Permit Details

Status:
Complete
Type:
Commercial Building
Address:
1620 N HALRON CT
Address NEW:
1620 N HALRON CT
Apply Date:
01/19/2023
Applicant:
Bill Clayton
Description:
New, Ground Up, Commercial Building for storage. Pre Fabricated metal building. Please reference DP22-0156 for approved development plan.

Permit Reviews

Permit Number - TC-COM-0123-00509
Permit Status: Complete
Permit Description: New, Ground Up, Commercial Building for storage. Pre Fabricated metal building. Please reference DP22-0156 for approved development plan.
Start Date Submittal Complete Date Status  
10/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.3 10/03/2025 REQUIRES RESUBMIT Review Details
02/08/2023 COMMERCIAL REVIEW - FULL v.1 03/09/2023 REQUIRES RESUBMIT Review Details
05/05/2023 RESTAMP - COMMERCIAL v.3 05/18/2023 APPROVED Review Details
04/28/2023 RESTAMP - COMMERCIAL v.1 05/01/2023 REQUIRES RESUBMIT Review Details
06/20/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/23/2025 APPROVED Review Details
10/22/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.4 10/23/2025 APPROVED Review Details
04/07/2023 COMMERCIAL REVIEW - FULL v.2 04/28/2023 APPROVED Review Details
09/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/18/2025 REQUIRES RESUBMIT Review Details
05/03/2023 RESTAMP - COMMERCIAL v.2 05/04/2023 REQUIRES RESUBMIT Review Details
05/18/2023 RESTAMP - COMMERCIAL v.1 05/18/2023 APPROVED Review Details
09/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 09/25/2025 REQUIRES RESUBMIT Review Details
06/09/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/09/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0123-00509
Permit Status: Complete
Permit Description: New, Ground Up, Commercial Building for storage. Pre Fabricated metal building. Please reference DP22-0156 for approved development plan.
Date Description Comments
06/09/2025 AIR BALANCING REPORT IS REQUIRED.
06/09/2025 COMMISSIONING REPORT IS REQUIRED.
06/09/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/07/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
06/09/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/09/2025 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/09/2025 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
06/09/2025 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
06/09/2025 Masonry Inspection Report submittal review is required.
04/14/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0123-00509
Permite Description: New, Ground Up, Commercial Building for storage. Pre Fabricated metal building. Please reference DP22-0156 for approved development plan.
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
06/07/2023 COT - HCPL - Plumbing Progress N/A Partial Pass Plumbing underneath the slab per plan. Okay to backfill. Shading required. 6/7/2023
01/17/2025 COT - HCEL - Electrical Above Ceiling N/A Not Ready
08/13/2024 COT - HCEL - Electrical Intermediate N/A Not Ready
01/31/2025 COT - BULD - SWG Clearance N/A Not Applicable
01/31/2025 COT - HCBU - Building Above Ceiling N/A Not Applicable
01/31/2025 COT - HCEL - Electrical Underground N/A Not Applicable
01/31/2025 COT - HCME - Mechanical Above Ceiling N/A Not Applicable
01/31/2025 COT - HCME - Mechanical Intermediate N/A Re-inspection required 1-Install exhaust fans per plans. 2-Finish ductwork.
02/10/2025 COT - HCME - Mechanical Final N/A Not Ready Pass intermediate first.
01/31/2025 COT - HCBU - Building Final N/A Not Ready work incomplete
08/29/2025 ENGR Engineering Final N/A Not Ready 12’ Address numbers need to fixed to top of wall facing Halron CT. Okay for TCO level 4.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0123-00509
Permit Description: New, Ground Up, Commercial Building for storage. Pre Fabricated metal building. Please reference DP22-0156 for approved development plan.
Total Completed Inspections - 27
Date Description Inspector Results Comments
06/07/2023 COT - HCPL - Rough Soil Passed Plumbing underneath the slab per plan. Okay to backfill. Shading required. 6/7/2023
07/11/2023 COT - HCBU - Excavation/Rebar/Zoning Passed
07/11/2023 COT - HCBU - Preslab Passed
11/17/2023 COT - HCBU - Building Progress Passed Metal building erected.
04/12/2024 COT - HCPL - Plumbing Progress Passed
08/13/2024 COT - HCEL - Electrical Progress Passed
08/13/2024 BULD - Electrical Clearance Passed
11/01/2024 COT - HCBU - Framing Passed
01/17/2025 COT - HCPL - Plumbing Above Ceiling Passed
01/17/2025 COT - HCPL - Plumbing Intermediate Passed
01/17/2025 COT - HCBU - Roof Nailing Passed
01/24/2025 COT - HCEL - Electrical Above Ceiling Passed
01/24/2025 COT - HCEL - Electrical Intermediate Passed
01/31/2025 TRSP - ROW - Final/Close-Out Passed
01/31/2025 COT - HCBU - Exterior Clips/Sheathing Passed
01/31/2025 COT - HCEL - Outdoor Lighting Passed
01/31/2025 COT - HCME - Mechanical Progress Passed
02/07/2025 COT - HCME - Mechanical Intermediate Passed
05/28/2025 COT - FCON - Alarm - Final Passed
05/28/2025 COT - FCON - Sprinkler - Final Passed
05/28/2025 COT - HCME - Mechanical Final Passed
05/28/2025 COT - HCEL - Electrical Final Passed
06/06/2025 COT - HCPL - Plumbing Final Passed Bacteria testing results forwarded to Bob Sherry.
06/06/2025 COT - FCON - Fire - Final Passed
08/29/2025 COT - HCBU - Building Final Passed
08/29/2025 COT - HCBU - CofO Passed
09/05/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
TC-COM-0123-00509_CLAYTON WAREHOUSE_63251238 - SIGNED_V1.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
CLAYTONWAREHOUSE_V1.PDF DOCUMENTS VIEW
25F0129_1 TURNERRES 06 05 2025 1107_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-3_RAH CLAYTON WAREHOUSE_V3.PDF DOCUMENTS VIEW
CONS-2_RAH CLAYTON WAREHOUSE_V2.PDF DOCUMENTS VIEW
CLAYTON SYSTEM DESIGN REPORT_V1.PDF DOCUMENTS VIEW
COT_PERMIT RESPONSE TC-COM-0123-00509_V1.PDF DOCUMENTS VIEW
1_CLAYTON DESIGN CALCULATION_V1_V1.PDF DOCUMENTS VIEW
1_CLAYTON MECH CHECK_V2.PDF DOCUMENTS VIEW