Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T99CM01110


Addresses:

1255 E AERO PARK BL

Inspection Status: Correction Required

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
09/15/1999 PLUMBING - FINAL Correction Required ADDTL COMMS - 11/16/99 PERFORMED AN ON-SITE OBSERVATION INSPECTION OF ITEM 03090 EYEWASH, BREATHING AIR, COMPRESSED AIR, DEIONIZED WATER AND DOMESTIC WATER PIPING INSTALLATIONS IN THE NORTH WALL OF THE HANGAR FROM THE TOP OF THE WALL ELEVATION TO APROXIMATELY 5-0 ABOVE FINISHED FLOOR. INSTRUCTED THE CONTRACTOR TO PROVIDE ISOLATION DEVICES ON THE COPPER PIPING RISERS WHERE THE PIPING IS IN CONTACT WITH FERROUS METAL WALL STRUCTURAL COMPONENTS. PERFORMED AN ON-SITE OBSERVATION OF THE REMAINING 30 PERCENT OF ITEM 03090 PLUMBING COPPER DOMESTIC WATER PIPING FOR THE SHOP AND OFFICE AREAS ON THE WEST SIDE OF THE STRUCTURE. THE ADDITIONAL WATER HAMMER ARRESTER DEVICES HAVE BEEN INSTALLED IN THIS PIPING INSTALLATION AS PREVIOUSLY REQUESTED.
09/13/1999 PLUMBING - FINAL Correction Required ADDTL COMMS - PERFORMED AN ON-SITE OBSERVATION INSPECTION OF ITEM 03090 EYEWASH, BREATHING AIR, COMPRESSED AIR, DEIONIZED WATER AND DOMESTIC WATER PIPING IN THE SOUTH WALL OF THE HANGAR FROM THE TOP OF THE WALL ELEVATION TO APPROXIMATELY 5-0 ABOVE FINISHED FLOOR. THIS PIPING INSTALLATION WAS DETERMINED TO BE INSTALLED IN CONFORMANCE WITH THE CONTRACT DOCUMENTS AND APPLICABLE CODES REQUIREMENTS. THE CONTRACTOR WAS PERFORMING A SATISFCTORY PNEUMATIC PRESSURE TEST ON THIS PIPING INSTALLATION AT THIS TIME. THE PLUMBING FOREMAN WAS INSTRUCTED TO SUPPORT OVERHEAD POLY VINYL CHLORIDE, PVC, PIPING AT 40 ON CENTERS ON RIGID UNISTRUCT MATERIAL. THE ADDITIONAL WATER HAMMER ARRESTER DEVICES HAVE BEEN INSTALLED IN THIS PIPING INSTALLATION AS PREVIOUSLY REQUESTED.
08/20/1999 PLUMBING - FINAL Correction Required ADDTL COMMS - PERFORMED AN ON SITE OBSERVATION INSPECTION OF 70% OF ITEM 03090 PLUMBING FINAL OF THE COPPER DOMESTIC WATER PIPING FOR THE SHOP AND OFFICE AREAS AT THE SOUTHWEST END OF THE COMPLEX. THIS PIPING INSTALLATION WAS DETERMINED TO BE INSTALLED IN CONFORMANCE WITH THE CONTRACT DOCUMENTS AND APPLICABE CODES REQUIREMENTS. THE CONTRACTOR WAS PERFORMING A SATISFACTORY HYDRSTATIC. PRESSURE TEST ON THIS PIPING INSTALLATION AT THIS TIME. IT WAS REQUESTED THAT THE CONTRACTOR ADD WATER HAMMER ARRESTER DEVICES AT THREE LOCATIONS TO INSURE A MORE POSITIVE PROTECTION FROM WATER HAMMER CREATED BY QUICK CLOSING VALUES. INSULATION OF THE DOMESTIC HOT WATER PIPING WAS ALSO DISCUSSED WITH THE CONTRATOR.REFER TO FIELD REPORT #9
08/20/1999 PLUMBING - FINAL Partial Approval PALMER ENG.