Permit: T99CM01110
Permit Details
Apply Date:
03/15/1999
Applicant:
M3 ENGINEERING RUBEN SIBAYAN
Description:
FOUNDATION:GLOBAL EXPRESS PAINT FACILITY
Contractors:
- TL ROOF AND ASSOCIATES
Outstanding Inspections
Permit Status: Closed
Permit Number: T99CM01110
Permite Description: FOUNDATION:GLOBAL EXPRESS PAINT FACILITY
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| BUILDING - FINAL | N/A | Not Inspected | ||
| FIRE SPKLR - UG, PIPING, HYDRO | N/A | Not Inspected | ||
| FIRE SPKLR - UG PIPING FLUSH | N/A | Not Inspected | ||
| 05/18/1999 | EXCAVATION/LAYOUT REBAR & ZON | N/A | Not ready for Inspection | IVRS - Inspection 0000* |
| 06/04/1999 | BUILDING PRE-SLAB | N/A | Partial Approval | IVRS - Inspection 0000* |
| 06/09/1999 | REINFORCED MASONRY PRE-GROUT | N/A | Partial Approval | IVRS - Inspection 0000* |
Completed Inspections
Permit Status: Closed
Permit Number: T99CM01110
Permit Description: FOUNDATION:GLOBAL EXPRESS PAINT FACILITY
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/1999 | PLUMBING - ROUGH, SOIL | R.ROOK | Approved | APPROVED |
| 05/13/1999 | ELECTRIC - UNDERGROUND | JORTA | Approved | PARTIAL APPROVAL |
| 09/15/1999 | PLUMBING - FINAL | PALMER | Approved | ADDTL COMMS - 11/16/99 PERFORMED AN ON-SITE OBSERVATION INSPECTION OF ITEM 03090 EYEWASH, BREATHING AIR, COMPRESSED AIR, DEIONIZED WATER AND DOMESTIC WATER PIPING INSTALLATIONS IN THE NORTH WALL OF THE HANGAR FROM THE TOP OF THE WALL ELEVATION TO APROXIMATELY 5-0 ABOVE FINISHED FLOOR. INSTRUCTED THE CONTRACTOR TO PROVIDE ISOLATION DEVICES ON THE COPPER PIPING RISERS WHERE THE PIPING IS IN CONTACT WITH FERROUS METAL WALL STRUCTURAL COMPONENTS. PERFORMED AN ON-SITE OBSERVATION OF THE REMAINING 30 PERCENT OF ITEM 03090 PLUMBING COPPER DOMESTIC WATER PIPING FOR THE SHOP AND OFFICE AREAS ON THE WEST SIDE OF THE STRUCTURE. THE ADDITIONAL WATER HAMMER ARRESTER DEVICES HAVE BEEN INSTALLED IN THIS PIPING INSTALLATION AS PREVIOUSLY REQUESTED. |
| 10/20/1999 | PLUMBING - YARD WTR LINE/TEST | RROOK | Approved | ADDTL COMMS - 10/20/99 THE FOLLOWING ITEMS WERE THE ONLY ITEMS OBSERVED ON THIS DATE. PERFORMED AN ON-SITE OBSERVATION INSPECTION OF THE ITEM 03040 YARD LINE 20 INCH UNDERGROUND AFFF WASTE WATER PIPING INSTALLATION FROM THE PUMPING STATION AT THE SOUTHEAST CORNER OF THE HANGAR TO THE HOLDING TANK EAST OF THE SITE. THERE WERE NO THRUST BLOCKS INSTALLED AT THE VARIOUS CHANGES IN DIRECTION (AT LEAST FOUR INVOLVED). INSTRUCTED CONTRACTOR TO CONSULT WITH THE RESPONSIBLE ENGINEER CONCERNING THIS REQUIREMENT. OTHERWISE, THIS PIPING INSTALLATION WAS DETERMINED TO BE INSTALLED IN CONFORMANCE WITH THE CONTRACT DOCUMENTS AND APPLICABLE CODE REQUIREMENTS. THE CONTRACTOR WAS FERFORMING A SATISFACTORY PNEUMATIC PRESSURE TEST ON THIS PIPING INSTALLATION AT HTIS TIME.PERFORMED AN ON-SITE OBSERVATION INSPECTION OF THE OVERALL EYEWASH WATER,DOMESTIC WATER, DEIONIZED WATER, COMPRESSED AIR AND BREATHING AIR PIPING WATER THROUGH THE HANGAR AND CORRIDOR AREAS.THIS PIPING IS NOW TIED TOGETHER AS A FULLY OPERATIONAL SYSTEM. THIS PIPING INSTALLATION WAS DETERMINED TO BE INSTALLED IN CONFORMANCE WITH THE CONTRACT DOCUMENTS AND APPLICABLE CODE REQUIREMENTS, THE CONTRACTOR WAS PERFORMING A SATISFACTORY HYDROSTATIC PRESSURE TEST ON THIS PIPING INSTALLATION AT THIS TIME. |