Permit: T99BU02954
Permit Details
Apply Date:
10/26/1999
Applicant:
JEFF STANLEY
Description:
GRADING: 15,000 CY CUT & 15,400 CY FILL
Contractors:
- MILLER BUILDER , JOHN WESLE
Permit Reviews
Permit Number - T99BU02954
Permit Status: Expired
Permit Description: GRADING: 15,000 CY CUT & 15,400 CY FILL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/01/2004 | REVISION - GRADING | 04/23/2004 | COMPLETED |
04/01/2004 | REVISION - GRADING | 04/30/2004 | COMPLETED |
Outstanding Inspections
Permit Status: Expired
Permit Number: T99BU02954
Permite Description: GRADING: 15,000 CY CUT & 15,400 CY FILL
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2005 | GRADING - FINAL | N/A | Not ready for Inspection | This is not the Final Punch List. Other items may come up as project nears completion. 1- Provide letter from engineer certifing drainage ways and basins. Per Chapter XIV, Section 14.2 (7). 2- Remove straw bales from around catch basins. 3- Remove all silt from detention basin A. Grade basin inlets to stop ponding and provide postive flow. 4- Remove all vegetation from rock pads on scupper inlets. 5- Provide permanent stabiliation for all unbuilt lots. 6- After all areas in site have been stabilized remove all BMPs. 7- Complete all sidewalk work. 8- Install drainage channel on eastside of project per approved plans. Detail A-A, Sheet 4. 9- Complete all street striping. 10- Clean all silt and trash out of drainage channel eastside of project and provide postive flow to detention basin. 11- Construct all catch basins in detention basin A per approved plans. 12- Clear all pedestrian refuge areas of debris and vegetation. 13- Install roadway between Historico and Laos per the approved drawing. 14- Make repairs to cracking valley gutter. 15- Provide stabilization eastside of Souther Pacific Ave. 16- Install all HC ramps per C of T standards. This is not the final punch list. |
Completed Inspections
Permit Status: Expired
Permit Number: T99BU02954
Permit Description: GRADING: 15,000 CY CUT & 15,400 CY FILL
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/22/2006 | STORMWATER FOLLOW-UP INSP | MAVERY | Approved | Contractor starting to stabilize open lots. |
10/18/2007 | STORMWATER INSTALL OF CONTROLS | MAVERY | Approved | All areas stabilized. |
10/18/2007 | ENGINEERING PRE-CONSTRUCTION | MAVERY | Approved | All areas stabilized. |
05/08/2008 | STORMWATER FINAL INSPECTION | DROBERTS | Approved |