-31-25: verified electrical schedule 40 conduits & 20' of #4GRD at each light pole cage. Slab on grade for west patio approved-okay for concrete placement (columns located against the wall at west patio have been omitted from original plans-revision has been submitted). Pergola framing & hardware approved-pergola was extended 3' out on north end (revision has been submitted). Okay to continue with construction at progress areas.